<strong>GE</strong> Digital Energy<br />

4.3 Battery mode<br />

Mains<br />

Load<br />

Q2<br />

K6<br />

Q4<br />

K3<br />

SSM<br />

K7<br />

Q1<br />

A utility failure will trigger “Battery Mode”.<br />

The rectifiers do not supply any energy.<br />

The batteries supply the inverters with the required<br />

energy.<br />

Q2<br />

K6<br />

Q4<br />

SSM<br />

K7<br />

Q1<br />

If the utility does not recover and the batteries are<br />

used up, the load will be cut off.<br />

Q2<br />

K3<br />

In this situation, when the utility recovers, the load<br />

will be supplied by the parallel bypass.,<br />

4.4 Rectifier failure<br />

Mains<br />

K6<br />

Q4<br />

K3<br />

SSM<br />

K7<br />

Q1<br />

For security reasons, the inverters will have to be<br />

switched on manually.<br />

TEMPORARY<br />

Load<br />

Q2<br />

K6<br />

SSM<br />

Q4<br />

K3<br />

K7<br />

Q1<br />

In case the rectifier fails the batteries supply the inverter<br />

with the required energy.<br />

Q2<br />

K6<br />

Q4<br />

Q2<br />

K3<br />

SSM<br />

K7<br />

Q1<br />

In case the utility is not available and the batteries<br />

are used up, the inverter will be switched off.<br />

In a redundant parallel system the other units will<br />

continue to supply the load.<br />

K6<br />

SSM<br />

Q1<br />

Q4<br />

K7<br />

K3<br />

PRD_SPE_XXX_10K_M50_6GB_V030<br />

Printed in Switzerland - Modifications reserved<br />

9/13<br />

Product Description <strong>SitePro</strong> 10-500 kVA