GE SitePro Brochure.pdf - Gruber Power
GE SitePro Brochure.pdf - Gruber Power
GE SitePro Brochure.pdf - Gruber Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
g<br />
<strong>GE</strong> Digital Energy<br />
4.3 Battery mode<br />
Mains<br />
Load<br />
Q2<br />
K6<br />
Q4<br />
K3<br />
SSM<br />
K7<br />
Q1<br />
A utility failure will trigger “Battery Mode”.<br />
The rectifiers do not supply any energy.<br />
The batteries supply the inverters with the required<br />
energy.<br />
Q2<br />
K6<br />
Q4<br />
SSM<br />
K7<br />
Q1<br />
If the utility does not recover and the batteries are<br />
used up, the load will be cut off.<br />
Q2<br />
K3<br />
In this situation, when the utility recovers, the load<br />
will be supplied by the parallel bypass.,<br />
4.4 Rectifier failure<br />
Mains<br />
K6<br />
Q4<br />
K3<br />
SSM<br />
K7<br />
Q1<br />
For security reasons, the inverters will have to be<br />
switched on manually.<br />
TEMPORARY<br />
Load<br />
Q2<br />
K6<br />
SSM<br />
Q4<br />
K3<br />
K7<br />
Q1<br />
In case the rectifier fails the batteries supply the inverter<br />
with the required energy.<br />
Q2<br />
K6<br />
Q4<br />
Q2<br />
K3<br />
SSM<br />
K7<br />
Q1<br />
In case the utility is not available and the batteries<br />
are used up, the inverter will be switched off.<br />
In a redundant parallel system the other units will<br />
continue to supply the load.<br />
K6<br />
SSM<br />
Q1<br />
Q4<br />
K7<br />
K3<br />
PRD_SPE_XXX_10K_M50_6GB_V030<br />
Printed in Switzerland - Modifications reserved<br />
9/13<br />
Product Description <strong>SitePro</strong> 10-500 kVA