The rate quoted shall be inclusive of all labour, materials, tools, tackles, machinery etc. for all<br />

operation mentioned above. Payment shall be made for excavated net quantity as per plan, plus<br />

permissible side slope wherever necessary as per I.S.<br />

Item <strong>No</strong>. 17: Providing B.B masonry in foundation and up to plinth level in c.m. (1 : 6)<br />

including racking out joints up to 12mm depth, required scaffolding, curing etc. complete<br />

as directed.<br />

Only standard size bricks duly approved and conforming to I.S. 1077, latest edition or approved<br />

locally available size as per British system, till Govt. has allowed use of the same. In case quality<br />

of local brick is not found suitable, contractor will have to procure the approved quality of bricks<br />

from other places without any extra charge or compensation. As far as possible bricks of different<br />

size shall not be used in same work, however, in exceptional case Engineer-in-charge may permit<br />

same considering suitability.<br />

Bricks shall have uniform surface, straight edges, giving ringing sound, properly uniformly burnt. If<br />

desired crushing strength, absorption test etc. shall have to be arranged by contractor without any<br />

extra cost. Sample of brick shall be got approved before collecting bricks on site and bricks<br />

collected on site shall confirm to approved sample.<br />

Cement mortar shall be as specified in the item. Mortar used for the work shall be stiff as per I.S.<br />

2250.<br />

Before brick laying is started, brick shall be wetted to saturation point, by immersion or watering.<br />

Brickwork shall be carried out in approved bond, generally English Bond.<br />

Brickwork shall be carried out in line and level. Each brick laid on mortar bedding shall be pressed<br />

properly so that it spreads all-round. Joints between bricks shall be not more than 10mm and not<br />

less than 5mm. Joints shall be properly filled with trowel edge. Brickbats or half brick shall not be<br />

used, except at corner or where absolutely necessary and permitted.<br />

Each layer of brick shall be in line and plumb. Checking shall be done for verticality of the work.<br />

Vertical joint shall be perfectly vertical and horizontal joints shall be perfectly horizontal. Brick<br />

works shall be raised in uniform height and no height shall be more than 1.2 meter than other.<br />

When joint is to be left for further work, it shall be step joint. Work shall be carried out as per I.S.<br />

Code for brick laying.<br />

Mortar that can be utilized within initial setting time of the cement, shall be mixed with water.<br />

Mortar shall be prepared on pucca platform or on steel plates platform. Mortar shall be uniformly<br />

mixed dry and then required quantity of water shall be added. If work demands, mixing of mortar<br />

in machine, same shall have to be arranged without any extra cost.<br />

All joints vertical and horizontal shall be properly racked out to a depth of 12 mm when mortar is<br />

green and soft. The exposed faces of walls are to be provided with flush joint. Brickwork shall be<br />

cured with water for a period of 10 days, keeping constantly moist. During rainy season green<br />

work shall have to be protected from rain, by covering it with suitable covering.<br />

Work shall be measured in volume. Any opening more than 0.5 sq.m. area shall be deducted. <strong>No</strong><br />

payment shall be made for keeping in masonry, any pipe, sleeves, etc. supplied by department.<br />

Thickness of brick shall be paid as per standard practice half brick, full brick, 1 ½ bricks etc. as<br />

shown on drawings.<br />

Item <strong>No</strong>. 18 Providing B. B. Masonry in C.M. (1:6) for super structure, including racking out<br />

joints 12 mm depth, scaffolding curing etc. complete as directed.<br />

Specifications of items <strong>No</strong>.1 shall be applicable. Racking out of joints shall be done when<br />

masonry is green and mortar is wet.<br />

Scaffolding for working, shall be fixed properly. Proper size of bullies, bamboos shall be used for<br />

wooden scaffolding. They shall be properly supported in wall, on ground and tied with string.<br />

Scaffolding shall be with arrangement to take load of materials and men working I.S. 3696 shall<br />

be followed for safety of scaffolds and ladders. Contractor shall make arrangement for proper<br />

approach with ladders etc. for inspection of work.<br />

In case of structure with G.F. only, rate shall be applicable for parapet on terrace.<br />