1<br />
TENDER DOCUMENTS<br />
FOR<br />
<strong>INTERIOR</strong> AND FURNISHING WORK<br />
AT<br />
UBI, DEVA BRANCH,DEVA.<br />
FOR<br />
(<strong>CIVIL</strong>, <strong>INTERIOR</strong>, <strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong>)<br />
TENDER ISSUED TO : M/s _____________________________<br />
_____________________________<br />
_____________________________<br />
_____________________________<br />
TENDER COST : Rs. 500.00<br />
ARCHITECTS :<br />
6, PARSHWANATH SOC., B/H AKOTA ATITHI GRUH.,<br />
BESIDES KAILASHPARK SOC, AKOTA, VADODARA-20<br />
TELEPHONE NOS : 9 9 2 5 2 4 5 9 6 5 (o) M: 9 8 2 5 3 2 3 6 1 2<br />
M: 9 9 2 5 2 4 5 9 6 6<br />
E-MAIL : ar_minesh@yahoo.co.in<br />
arminesh70@gmail.com<br />
Tender Document UBI Deva branch
2<br />
INDEX<br />
Tender documents is in One part (Volume) i.e. Part – A<br />
Sr. No. Description Page No.<br />
1 Cover page 1<br />
2. Index 2<br />
3. Notice Inviting Tender 3<br />
4. Form of Tender 4<br />
5. Articles of Agreement 7<br />
6. Instructions to the Tenderers 12<br />
7. General Conditions of Contract 15<br />
8. Special conditions of contract 36<br />
9 Technical specification civil work 43<br />
10 Technical specification Furniture work 45<br />
11 Technical specification Electrical work 50<br />
12 Additional specification & Conditions 63<br />
13 List of approved make civil work 65<br />
14 List of approved make Furniture work 67<br />
15 List of approved make Electrical work 69<br />
16 Important points for electrical work execution 71<br />
17 Schedule of Quantities 72<br />
18 Drawings 84<br />
Tender Document UBI Deva branch
3<br />
NOTICE INVITING TENDERS<br />
Union Bank of india , regional office , vadodara invites item rates sealed tenders from the<br />
bank empanelled contractors for vadodara Region for the work mentioned below .<br />
1 Name of Work Supplying & Installation of civil , interior and allied<br />
works<br />
2 Time allowed for completion 30 DAYS ( thirty days)<br />
3 Earnest Money Deposit Rs. 4000.00( Rupees Four thousand only )<br />
4 Security Deposit / Retention<br />
Money<br />
5 Cost of tender documents:<br />
5% of contract value<br />
Rs. 500.00 (Rupees Five hundred only)<br />
6 Last date & time of receipt of<br />
tenders<br />
11. 08 .2010 up to 2.00 p.m.<br />
7 Address at which the tenders Cabin of the Chief Manager (PSS), 2<br />
are to be submitted<br />
ND floor,<br />
Regional office Opp Faculty OF Commerce,<br />
Sayajigunj, Vadodara.-390 005<br />
8 Date and time of opening<br />
tenders<br />
11. 08 .2010 up to 5.00 p.m.<br />
9 Place of Opening tender Cabin of the Chief Manager(PSS), 2 ND floor,<br />
Regional office , Opp Faculty OF Commerce,<br />
Sayajigunj,Vadodara.-390 005<br />
10 Defects liability period 12 months (Twelve Months)<br />
11 Validity of offer 2 months from the date of opening of price bid<br />
12 Liquidated Damages:<br />
0.5% per week subject to maximum of 5% of<br />
contract value<br />
Note: Tender documents can be purchased from the office of the Architects :<br />
ARCHITECTS KRISHNA SHAH, MINESH SHAH, 6, PARSHWANATH SOCIETY,<br />
BESIDES KAILASHPARK SOC. , AKOTA, VADODARA-20 Ph. + 91 99252 45966<br />
From 28/07/2010 to 10/08/2010 at 11.00 Hrs to 6.00 Hrs in working days,<br />
In case the date of opening of tenders is declared as a holiday, the tenders will be opened<br />
on the next working day at the same time.<br />
UBI has the right to accept/ reject any/ all tenders without assigning any reasons.<br />
Chief Manager (PSS),<br />
2 ND FLOOR,Regional office,<br />
Opp Faculty OF Commerce,<br />
Sayajigunj, Vadodara-390 005<br />
Tender Document UBI Deva branch
TO<br />
Chief Manager (PSS),<br />
2 ND floor,<br />
Regional office<br />
Opp Faculty OF Commerce<br />
Sayajigunj, Vadodara.-390 005<br />
Dear Sir,<br />
4<br />
FORM OF TENDER<br />
<strong>INTERIOR</strong> & FURNISHING WORK AT UBI, DEVA BRANCH, DEVA FOR <strong>CIVIL</strong>,<br />
<strong>INTERIOR</strong>, <strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong>.<br />
1. I/ We refer to the Notice Inviting Tender issued by you for the captioned work.<br />
2. I/ We do hereby offer to perform, provide, execute, complete and maintain the works<br />
in conformity with Bill of Quantities, Drawings, Specification, Design, General and<br />
Special conditions of Contract, Instruction to tenderers, etc. as contained in the<br />
tender documents for the sum as arrived and filled, at the respective rates quoted by<br />
me/us in the Schedule of Quantities and/or at any other sum and rate subsequently<br />
negotiated and accepted / agreed by the Bank and me/us.<br />
3. I/We have satisfied my self / our self as to the site conditions, examined site and<br />
drawings, and all aspects of tender documents / conditions and are acceptable to us.<br />
I/We do hereby agree, should this tender be accepted in whole or in part, to ,<br />
(A) Abide by and full-fill the terms, conditions and provisions of tender documents<br />
annexed hereto.<br />
(B) Complete the work within stipulated completion time at no extra cost to the Bank.<br />
4. I/We are enclosing herewith the Earnest Money Amount (As Mentioned in NIT) in<br />
the form of Bank Draft / Pay order / Banks cheques no. ____________ dt<br />
______________ drawn by ___________________ in favour of union Bank of<br />
India payable at Vadodara.<br />
5. I/We are submitting herewith duly filled up and signed tenders as per the following<br />
details.<br />
Tender Document UBI Deva branch
“COVER – A”<br />
Sealed cover marked as “Technical Bid: Cover – A” on the top of the cover and<br />
containing.<br />
5<br />
(i) EMD<br />
(ii) Complete set of “PART-A” of tender documents (Rates in “Schedule of<br />
Quantities” are to be left blank i.e not to be filled )<br />
(iii) My/our specific terms / clarifications / conditions / consideration (if any) on my /<br />
our letter head.<br />
“COVER – B :<br />
Sealed cover marked as “Price Bid: Cover-B” on the top of the cover and containing.<br />
(i) Complete set of “PART-B” (Schedule of Quantities) of tender documents duly<br />
