3.23 T & P physical Check. (Healthiness and Quality)<br />

(a) P.P.rope. (b) Wire rope and sling. (d) Earthling rode<br />

3.3 If above-mentioned safety requirements found violated in any of the above three<br />

conditions shall attract penalty of Rs. 1000/- per occasion. (Max.Rs.3000/-- for violation<br />

of three conditions)<br />

3.4 During subsequent visit, if violation is found, then double penalty shall be deducted<br />

from the bill of the contractor/Agency.<br />

46. Safety guide for Contractors during work<br />

In spite of safety measure & guide lines by GETCO regarding safety for contractor’s<br />

labour, accidents are continued to occur to contractor’s labours. In this condition please<br />

ensure following guidelines while working on lines.<br />

1. The method of work required T&P and man power should be discussed between<br />

GETCO supervisor, contractor’s supervisor and gang leaders.<br />

2. Prior to execution of work a joint survey must be conducted by GETCO supervisor,<br />

contractor’s supervisor and DISCOM line man in order to identify the following:<br />

• HT/LT line or tap line crossing under each span of line of the work.<br />

• Isolation point of each line crossing must be checked.<br />

• Each line crossing & isolation point under each span must be discussed and<br />

noted in maintenance register with sketch.<br />

3. While execution of stringing work the identified line crossing must be isolated / deenergized<br />

and written clearance should be obtained from concerned DISCOM<br />

supervisor.<br />

4. The isolation of Tap line must be physically seen and verified by contractor.<br />

5. Contractor’s supervisor must take LCP for EHV line and power line crossing.<br />

6. At D.O. fuse junction contractors person should be posted to ensure that no person<br />

restore D.O supply while work is under execution.<br />

7. Contractor’s supervisor must ensure all isolation physically prior to give clearance to<br />

gang leader for talking up job.<br />

8. Earthling must be done at the place of work before execution of any work.<br />

9. Live line Detector should be used to check de-energisation of line before start of<br />

work.<br />

10. Earthing materials and tools of contractor shall be verified before starting of work.<br />

11. <strong>No</strong> work by contractor labour without their supervision.<br />

The above guidelines along with safety instruction as per annexure: A is attached<br />

herewith shall be scrupulously implemented and this shall be part of the contract.<br />

Page 34 of 78