22.0 <strong>Tender</strong> shall remain open for acceptance for a period of 180 days from the date of Technical<br />
bid opening & during this period no bidder shall be allowed to withdraw his tender. Any such<br />
withdrawals, during the said period will entail forfeiture of the earnest money deposited with the<br />
tender.<br />
23.0 Further information required, if any, can be had from the office of the Executive Engineer<br />
(TR), , GETCO, Transmission Division Office, VARTEJ. But it must be clearly understood that<br />
the tenders must be received complete VARTEJ. in every respects by the due date & time.<br />
24.0 The notice inviting tender, general instructions to the contractors & all documents of this<br />
tender shall form part of the contract.<br />
25.0 The tender shall be accompanied by the following information attached in the form of<br />
proformas attached:<br />
i. Details of the works of similar type & magnitude carried out by the tenderer.<br />
ii. Details of the other works tendered for & in hand on date of submission of this tender.<br />
iii. Details of technical personal of the tenderer who will be made available for this work.<br />
iv. Details of equipment machineries, plant & tools, tackles immediately available with the tenderer<br />
for use of this work.<br />
v. Proforma showing the details of site visit by agency before quoting the tender.<br />
vi. Bar Chart indicating how the tenderer intends to complete the work in the stipulated time limit.<br />
26.0 The electric power, at site, will be made available at one mutually agreed points, free of cost<br />
(connection only) by GETCO. Further distribution will have to be carried out by the contractor as<br />
per requirements at their own cost. The necessary consumption charges will be recovered as per<br />
the tariff rate of GETCO from time to time as per GETCO’s rules.<br />
27.0 The contractor will have to make their own arrangement of water required for construction<br />
activity. However if GETCO supply water then in that case it shall be given at one point on<br />
chargeable basis as per GETCO’s rules. The recovery towards consumption of water, if<br />
construction water is supplied by GETCO, shall be affected at the rates prevailing, during that<br />
period of consumption, in the GETCO.<br />
28.0 Work under this contract shall be completed in all respects within 2 (Two) calendar months<br />
from the date of Letter Of Intent [LOI]. However, interim mile stones to be jointly fixed after issue<br />
of LOI.<br />
29.0 Bidders must quote firm price only, till completion of work under contract, & this is to be<br />
confirmed by bidder while submitting his offer.<br />
30.0 <strong>No</strong> escalation towards labour and material / fuel shall be paid in this execution of contract.<br />
Price quoted shall be firm. Contractor shall pay minimum wages to his labourers as per the<br />
Minimum Wages Act, 1948 & rules there under as applicable from time to time in pursuant to the<br />
State Government notification. The concerned contractor shall submit the details of the payment<br />
with due certificate of LWO/IRO of the GETCO<br />
31.0 Each tenderer shall also submit a Declaration to the effect that tenderer is an engineering<br />
construction firm or an association of firm which has successfully carried out large works of this<br />
nature & has adequate organization & experienced personnel to handle this type & magnitude of<br />
work. Information should be also given regarding the constitution of the firm; it’s authorized,<br />
subscribed & paid up capital, the date & place of registration, the place of business, the names of<br />
the directors & other relevant information.<br />
32.0 In the case of non-Indian firms the declaration should also include an undertaking to the firm<br />
registered, within three months of the date of notice of the acceptance of the tender.<br />
33.0 Failure to so, as required in above clauses, in registering the firm after due notice, the tender<br />
acceptance is liable to result in the annulment of the tender with forfeiture of the earnest money<br />
deposit & other penalties that may be leviable under the conditions specified in tender & contract<br />
documents.<br />
34.0 Each tender shall contain the name, residence & place of business of person or persons<br />
making the tender & shall be signed by the tenderer with his usual signature with seal of the<br />
company.<br />
35.0 <strong>Tender</strong> by partnerships shall furnish the full names of all partners. It shall be signed with the<br />
partnership name by one of the members of the partnership or by an authorized representative<br />
followed by the name &designation of the person signing.<br />
36.0 An attested copy of the constitution of the firm with the name of partners shall be furnished.<br />
Whenever, whether in submission of the tender or later in other matters, the signatures are made<br />
by one person on behalf of Directors or a firm or a corporation, an attested copy of the resolution<br />