(CIVIL, INTERIOR, ELECTRICAL & ALLIED WORKS) - Imimg
(CIVIL, INTERIOR, ELECTRICAL & ALLIED WORKS) - Imimg
(CIVIL, INTERIOR, ELECTRICAL & ALLIED WORKS) - Imimg
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
0.0 Scope of Work<br />
12<br />
INSTRUCTION TO THE TENDERERS<br />
Sealed tenders are invited by the Chief Manager (PSS), UNION Bank Of India,<br />
Sayajigunj, VADODRA for and on behalf of union Bank of India for the work of<br />
<strong>INTERIOR</strong> & FURNISHING WORK AT UBI, DEVA BRANCH,DEVA FOR <strong>CIVIL</strong><br />
, <strong>INTERIOR</strong>,<strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong>.<br />
0.1 Site and its location:<br />
The proposed work is to be carried out at Deva branch,Deva near Nadiad.<br />
1.0 Tender Documents<br />
1.1 The work has to be carried out strictly according to the condition stipulated in the<br />
tender consisting the following documents and the most workmen like manner.<br />
Instructions to tenderers<br />
General Conditions of Contract<br />
Special Condition of Contract<br />
Additional Specifications<br />
Drawings<br />
Price Bid Etc.<br />
1.2 The above documents shall be taken as complementary and mutually<br />
explanatory of one another but in case of ambiguities or discrepancies, shall take<br />
precedence in the order given below :<br />
(a) Price bid<br />
(b) Additional Specifications & Conditions and NIT<br />
(c) Technical Specifications<br />
(d) Drawings<br />
(e) Special Condition of Contract<br />
(f) General Condition of Contract<br />
(g) Instructions to Tenders<br />
1.3 Complete set of tender documents including relative drawings can be obtained in<br />
person from the office of the Architects on any day during office hours except<br />
holidays during the period mentioned in the NIT on payment of Rs. by<br />
means of cash/ Cheque/ DD/ drawn in favor of the architects<br />
1.4 The tender documents are not transferable.<br />
2.0 Site Visit<br />
2.1 The tenderer must obtain himself on his own responsibility and his own expenses<br />
all information and data which may be required for the purpose of filling this<br />
tender document and enter into a contract for the satisfactory performance of the<br />
work. The tenderer is requested to satisfy himself regarding the availability of<br />
water, power, transport and communication facilities, the character quality and<br />
Tender Document UBI Deva branch