filled & signed.<br />
Both the Cover – A and Cover – B are kept in a third cover and are duly sealed. All the<br />
three covers are marked as “Tender <strong>INTERIOR</strong> & FURNISHING WORK AT UBI, DEVA<br />
BRANCH FOR <strong>CIVIL</strong> , <strong>INTERIOR</strong>,<strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong>.” and are addressed<br />
to “Chief Manager (PSS), UNION Bank Of India, Sayajigunj, VADODARA” and are<br />
having seal & address of our firm /company at bottom left corner of the envelopes.<br />
I/We confirm that I/We are duly authorized to participate in the tendering /bidding and<br />
understand that my / our tender is liable to be rejected if,<br />
(i) at any times it comes to the notice of the Banks that I/We have concealed or /<br />
and have given any wrong information.<br />
(ii) the tender is not duly filed and /or signed and / or is incomplete and/or covers are<br />
not properly sealed.<br />
(iii) the price bid contains any condition / alteration / modification and/or any<br />
tempering with the tender documents is done at our end.<br />
(iv) tender received by the Bank after due date and time<br />
All the pages of the tender documents are affixed with the seal/stamp of my/our company<br />
and initialed / signed by the undersigned.<br />
Tender Document UBI Deva branch
Signature of Tenderer/s Seal /stamp of the firm/company<br />
(Duly authorized for tendering)<br />
PLACE:<br />
DATE:<br />
Name:<br />
Designation:<br />
Signature & Address & witness a) Signature __________________<br />
Name ____________________<br />
Place:<br />
Address ___________________<br />
Date: __________________________<br />
Place: b) Signature __________________<br />
Name ____________________<br />
Date: Address ___________________<br />
__________________________<br />
6<br />
Tender Document UBI Deva branch
7<br />
(On Non -Judicial Stamp paper of appropriate value)<br />
ARTICLES OF AGREEMENT<br />
Articles of Agreement made this_______________________________ day<br />
of_______________________________________________________________<br />
between Union Bank Of India, Govt. of India, Public undertaking and having its<br />
Regional Office at Sayajigunj, Vadodara,.hereinafter called the Bank which expressions<br />
shall include its successors and assigns of the one part and __________________(name &<br />
address of contractor)_____________ hereinafter called the “Contractor” which expression<br />
shall include the successors and assigns of the other part.<br />
WHEREAS the Bank is desirous of executing the work of <strong>INTERIOR</strong> &<br />
FURNISHING WORK AT UBI, DEVA BRANCH FOR <strong>CIVIL</strong> , <strong>INTERIOR</strong> ,<strong>ELECTRICAL</strong>&<br />
<strong>ALLIED</strong> <strong>WORKS</strong> and has caused drawings, specifications, and schedule of quantities<br />
etc. describing the works to be prepared by ARCHITECTS KRISHNA SHAH, MINESH<br />
SHAH, 6, PARSHWANATH SOCIETY, BESIDES KAILASHPARK SOC. , AKOTA,<br />
VADODARA-20<br />
AND WHEREAS for the said construction of on local Regional Office Building for UNION<br />
Bank of India at Vadodara ,Terms & Conditions, Specifications and the Schedule of items<br />
quantities etc ,have been signed by and on behalf of the parties hereto.<br />
AND WHEREAS the Contractor has agreed to execute upon, subject to the conditions set<br />
forth herein and Schedule of Items and quantities, General & Special Conditions of<br />
Contract, specifications etc contained in the tendered documents including all<br />
correspondences exchanged by or between the parties from the submission of tender till<br />
the award of work, both letters inclusive, (all of which are collectively hereinafter referred to<br />
as “the said conditions” , details of which are described in the schedule attached hereto, the<br />
works shown upon the said drawings and/or described in the said specification and<br />
included in the schedule of items and quantities at the respective rates therein set forth<br />
amounting to the sum as therein arrived at or such other sum shall become payable there<br />
under arrived at or such other sum as shall become payable there under (hereinafter<br />
referred to as “the said contract amount”)<br />
NOW IT IS HEREBY AGREED AS FOLLOWS:<br />
1. In consideration of the said contract amount to be paid at the time and in the manner set<br />
forth in the said conditions, the contractor shall upon and subject to the said conditions<br />
execute and complete the work shown in the said drawings and described in the said<br />
specifications and the schedule of items and quantities, as per the terms and conditions<br />
contained in the said conditions.<br />
2. The Bank shall pay the Contractor the said contract amount, or such other sum as shall<br />
become payable, at the time and in the manner specified in the said conditions.<br />
3. The Architects in the said condition shall mean the said ARCHITECTS KRISHNA<br />
SHAH , MINESH SHAH, 6, PARSHWANATH SOC, BESIDES KAILASH PARK<br />
SOC, AKOTA , VADODAR – 20 In the event of their ceasing to be the Architects for<br />
the purpose of this contract for whatever reason, such other person or persons as shall<br />
be nominated for that purpose by the Bank, provided always that no person<br />
Tender Document UBI Deva branch
8<br />
subsequently appointed as Architects under this contract shall be entitled to disregard<br />
or over rule any previous decisions or approvals or directions given or expressed in<br />
writing by the Architects for the time being.<br />
4. The said general condition, Special condition, technical drawings, Notice Inviting<br />
Tender, specifications, Guarantee, Instruction to Tenderers Price Bid (Schedule of<br />
Quantities), Correspondences, Letter of Acceptance, Agreements and Appendices there<br />
to, contained in the tendered documents/said conditions shall be read and considered<br />
as forming part of this Agreement, and the parties hereto shall respectively abide by,<br />
submit themselves to the said conditions and perform the agreements on their part<br />
