Page 7 of7<br />

the property which can potentialy suffer significant adverse impacts from project implementation. This<br />

This includes impacts on the integrity of the site <strong>and</strong> its setting. If such impacts are found the site must<br />

site must be professionally recorded with SHPO <strong>and</strong> sensitive areas must be inventoried thoroughly<br />

thoroughly prior to development, avoided entirely, or protected through some other method approved<br />

approved by the NHPA<br />

Completion of the above inventories, impact analysis <strong>and</strong> implementation of alternatives or<br />

or mitigation measures to reduce potential significant adverse impacts of the project to a level of<br />

insignificance cannot be dismissed merely on the basis of financial infeasibility. To do so denies the<br />

the purpose of the National Environmental Policy Act. If there are not enough funds to do an adequate<br />

adequate DEIS <strong>and</strong> if there are not enough funds to carry out a project which does not have a significant<br />

significant adverse impact on the environment, then perhaps the project just should not happen.<br />

12/1612010