<strong>GE</strong> Digital Energy<br />

4.5 Inverter disturbance<br />

Mains<br />

Load<br />

“Inverter disturbance mode” is triggered by a disturbance<br />

in one or more inverters.<br />

Q2<br />

K6<br />

Q4<br />

K3<br />

SSM<br />

K7<br />

Q1<br />

As long as the output of the remaining single units<br />

is sufficient to sustain the load, RPA remains in online<br />

mode – but the system may become “parallel”<br />

and is no longer “redundant”.<br />

Q2<br />

K6<br />

Q4<br />

SSM<br />

K7<br />

Q1<br />

The inverter output contactor (K7) of the disturbed<br />

unit opens automatically to isolate the disturbed<br />

unit from the load.<br />

Q2<br />

K6<br />

Q4<br />

4.6 Bypass mode<br />

Mains<br />

Q2<br />

K6<br />

Q4<br />

Q2<br />

K6<br />

Q4<br />

Q2<br />

K3<br />

K3<br />

K3<br />

K3<br />

SSM<br />

SSM<br />

SSM<br />

K7<br />

K7<br />

K7<br />

Q1<br />

The rectifiers of the disturbed units, depending on<br />

the nature of the disturbance, will continue to<br />

charge the batteries.<br />

The disturbed units can also be completely separated<br />

from the utility and from the load, as illustrated,<br />

to enable repair work to be carried out.<br />

TEMPORARY<br />

Q1<br />

Q1<br />

Load<br />

“Bypass mode” is triggered when all the available<br />

inverters are unable to sustain the load (e.g. in the<br />

case of disturbance of several inverters or severe<br />

overload).<br />

If the load exceeds 110% of the sum of the rated<br />

outputs of all inverters, the load will be sustained<br />

directly from the utility via the static bypasses.<br />

All inverter output contactors (K7) are opened automatically<br />

and the inverters, depending on the<br />

type of disturbance, continue to operate and the<br />

rectifiers continue to charge the batteries.<br />

K6<br />

Q4<br />

K3<br />

SSM<br />

K7<br />

Q1<br />

If the load level once again returns below 100% of<br />

the sum of the outputs of all the available inverters,<br />

RPA will close all K7 and automatically switches<br />

back to “On-line mode”.<br />

PRD_SPE_XXX_10K_M50_6GB_V030<br />

Printed in Switzerland - Modifications reserved<br />

10/13<br />

Product Description <strong>SitePro</strong> 10-500 kVA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!