respectively in the said conditions contained therein.<br />
5. The plans, agreements and documents mentioned herein shall form the basis of this<br />
contract. This contract is neither a fixed Lump Sum contract but is a contract to carry out<br />
the work in respect of the <strong>INTERIOR</strong> & FURNISHING WORK AT UBI, DEVA BRANCH<br />
FOR <strong>CIVIL</strong> , <strong>INTERIOR</strong>,<strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong> as per the scope described<br />
and to be paid for according to actual measured quantities at the rates contained in the<br />
Schedule of Rates and /or negotiated rates and Probable quantities or as provided in<br />
the said conditions.<br />
6. The Bank reserves to itself the rights of altering the specifications and nature of the<br />
work by adding to or omitting any items of work or having portions of the same carried<br />
out without prejudice to this contract.<br />
7. (a) The Contractors represent that they have experience and competent staff which will<br />
enable them to ensure proper quality check on the materials, whether brought by<br />
the contractors or supplied by the Bank to the contractors, and which will ensure<br />
that the contractor will carry out proper tests as required by the specifications and<br />
will supervise the day to day working and execution of the contract work.<br />
(b) If the contractors have any doubt about the quality of the materials or any difficulty<br />
in supervision of the day to day work it shall be duty of the contractors to report the<br />
matter in writing forthwith to the Bank and for the time being suspend that portion of<br />
the work about which difficulty is experienced, and the contractors will abide by the<br />
directions given by the Bank.<br />
(c) The contractors are aware that the Bank will not give day to day supervision but will<br />
periodically supervise and the contractor has to perform their obligations under the<br />
instructions given to him periodically and under sub clauses (a) and (b) above.<br />
(d) The contractors covenant and warrant that completed items of work as well as the<br />
entire work on completion will be in conformity with the specifications and the terms<br />
and conditions contained in the said conditions and will be of contract quality and<br />
description.<br />
8. Time shall be considered as the essence of this contract and the contractor hereby<br />
agrees to commence the work on the day on which he is instructed to take possession<br />
of the site or from the fourteenth day after the day of issue of formal Work Order as<br />
provided for in the said conditions whichever is earlier and to complete the entire work<br />
within 30 days Subject nevertheless to the provisions for the extension of time.<br />
Tender Document UBI Deva branch
9. All payments by the Bank under this contract will be made only at Vadodara.<br />
9<br />
10. Any dispute arising under this Agreement shall be referred to arbitration in accordance<br />
with the stipulation laid down in the general conditions of contract.<br />
11. The contents of this agreement have been read by the contractor and fully understood<br />
by the contractor.<br />
IN WITNESS WHEREOF the Bank and the Contractor have set their respective hands to<br />
these Presents and two duplicates hereof the day and year first herein above written (If the<br />
Contractor is a Partnership Firm or an Individual<br />
IN WITNESS WHEREOF the Bank has set its hands to these presents through its duly<br />
authorized official and the contractor has caused its common seal to be affixed hereunto<br />
and the said duplicates have /has caused these presents and the said two duplicates<br />
hereof to be executed on its behalf, the day and year first herein above written (If contractor<br />
is a Company).<br />
Signature clause:<br />
_______________________<br />
SIGNED AND DELIVERED<br />
By the hand of Shri _______________________ (Name and Designation)<br />
In presence of ________________________________________<br />
1. __________________________________________<br />
Address __________________________________________<br />
2. ___________________________________________<br />
Address _____________________________________________<br />
(Witness)<br />
Tender Document UBI Deva branch
10<br />
SIGNED AND DELIVERED by _________________________________(If the<br />
Contractor is a Partnership Firm or an individual , should be signed by all partners or<br />
by duly authorized person on behalf of all partners)<br />
(1) ______________________________<br />
Address ______________________________<br />
(2) ______________________________<br />
Address ______________________________<br />
(Witness)<br />
THE COMMON SEAL OF ____________________________was here into affixed<br />
pursuant to the resolution By Board of Directors at the Meeting held on __________<br />
( If the Contractor signs under its common seal, the Signature Clause should tally<br />
with the sealing clause in the Articles of Association)<br />
SIGNED AND DELIVERED by<br />
(1) ____________________________________<br />
(2) ____________________________________<br />
1) ______________________________<br />
Address ______________________________<br />
(2) ______________________________<br />
Address ______________________________<br />
(Witness)<br />
SIGNED AND DELIVERED by _________________________________(If the<br />
Contractor has signed by the hand of Power of Attorney , whether a Company or<br />
Individual)<br />
(1) ______________________________<br />
Address ______________________________<br />
(2) ______________________________<br />
Address ______________________________<br />
(Witness)<br />
Tender Document UBI Deva branch
11<br />
SCHEDULE<br />
(i) Letter of Acceptance/Work Order No._________dt___________<br />
(ii) Your letter Nos _____________dt.__________________<br />
(iii) Our Letter Nos.______________dt.__________________<br />
(iv) Architect’s Letter nos.__________dt._________________<br />
