3.23 T & P physical Check. (Healthiness and Quality)<br />
(a) P.P.rope. (b) Wire rope and sling. (d) Earthling rode<br />
3.3 If above-mentioned safety requirements found violated in any of the above three<br />
conditions shall attract penalty of Rs. 1000/- per occasion. (Max.Rs.3000/-- for violation<br />
of three conditions)<br />
3.4 During subsequent visit, if violation is found, then double penalty shall be deducted<br />
from the bill of the contractor/Agency.<br />
46. Safety guide for Contractors during work<br />
In spite of safety measure & guide lines by GETCO regarding safety for contractor’s<br />
labour, accidents are continued to occur to contractor’s labours. In this condition please<br />
ensure following guidelines while working on lines.<br />
1. The method of work required T&P and man power should be discussed between<br />
GETCO supervisor, contractor’s supervisor and gang leaders.<br />
2. Prior to execution of work a joint survey must be conducted by GETCO supervisor,<br />
contractor’s supervisor and DISCOM line man in order to identify the following:<br />
• HT/LT line or tap line crossing under each span of line of the work.<br />
• Isolation point of each line crossing must be checked.<br />
• Each line crossing & isolation point under each span must be discussed and<br />
noted in maintenance register with sketch.<br />
3. While execution of stringing work the identified line crossing must be isolated / deenergized<br />
and written clearance should be obtained from concerned DISCOM<br />
supervisor.<br />
4. The isolation of Tap line must be physically seen and verified by contractor.<br />
5. Contractor’s supervisor must take LCP for EHV line and power line crossing.<br />
6. At D.O. fuse junction contractors person should be posted to ensure that no person<br />
restore D.O supply while work is under execution.<br />
7. Contractor’s supervisor must ensure all isolation physically prior to give clearance to<br />
gang leader for talking up job.<br />
8. Earthling must be done at the place of work before execution of any work.<br />
9. Live line Detector should be used to check de-energisation of line before start of<br />
work.<br />
10. Earthing materials and tools of contractor shall be verified before starting of work.<br />
11. <strong>No</strong> work by contractor labour without their supervision.<br />
The above guidelines along with safety instruction as per annexure: A is attached<br />
herewith shall be scrupulously implemented and this shall be part of the contract.<br />