07.01.2014 Views

Community Needs Assessment - Hawkesbury City Council

Community Needs Assessment - Hawkesbury City Council

Community Needs Assessment - Hawkesbury City Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FIGURE 1 – SITE LOCATION<br />

The proposed development site is identified as Lot 27 on the above figure. The area identified as „Part of<br />

Lot 27‟ is a 27 ha area approved for seniors living development by the Department of Planning and<br />

Infrastructure in 2008.<br />

North Richmond is well serviced by the regional road network and is approximately four kilometres from<br />

Richmond Station, the terminus of Sydney‟s northwest rail line. Major retail facilities are available at<br />

Richmond and regional shopping is available at Penrith and Rouse Hill, approximately a 20 minute drive<br />

away.<br />

1.3 PROPOSED DEVELOPMENT<br />

A Land Release Application to the Department of Planning was prepared by Urbis Urban Planning in<br />

2009. The proposal identified the suitability of the site for residential development of 1,400 dwellings<br />

across 147ha, over the next 10 years.<br />

The NRJV have prepared a concept plan which includes the proposed development of:<br />

• Approximately 1,400 homes in addition to the Seniors Living Facility currently under construction<br />

• Local <strong>Council</strong> roads including bus route<br />

• Small scale local centre of approximately 1.0Ha<br />

• Retention and modification of three to four existing farm dams within the project site to become open<br />

water bodies<br />

• Construction of four primarily trunk drainage corridors (with a secondary riparian and tertiary open<br />

space function) separating planned residential areas<br />

• Retention of an existing farm dam on Redbank Creek and vegetation improvement to the primarily<br />

riparian corridor along the south bank of Redbank Creek, which extends along the project site<br />

perimeter<br />

2 INTRODUCTION<br />

URBIS<br />

APPENDIX_O_COMMUNITY_NEEDS_ASSESSMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!