(v) Minutes of Meeting dt______________________________<br />
(vi) Form of Tender, Notice Inviting Tender, Instructions to Tenderers, General<br />
Conditions of Contract, Special Conditions of Contract, Additional Specifications,<br />
Technical Specifications, Bill/ Schedule of Quantities , Safety Code, List of approved<br />
makes, Guarantee Agreements, Mode of Measurements, Appendices, Drawings,<br />
Testing of Materials & there Frequency etc.<br />
(vii) ___________________________________________________<br />
(viii) ____________________________________________________<br />
Tender Document UBI Deva branch
0.0 Scope of Work<br />
12<br />
INSTRUCTION TO THE TENDERERS<br />
Sealed tenders are invited by the Chief Manager (PSS), UNION Bank Of India,<br />
Sayajigunj, VADODRA for and on behalf of union Bank of India for the work of<br />
<strong>INTERIOR</strong> & FURNISHING WORK AT UBI, DEVA BRANCH,DEVA FOR <strong>CIVIL</strong><br />
, <strong>INTERIOR</strong>,<strong>ELECTRICAL</strong> & <strong>ALLIED</strong> <strong>WORKS</strong>.<br />
0.1 Site and its location:<br />
The proposed work is to be carried out at Deva branch,Deva near Nadiad.<br />
1.0 Tender Documents<br />
1.1 The work has to be carried out strictly according to the condition stipulated in the<br />
tender consisting the following documents and the most workmen like manner.<br />
Instructions to tenderers<br />
General Conditions of Contract<br />
Special Condition of Contract<br />
Additional Specifications<br />
Drawings<br />
Price Bid Etc.<br />
1.2 The above documents shall be taken as complementary and mutually<br />
explanatory of one another but in case of ambiguities or discrepancies, shall take<br />
precedence in the order given below :<br />
(a) Price bid<br />
(b) Additional Specifications & Conditions and NIT<br />
(c) Technical Specifications<br />
(d) Drawings<br />
(e) Special Condition of Contract<br />
(f) General Condition of Contract<br />
(g) Instructions to Tenders<br />
1.3 Complete set of tender documents including relative drawings can be obtained in<br />
person from the office of the Architects on any day during office hours except<br />
holidays during the period mentioned in the NIT on payment of Rs. by<br />
means of cash/ Cheque/ DD/ drawn in favor of the architects<br />
1.4 The tender documents are not transferable.<br />
2.0 Site Visit<br />
2.1 The tenderer must obtain himself on his own responsibility and his own expenses<br />
all information and data which may be required for the purpose of filling this<br />
tender document and enter into a contract for the satisfactory performance of the<br />
work. The tenderer is requested to satisfy himself regarding the availability of<br />
water, power, transport and communication facilities, the character quality and<br />
Tender Document UBI Deva branch
13<br />
quantity of the materials, labour, the law and order situations, climatic conditions,<br />
local authorities requirement, traffic regulations etc;<br />
The tenderer will be fully responsible for considering the financial effect of any or<br />
all the factors while submitting his tender.<br />
3.0 Earnest Money<br />
3.1 The tenderer are requested to submit the Earnest Money as described herein<br />
above in NIT.<br />
3.2 EMD in any other form other than as specified above will not be accepted.<br />
Tender not accompanied by the EMD in accordance with clause 4.1 above shall<br />
be rejected.<br />
3.3 No interest will be paid on the EMD<br />
3.4 EMD of unsuccessful tenderer will be refunded with in 30 days of award of<br />
contract.<br />
3.5 EMD of successful tenderer will be retained as a part of security deposit.<br />
4.0 Initial Security Deposit<br />
4.1 The EMD of successful tenderer shall be termed as Initial Security Deposit (ISD)<br />
which shall be refunded to the contractor as soon as TSD/Retention Amount is<br />
deposited by the contractor/retained by the Bank. ISD shall not bear any interest.<br />
5.0 Total Security Deposit (TSD) / Retention Amount<br />
5.1 Total Security Deposit shall be 5% of contract value which shall be deducted<br />
from the bill/s of the contractor by way of Retention Amount. TSD shall be<br />
refunded to the contractor on satisfactory completion of Defect Liability Period.<br />
5.2 No interest shall be paid on the amount retained by the Bank as Security<br />
Deposit.<br />
6.0 Signing of contract documents<br />
The successful tenderer shall be bound to implement the contract by signing<br />
agreement and conditions of contract attached herewith within 30 days from the<br />
receipt of intimation of acceptance of his tender by the Bank. However, the<br />
written acceptance of the tender by the Bank will constitute a binding agreement<br />
between the Bank and successful tenderer whether such formal agreement is<br />
subsequently entered into or not.<br />
7.0 Completion period<br />
Time is essence of the contract. The work should be completed in all respects in<br />
accordance with the terms of contract within a period as specified in the NIT<br />
Tender Document UBI Deva branch
8.0 Validity of tender<br />
14<br />
Tenders shall remain valid and open for acceptance for a period as mentioned in<br />
the NIT (validity of Offer) from the date of opening of price bid. If the tenderer<br />
withdraws his/ her offer during the validity period or makes modifications in<br />
his/her original offer which are not acceptable to the Bank, without prejudice to<br />
any other right or remedy, the Bank shall be at liberty to forfeit the EMD.<br />
9.0 Liquidated Damages<br />
The liquidated damages shall be as mentioned in the NIT.<br />
10.0 Rate and prices:<br />
10.1 In case of item rate tender<br />
10.1.1 The tenderers shall quote their rates for individual items both in words and<br />
figures. In case of discrepancy between the rate quoted in words and figures the<br />
unit rate quoted in words will prevail. If no rate is quoted for a particular item the<br />
contractor shall not be paid for that item when it is executed.<br />
The amount of each item shall be calculated and the requisite total is given. In<br />
