DETAILED SPECIATIFICONS<br />

Item <strong>No</strong>.1:-Dismenalling the C.C. or R.C.C. work for foundation and building work and<br />

throwing/stacking the dismenalled stuff as directed, within the lead of 500 Mtr. Radioed,<br />

dressing etc. complete as directed by E.I.C.<br />

Area of plain cement and R.C.C. work to be dismentalled, shall be separated by providing<br />

necessary barricaded, and providing watchman to avoid any accident in the area. All<br />

precaution shall be taken to see that, the structure, machinery, equipment in the area not<br />

damaged. If desired by authority, all equipments, machinery, etc shall be covered with<br />

tarpolin or plastic covering without any extra cost.<br />

Rate quoted for the item shall be inclusive of providing all labour, tools, tackles, and<br />

scaffolding, wherever required. Payment shall be made for actual cu. Meter of concrete<br />

dismenalled as per drawing of as directed or details furnished at site. (Area shall be cleaned<br />

everyday, when work is to be stopped or even work is in progress during day, if required, in<br />

case of plant area or other places).<br />

Item <strong>No</strong>. 2:-Dismentaling the B.B./Bella/U.C.R. masonry work in C.M. or L.M. including<br />

scaffolding and throwing away the dismantled stuff within the lead of 500 Mtr. Radious &<br />

stacking of the useable materials at the places, etc. complete as directed by E.I.C.<br />

Area to be dismentalled shall be marked with paint and got approved before starting<br />

the work. Specification of item <strong>No</strong>.1 shall be applicable to this item also. Wherever opening is<br />

to be made in masonry work, sides of the opening made, shall be finished with cement<br />

mortar 1:3 to line and level as instructed. Rate quoted is inclusive of this. Cement shall be<br />

used as per the terms detailed in schedule.<br />

Item <strong>No</strong>.3:-Dismentalling the barbed wire fencing pinned with R.C.C./P.S.C./Angle or wooden<br />

posts from all rows& diagonals & bundling & stacking the barbed wires as directed by E.I.C.<br />

etc. complete.9PAYMENT WILL BE MADE IN RMT. OF COMPLETE FENCING WORK<br />

IRRESPECTIVE OF NO OF ROWS.) (For 6<strong>No</strong>s Horizantal & 2 <strong>No</strong>s. of rows)<br />

Care shall be taken to see that, the labour engaged on job are not injured during<br />

removal of fencing. The barbed wire row shall be immediately bundled after removing.<br />

The payment shall be made in running meter of complete fencing work irrespective of<br />

<strong>No</strong>s. of rows i.e. on actual running meter fencing. Rate quoted shall be inclusive of crediting<br />

the removed barbed wire to the deptl . Store.<br />

Item <strong>No</strong>.4:- ---DO----as above but for 3 NOs. Horizantal & 2 <strong>No</strong>s of diagonal rows.<br />

Same specifications shall be applicable as per of Item <strong>No</strong>. 3.<br />

Item <strong>No</strong>. 5:-Labor charges for removing the chinlink fencing panel with nuts & bolts from<br />

Angle supports, including stacking the same as directed by E.I.C.<br />

Specifications of Item <strong>No</strong>. 3 & 4 shall be applicable.<br />

Pannels and nut bolts removed shall be credited to the Dptl. Store.<br />

Payment shall be made for <strong>No</strong>s. of panels removed and credited to store.<br />

Item <strong>No</strong>.6:-Removing the existing post P.S.C. or Angle iron from concrete without damging<br />

the post & stacking etc. complete as directed by E.I.C.<br />