Port Information Guide
Port Information Guide
Port Information Guide
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PART III | 7. PORT DESCRIPTION<br />
PORT OF PRIMORSK<br />
7.5 MAXIMUM SIZE VESSELS<br />
LOA 307m, 150.000 DWT, beam 55m, draught 15.85m.<br />
7.6 TIME ZONE<br />
GMT + 3 hr.<br />
Night of last Saturday to Sunday in March and in October change to Daylight Saving<br />
Time (GMT + 4 hrs).<br />
7.7 WORKING HOURS<br />
24 hrs/day.<br />
7.8 TRAFFIC<br />
24 hrs/day.<br />
7.9 CARGO<br />
Crude oil and diesel oil.<br />
7.10 CHARTS AND BOOKS<br />
Russian chart 27056.<br />
7.11 SHIPPING ANNOUNCEMENTS FOR THE PORT<br />
AREA<br />
“Primorsk Traffic”, Ch.68<br />
7.12 PILOT STATIONS<br />
“Primorsk Pilot” , ch.68<br />
7.13 PORT INFRASTRUCTURE<br />
All cargo is loaded through the pipe lines.<br />
7.14 PORT ACCOMMODATION AND BERTHS<br />
Terminal of crude oil.<br />
Berth Length Depth Max. Length Max. Draft Remarks<br />
(No.) (m.) (m.) (m.) (m.)<br />
1. 376.0 17.8 307.0 15.85 Crude oil<br />
2. 376.0 17.8 307.0 15.85 Crude oil<br />
3. 385.0 17.8 307.0 15.85 Crude oil<br />
4. 385.0 17.7 307.0 15.85 Crude oil<br />
5. 90, 0 8.0 Auxiliary vessels<br />
6. 104, 7 7, 5 Auxiliary vessels<br />
7. 63, 5 4.7 Auxiliary vessels<br />
25