case of discrepancy between the unit rate and total amount calculated from<br />
multiplication of unit rate and the quantity, the unit rate quoted will govern and the<br />
amount will be corrected.<br />
10.1.2 The tenderers need not quote their rates for which no quantities have been<br />
given. In case the tenderer quote their rates for such items those will be ignored<br />
and will not be considered during execution.<br />
10.1.3 The tenderers should not change the units as specified in the tender. If any unit<br />
is changed the tenders would be evaluated as per the original unit and the<br />
contractor would be paid accordingly.<br />
The tenderers should not change or modify or delete the description of the item.<br />
If any discrepancy is observed he should immediately bring to the knowledge of<br />
the Architect/ Bank.<br />
10.1.4 Each page of the BOQ shall be signed by the authorized person and cutting or<br />
overwriting shall be duly attested by him<br />
10.1.5 Each page shall be totaled and the grand total shall be given.<br />
10.1.6 The rate quoted shall be firm and shall include all costs, allowances, taxes, levies<br />
etc.<br />
Tender Document UBI Deva branch
15<br />
GENERAL CONDITIONS CONTRACT<br />
1.0 Definitions:<br />
“Contract” means the documents forming the tender and the acceptance thereof<br />
and the formal agreement executed between union Bank of India (client) and the<br />
Contractor, together with the documents referred therein including these<br />
conditions, the specifications, designs, drawings and instructions issued from<br />
time to time by the Architects/ Bank and all these documents taken together shall<br />
be deemed to form one contract and shall be complementary to one another.<br />
1.1 In the contract the following expressions shall, unless the context otherwise<br />
requires, have the meaning hereby respectively assigned to them.<br />
1.1.1 ‘UBI’ shall mean UNION Bank of India (client) having its Corporate Centre at<br />
UNION Bank of INDIA, 239 Vidhan Bhavan Marg, Central office, Nariman point,<br />
Mumbai-400 021 and includes the Client’s representatives, successors and<br />
assigns.<br />
‘Architect/ consultants’ shall mean ARCHITECTS KRISHNA SHAH , MINESH<br />
SHAH, 6, PARSHWANATH SOC, BESIDES KAILASH PARK SOC, AKOTA ,<br />
VADODAR – 20 and includes its representative, successors and assigns.<br />
1.1.2 ‘Site Engineer’ shall mean an Engineer appointed by the Bank or the Architect or<br />
by the Bank through Architect<br />
1.1.3 As their representative to give instructions to the contractor.<br />
1.1.4 ‘The Contractor’ shall mean the individual or firm or company whether<br />
incorporated or not, undertaking the works and shall include legal personal<br />
representative of such individual or the composing the firm or company and the<br />
permitted assignees of such individual or firm or company.<br />
The expression ‘Works’ or ‘Work’ shall mean the permanent or temporary work<br />
described in the ‘Scope of Work’ and / or to be executed in accordance with the<br />
contract and includes materials, apparatus, equipments, temporary supports,<br />
fittings and things of all kinds to be provided, the obligations of the contractor<br />
hereunder and work to be done by the contractor under the contract.<br />
1.1.5 ‘Engineer’ shall mean the representative of the Architect/ Consultant.<br />
1.1.6 ‘Drawings’ shall mean the drawings prepared by the Architects and issued by the<br />
Engineer and referred to in the specifications and any modifications of such<br />
drawings as may be issued by the Engineer from time to time ‘Contract value<br />
shall mean the value of the entire work as stipulated in the letter of acceptance of<br />
tender subject to such additions thereto or deductions there from as may be<br />
made under the provision herein after contained.<br />
Tender Document UBI Deva branch
1.1.7 ‘Specifications’ shall mean the specifications referred to in the tender and any<br />
modifications thereof as may time to time be furnished or approved by the<br />
Architects/ consultant. “Month” mean calendar month.<br />
1.1.8 ‘Week’ means seven consecutive days.<br />
1.1.9 ‘Day” means a calendar day beginning and ending at 00 hr and 24 hrs<br />
respectively.<br />
CLUASE<br />
1.0 Total Security Deposit<br />
Total Security Deposit shall be as defined in “ INSTRUCTIONS TO THE<br />
TENDERES”<br />
a) Earnest Money Deposit:<br />
16<br />
The tenderer shall furnish EMD as specified in the NIT in the form of Demand<br />
draft drawn in favor of the Union Bank Of India on any Scheduled Bank. No<br />
tender shall be considered unless the EMD is so deposited in the required form.<br />
No interest shall be paid on this EMD. The EMD of the unsuccessful tenderer<br />
shall be refunded soon after the decision to award the contract is taken without<br />
interest. The EMD shall stand absolutely forfeited if the tenderer revoke his<br />
tender at any time during the period when he is required to keep his tender open<br />
for acceptance by the UBI or after it is accepted by the UBI the contractor fails to<br />
enter into a formal agreement or fails to pay the initial security deposit as<br />
stipulated or fails to commence the work within the stipulated time.<br />
b) Initial Security Deposit (ISD)<br />
The ISD shall be as defined in the “ INSTRUCTIONS TO THE TENDERES”<br />
c) Retention Money:<br />
The retention amount shall be deducted, recovered and refunded as defined and<br />
explained in the “INSTRUCTIONS TO THE TENDERES”.<br />
2.0 Language<br />
The language in which the contract documents shall be drawn shall be in<br />
English.<br />
Tender Document UBI Deva branch
3.0 Errors, omissions and discrepancies<br />
17<br />
In case of errors, omissions and / or disagreement between written and scaled<br />
dimensions on the drawings or between the drawings and specifications etc., the<br />
following order shall apply:<br />
i) Between scaled and written dimension (or description) on a drawing, the latter<br />
