44<br />

HARDWARES, CLAMPS ETC. SHALL BE REMOVED TO MAKE SURFACE CLEAN. MINIMUM<br />

TWO OR MORE COATS OF THE LAPI / PUTTI SHALL BE APPLIED TO GET EVEN SURFACE<br />

IN ENTIRE LINE & LEVEL. FINALLY 2 OR MORE COATS OF DISTEMBER PAINT SHALL BE<br />

APPLIED OF SUGGESTED SHADE TO BE APPLIED WITH ROLLER FINISH AND FINISH TO<br />

GET THE EVEN AND SATISFACTORY RESULT, THROUGHOUT THE WORK. THE AREA FOR<br />

THE LIGHT FIXTURES, A.C. DIFFUSERS, COLUMNS ETC. WILL NOT BE CONSIDERED FOR<br />

THE MEASUREMENT PURPOSE. ALL THE UNWANTED ELEMENTS SHALL BE REMOVED<br />

FROM THE CEILING, WALL ETC. ONLY ONSITE EXECUTED AREA WILL BE CONSIDERED<br />

FOR TE MEASUREMENT PURPOSE<br />

5.0 P & A SATIN FINISH ENAMEL PAINT<br />

P & A TWO & MORE COATS OF ENAMEL PAINT (SATIN FINISH) ON<br />

EXISTING WINDOWS / GRILLS ETC. BY BRUSH, AT ALL LEVELS WITH FULL LAPI<br />

COAT (THE RATE SHALL INCLUDE FOR ALL LADDERS SCAFFOLDINGS AND<br />

SUPPORTS) FOLLOWING THE MANUFACTURERS SPECIFICATION. THE OLD<br />

PAINT HAS TO BE REMOVED / SCRAPED PROPERLY. THE SURFACE SHALL BE<br />

THROUGHLY CLEANED, DRIED AND MADE FREE OF ALL LOOSE DIRT, CHALK,<br />

GREASE, FUNGUS AND ALAGE, WAX OR FLANKING PAINT. THE<br />

COMPLETESURFACE PREPARATION SHALL BE DONE BY FILLING THE<br />

SMALLER / LARGER CRACKS, BY PUTTI PROPERLY. FOR STEEL ELEMENTS,<br />

THE REQUIRED COATS OF RED OXIDE SHALL BE APPLIED FOR PUTTING THE<br />

PAINT. AND FINALLY 2 OR MORE COATS OF ENAMEL PAINT SHALL BE APPLIED<br />

OF SUGGESTED SHADE AND FINISH TO GET THE EVEN AND SATISFACTORY<br />

RESULT, THROUGHOUT THE WORK. FOR EACH ITEM THE MODE OF<br />

MEASUREMENT WILL CONSIDERED SEPRATELY. ONLY ONSITE EXECUTED<br />

AREA WILL BE CONSIDERED FOR MEASUREMENT PURPOSE.<br />

5.0 Vitrified Flooring<br />

PROVIDING & LAYING 1 ST QUALITY, PLAIN COLORED GRANAMITE TILES IN<br />

FLOORING OF SIZE 2’ X 2’, IN SHADE AS MENTIONED. IT SHOULD BE PROVIDED IN<br />

FLOOR IN COMPLETE LINE & LEVEL (NO GRADIENT) BY PROVIDING SUFFECIENT<br />

THICKNESS (AS PER THE REQUIRMENT OF THE SITE) 30TO 45 MM C.M. 1:6 AS<br />

BEDDING MATERIAL OR BY PUTTING TILE FIXING CHEMICALS OF MINIMUM 6 MM<br />

THICKNESS ON THE EXISTING FLOOR AS PER THE SITE CONDITION & BANK’S<br />

DECISION. THE JOB INCLUDES JOINT FINISHING WITH THE HELP OF WHITE<br />

CEMENT, CEMENT COLOR, WITH JOINT FILLER OF APPROVED MAKE, CLEANING<br />

ETC. COMPLETE. THE SHADE, DESIGN, THICKNESS AND SIZE OF THE TILES<br />

SHOULD BE UNIFORM. THE TILES ARE TO BE FIXED IN SUGGESTED PATTERN,<br />

JOINED WITH SUGGESTED COLOR CEMENT SLURRY IN JOINTS. PROPER FIXING<br />

LEVEL SHOULD BE MAINTAINED. FULL PIECES HAVE TO BE FIXED EXCEPT WHERE<br />

SMALL PIECES ARE NECESSARY. SMALL PIECES ARE TO BE AVOIDED AS FAR AS<br />

POSSIBLE. THE JOB INCLUDES FIXING WHITE TAP ON JOINTS OF THE TILES,<br />

LAYING 3 MM THICK FLOOR BUBBLE GUARD AFTER LAYING THE TILES AND<br />

REMOVING THE SAME AFTER COMPLETION OF THE ENTIRE WORK INCLUDING ALL<br />

OTHER AGENCIE’S WORK. ACTUAL ON SITE LAID QUANTITY WILL BE CONSIDERED<br />

FOR THE MEASUREMENT PURPOSE. 10 % COLOURED TILES FOR DESIGN SHALL<br />

BE CONSIDERED IN THE TOTAL QUANTITY.<br />