44<br />
HARDWARES, CLAMPS ETC. SHALL BE REMOVED TO MAKE SURFACE CLEAN. MINIMUM<br />
TWO OR MORE COATS OF THE LAPI / PUTTI SHALL BE APPLIED TO GET EVEN SURFACE<br />
IN ENTIRE LINE & LEVEL. FINALLY 2 OR MORE COATS OF DISTEMBER PAINT SHALL BE<br />
APPLIED OF SUGGESTED SHADE TO BE APPLIED WITH ROLLER FINISH AND FINISH TO<br />
GET THE EVEN AND SATISFACTORY RESULT, THROUGHOUT THE WORK. THE AREA FOR<br />
THE LIGHT FIXTURES, A.C. DIFFUSERS, COLUMNS ETC. WILL NOT BE CONSIDERED FOR<br />
THE MEASUREMENT PURPOSE. ALL THE UNWANTED ELEMENTS SHALL BE REMOVED<br />
FROM THE CEILING, WALL ETC. ONLY ONSITE EXECUTED AREA WILL BE CONSIDERED<br />
FOR TE MEASUREMENT PURPOSE<br />
5.0 P & A SATIN FINISH ENAMEL PAINT<br />
P & A TWO & MORE COATS OF ENAMEL PAINT (SATIN FINISH) ON<br />
EXISTING WINDOWS / GRILLS ETC. BY BRUSH, AT ALL LEVELS WITH FULL LAPI<br />
COAT (THE RATE SHALL INCLUDE FOR ALL LADDERS SCAFFOLDINGS AND<br />
SUPPORTS) FOLLOWING THE MANUFACTURERS SPECIFICATION. THE OLD<br />
PAINT HAS TO BE REMOVED / SCRAPED PROPERLY. THE SURFACE SHALL BE<br />
THROUGHLY CLEANED, DRIED AND MADE FREE OF ALL LOOSE DIRT, CHALK,<br />
GREASE, FUNGUS AND ALAGE, WAX OR FLANKING PAINT. THE<br />
COMPLETESURFACE PREPARATION SHALL BE DONE BY FILLING THE<br />
SMALLER / LARGER CRACKS, BY PUTTI PROPERLY. FOR STEEL ELEMENTS,<br />
THE REQUIRED COATS OF RED OXIDE SHALL BE APPLIED FOR PUTTING THE<br />
PAINT. AND FINALLY 2 OR MORE COATS OF ENAMEL PAINT SHALL BE APPLIED<br />
OF SUGGESTED SHADE AND FINISH TO GET THE EVEN AND SATISFACTORY<br />
RESULT, THROUGHOUT THE WORK. FOR EACH ITEM THE MODE OF<br />
MEASUREMENT WILL CONSIDERED SEPRATELY. ONLY ONSITE EXECUTED<br />
AREA WILL BE CONSIDERED FOR MEASUREMENT PURPOSE.<br />
5.0 Vitrified Flooring<br />
PROVIDING & LAYING 1 ST QUALITY, PLAIN COLORED GRANAMITE TILES IN<br />
FLOORING OF SIZE 2’ X 2’, IN SHADE AS MENTIONED. IT SHOULD BE PROVIDED IN<br />
FLOOR IN COMPLETE LINE & LEVEL (NO GRADIENT) BY PROVIDING SUFFECIENT<br />
THICKNESS (AS PER THE REQUIRMENT OF THE SITE) 30TO 45 MM C.M. 1:6 AS<br />
BEDDING MATERIAL OR BY PUTTING TILE FIXING CHEMICALS OF MINIMUM 6 MM<br />
THICKNESS ON THE EXISTING FLOOR AS PER THE SITE CONDITION & BANK’S<br />
DECISION. THE JOB INCLUDES JOINT FINISHING WITH THE HELP OF WHITE<br />
CEMENT, CEMENT COLOR, WITH JOINT FILLER OF APPROVED MAKE, CLEANING<br />
ETC. COMPLETE. THE SHADE, DESIGN, THICKNESS AND SIZE OF THE TILES<br />
SHOULD BE UNIFORM. THE TILES ARE TO BE FIXED IN SUGGESTED PATTERN,<br />
JOINED WITH SUGGESTED COLOR CEMENT SLURRY IN JOINTS. PROPER FIXING<br />
LEVEL SHOULD BE MAINTAINED. FULL PIECES HAVE TO BE FIXED EXCEPT WHERE<br />
SMALL PIECES ARE NECESSARY. SMALL PIECES ARE TO BE AVOIDED AS FAR AS<br />
POSSIBLE. THE JOB INCLUDES FIXING WHITE TAP ON JOINTS OF THE TILES,<br />
LAYING 3 MM THICK FLOOR BUBBLE GUARD AFTER LAYING THE TILES AND<br />
REMOVING THE SAME AFTER COMPLETION OF THE ENTIRE WORK INCLUDING ALL<br />
OTHER AGENCIE’S WORK. ACTUAL ON SITE LAID QUANTITY WILL BE CONSIDERED<br />
FOR THE MEASUREMENT PURPOSE. 10 % COLOURED TILES FOR DESIGN SHALL<br />
BE CONSIDERED IN THE TOTAL QUANTITY.<br />
Tender Document UBI Deva branch