shall be adopted.<br />
ii) Between the written or shown description or dimensions in the drawings and the<br />
corresponding one in the specification the former shall be taken as correct.<br />
iii) Between written description of items in the specifications and description in bills<br />
of quantities of the same former shall be adopted.<br />
a) In case of difference between rates written in figures and words, the rate in word<br />
shall prevail.<br />
b) Between the duplicate/ subsequent copies of the tender, the original tender shall<br />
be taken as correct.<br />
4.0 Scope of work:<br />
The contractor shall carryout complete and maintain the said work in every<br />
respect strictly in accordance with this contract and with the directions of and to<br />
the satisfaction of the Bank to be communicated through the Architect/<br />
Consultant. The Architect/ Consultant at the directions of the Bank from time to<br />
time, issue further drawings and/ or written instructions, detail directions and<br />
explanations which are hereafter collectively referred to as the Architect/<br />
Consultant’s instructions in regard to the variation or modification of the design,<br />
quality or quantity of work or the addition or omission or submission of any work.<br />
Any discrepancy in the drawings or between the BOQ and/ or drawings and/ or<br />
specifications, the removal from the site of any material brought thereon by the<br />
Contractor and any submission of any other materials thereof the removal and or<br />
re-execution of any work executed by him, the dismissal from the work of any<br />
person employed/ engaged there upon.<br />
5.0<br />
(I) Letter of acceptance:<br />
Within the validity period of the tender, the Bank shall issue a letter of<br />
acceptance either directly or through the Architect/ Consultant by registered post<br />
or otherwise depositing at the address of the contractor as given in the tender to<br />
enter into a Contract for the execution of the work as per the terms of the tender.<br />
The letter of acceptance shall constitute a binding contract between the UBI and<br />
the contractor.<br />
Tender Document UBI Deva branch
(II) Contract Agreement:<br />
18<br />
On receipt of intimation of the acceptance of tender from the UBI/ Architect the<br />
successful tenderer shall be bound to implement the contract and within fifteen<br />
days thereof. He shall sign an agreement on a non judicial stamp paper of<br />
appropriate value.<br />
6.0 Ownership of drawings:<br />
All drawings, specifications and copies thereof furnished by the UBI through its<br />
Architect / Consultants are the properties of the UBI. They are not to be used on<br />
other work.<br />
7.0 Detailed drawings and instructions:<br />
The UBI through its Architect / Consultants shall furnish with reasonable<br />
promptness additional instructions by means of drawings or otherwise,<br />
necessary for the proper execution of the work. All such drawings and<br />
instructions shall be consistent with the contract document, true developments<br />
thereof and reasonably inferable there from.<br />
The work shall be executed in conformity therewith and the contractor will<br />
prepare a detailed program schedule indicating therein the date of start and<br />
completion of various activities on receipt of the work order and submit the same<br />
to the UBI through its Architect / Consultant.<br />
8.0 Copies of agreement<br />
Two copies of agreement duly signed by both the parties with the drawings shall<br />
be handed over to the contractors.<br />
9.0 Liquidating damages:<br />
If the contractor fails to maintain the required progress or to complete the work<br />
and clear the site including vacating their office on or before the contracted or<br />
extended date or completion without justification in support of the cause of delay,<br />
he may be called upon without prejudice to any other right of remedy available<br />
under the law to the UBI on account of such breach to pay a liquidated damages<br />
as mentioned in NIT<br />
10.0 Materials, Appliances and employees:<br />
Unless or otherwise specified the contractor shall provide and pay for all<br />
materials, labour, water, power, tools, equipment, transportation and any other<br />
facilities that are required for the satisfactory execution and completion of the<br />
work. Unless or otherwise specified. All materials shall be new and both<br />
workmanship and materials shall be of best quality. The contractor shall at all<br />
times enforce strict discipline and good order among his employees and shall not<br />
employ on the work any unfit person or any one not skilled in the work assigned<br />
Tender Document UBI Deva branch
19<br />
to him. Workman whose work or behavior is found to be unsatisfactory by the<br />
UBI/ Architect/Consultant shall be removed form the site immediately.<br />
11.0 Permits, laws and Regulations:<br />
Permits and licenses required for the execution of the work shall be obtained by<br />
the contractor at his own expenses. The contractor shall give notice and comply<br />
with the regulations, laws, and ordinances, rules, applicable to the contract. If the<br />
contractor observes any discrepancy between the drawings and specifications,<br />
he shall promptly notify the UBI in writing under intimation of the<br />
Architect/Consultant. If the contractor performs any act which is against the law,<br />
rules and regulations he shall meet all the costs arising there from and shall<br />
indemnity the UBI any legal actions arising there from.<br />
12.0 Setting out work:<br />
The contractor shall set out the work and shall be responsible for the true and<br />
perfect setting out the same and for the correctness of the positions, levels,<br />
dimensions, and alignment of all parts thereof and got it approved by the<br />
Architect/Consultant before proceeding with the work at any time any error in this<br />
respect shall appear during the progress of the works, irrespective of the fact that<br />
the layout had been approved by the Architect/Consultant the contractor shall be<br />
responsible for the same and shall at his own expenses rectify such error, if so,<br />
required to satisfaction of the UBI.<br />
13.0 Protection of works and property:<br />
The contractor shall continuously maintain adequate protection, of all his work<br />
from damage and shall protect the UBI’s properties from the injury or loss arising<br />
in connection with contract. He shall make good any such damage, injury, loss,<br />
except due to causes beyond his control and not due to his fault or negligence.<br />
He shall take adequate care and steps for protection of the adjacent properties.<br />
The contractor shall take all precautions for safety and protections of his<br />
employees on the works and shall comply with all applicable provisions of Govt.<br />
and local body’s safety laws and building codes to prevent accidents or injuries<br />
to persons or property on about or adjacent to his place of works.<br />
14.0 Inspections of work:<br />
The UBI/ Architect/Consultant or their representatives shall at all reasonable<br />
times have free access to the work site and/ or to the workshop, factories, or<br />
other places where materials are laying or from where they are obtained and the<br />
contractor shall give every facility to the UBI/ Architect/Consultant and their<br />
representatives necessary for inspection and examination and test of the<br />
materials and workmanship. No person unless authorized by the UBI/<br />
Architect/Consultant except the representative of Public authorities shall be<br />
allowed on the work at any time. The proposed work either during its<br />
construction stage or its completion can also be inspected by the Chief Technical<br />
Examiner’s organization a wing of Central Vigilance commission.<br />
Tender Document UBI Deva branch
15.0 Assignment and subletting:<br />
20<br />
The whole of work included in the contract shall be executed by the contractor<br />
and he shall not directly entrust and engaged or indirectly transfer, assign or<br />
underlet the contract or any part or share thereof or interest therein without the<br />
written consent of the UBI though the Architect and no undertaking shall relieve<br />
the contractor from the responsibility of the contractor form active<br />
superintendence of the work during its progress.<br />
16.0 Quality of materials, workmanship & Test<br />
i) All materials and workmanship shall be best of the respective kinds described in<br />
the contract and in accordance with the Architect/Consultant’s instruction and<br />
shall be subject from time to time to such test as the Architect/Consultant may<br />
direct at the place of manufacture or fabrication or on the site or in an approved<br />
testing laboratory. The contractor shall provide such assistance, instruments,<br />
machinery, labour and materials as are normally required for examining,<br />
measuring, sampling and testing any material or part of work before<br />
incorporation in the work for testing a may be selected and required by the<br />
Architect/Consultant.<br />
ii) Samples<br />
All samples of adequate numbers, size, shades & pattern as per specifications<br />
shall be supplied by the contractor without any extra charges. If certain items<br />
proposed to be used are of such nature that samples cannot be presented or<br />
prepared at the site detailed literature/ test certificate of the same shall be<br />
provided to the satisfaction of the Architect/Consultant,. Before submitting the<br />
sample/ literature the contractor shall satisfy himself that the material/ equipment<br />
for which he is submitting the sample/ literature meet with the requirement of<br />
tender specification. Only when the samples are approved in writing by the<br />
Architect/Consultant the contractor shall proceed with the procurement and<br />
installation of the particular material/ equipment. The approved samples shall be<br />
signed by the Architect/Consultant for the identification and shall be kept on<br />
record at site office until the completion of the work for inspection/ comparison at<br />
any time. The Architect/Consultant shall take responsibility time to approve the<br />
sample. Any delay that might occur in approving the samples for reasons of its<br />
not meeting the specifications or other discrepancies, inadequacy, delay in<br />
furnishing samples of best qualities from various manufactures and such other<br />
aspects causing delay on the approval of the material/ equipment etc. shall be to<br />
the account of the contractor.<br />
Tender Document UBI Deva branch
iii) Cost of Tests<br />
21<br />
The cost of making any test shall be borne by the contractor if such test is<br />
intended by or provided for in the specifications or BOQ.<br />
iv) Cost of test not provided for<br />
If any test is ordered by the Architect/Consultant which is either<br />
a) If so intended by or provide for or (in the cases above mentioned) is not so<br />
particularized, or though so intended or provided for but ordered by the<br />
Architect/Consultant to be carried out by an independent person at any place<br />
other than the site of the place of manufacture or fabrication of the materials<br />
tested or any Government/ approved laboratory, then the cost of such test shall<br />
be borne by the contractor.<br />
17.0 Obtaining information related to execution of work:<br />
No claim by the contractor for additional payment shall be entertained which is<br />
consequent upon failure on his part to obtain correct information as to any matter<br />
affecting the execution of the work or any misunderstanding or the obtaining<br />
incorrect information or the failure to obtain correct information relieve him from<br />
any risks or from the entire responsibility for the fulfillment of contract.<br />
18.0 Contractor’s superintendence<br />
The contractor shall give necessary personal superintendence during the<br />
execution of the works and as long, thereafter, as the Architect/ Consultant may<br />
consider necessary until the expiry of the defects liability period, stated hereto.<br />
19.0 Quantities:<br />
i) The bill of quantities (BOQ) unless or otherwise stated shall be deemed to have<br />
been prepared in accordance with the Indian Standard method of Measurements<br />
and quantities. The rate quoted shall remain valid for variation of quantity against<br />
individual item to any extent<br />
20.0 Works to be measured<br />
The Architect/Consultant may from time to time intimate to the contractor that he<br />
requires the work to be measured and the contractor shall forthwith attend or<br />
send a qualified representative to assist the Architect in taking such<br />
measurements and calculations and to furnish all particulars or to give all<br />
assistance required by any of them. Such measurements shall be taken in<br />
accordance with the mode of Measurements detailed in the specifications. The<br />
representative of the Architect/Consultant shall take the joint measurements with<br />
the contractor’s representative and the measurements shall be entered in the<br />
measurement book. The contractor or his authorized representative shall sign all<br />
the pages of the measurement book in which the measurements have been<br />
recorded in token of his acceptance. All the corrections shall be duly attested by<br />
both representatives. No over writings shall be made in the measurement book.<br />
Tender Document UBI Deva branch
22<br />
Should the contactor not attend or neglect or omit to depute his representative to<br />
take measurements then the measurements recorded by the representative of<br />
the Architect/Consultant shall be final. All authorized extra work, omissions and<br />
all variations made shall be included in such measurement.<br />
21.0 Variations<br />
No alteration, omission or variation ordered in writing by the Architect/ Consultant<br />
shall vitiate the contract. In case the UBI/ Architect/Consultant thinks proper at<br />
any time during the progress of works to make any alteration in, or additions to or<br />
omissions from the works or any alteration in the kind or quality of the materials<br />
to be used therein, the Architect/Consultant shall give notice thereof in writing to<br />
the contractor or shall confirm in writing within seven days of giving such oral<br />
instructions, the contractor shall alter to, add to, or omit from as the case may be<br />
in accordance with such notice, but the contractor shall not do any work extra to<br />
or make any alterations or additions to or omissions from the works or any<br />
deviation from any of the provisions of the contract, stipulations, specifications or<br />
contract drawings without previous consent in writing of the Architect/Consultant<br />
and the value of such extras, alternations, additions or omissions shall in all<br />
cases be determined by the Architect/Consultant and the same shall be added to<br />
or deducted from the contract value, as the case may be.<br />
22.0 Valuation of variations:<br />
No claim for an extra shall be allowed unless it shall have been executed under<br />
the authority of the Architect/Consultant with the concurrence of the UBI as<br />
herein mentioned. Any such extra is herein referred to as authorized extra and<br />
shall be made in accordance with the following provisions.<br />
a)<br />
i) The net rates or prices in the contract shall be determine in the valuation of the<br />
extra work where such extra work is of similar character and executed under<br />
similar conditions as the work priced herein.<br />
ii) Rates for all items, wherever possible should be derived out of the rates given in<br />
the priced BOQ.<br />
b) The net price of the original tender shall determine the value of the items<br />
omitted, provided if omissions do not vary the conditions under which any<br />
remaining items of works are carried out, otherwise the prices for the same shall<br />
be valued under sub-clause ( c) hereunder.<br />
c) Where the extra works are not of similar character and/ or executed under similar<br />
conditions are aforesaid or where the omissions vary the conditions under which<br />
any remaining items or works are carried out, then the contractor shall within 7<br />
days of the receipt of the letter of acceptance inform the Architect/Consultant of<br />
the rate which he intends to charge for such items of work, duly supported by<br />
analysis of the rate or rates claimed and the Architect/Consultant shall fix such<br />
rate or prices as in the circumstances in his opinion are reasonable and proper,<br />
based on the market rate.<br />
d) Where extra work cannot be properly measured or valued the contractor shall be<br />
allowed day work prices at the net rats stated in the tender of the BOQ or, if not,<br />
Tender Document UBI Deva branch
23<br />
so stated then in accordance with the local day work rates and wedges for the<br />
district; provided that in either case, vouchers specifying the daily time (and if<br />
required by the Architect/Consultant) the workman’s name and materials<br />
employed be delivered for verifications to the Architect/Consultant at or before<br />
the end of the week following that in which the work has been executed.<br />
e) It is further clarified that for all such authorized extra items where rates cannot be<br />
derived from the tender, the Contractor shall submit rates duly supported by rate<br />
analysis worked on the “market rate basis” for material, labour, hire/ running<br />
charges of equipments and wastage etc. plus 15% toward establishment<br />
charges, contractor’s overheads and profits. Such items shall not be eligible for<br />
escalation.<br />
23.0 Final measurements:<br />
The measurements and the valuation in respect of the contract shall be<br />
completed within six months of the virtual completion of the work.<br />
24.0 Virtual Completion Certificate (VCC)<br />
On successful completion of the entire works covered by the contract to the full<br />
satisfaction of the UBI, the contractor shall ensure that the following works has<br />
been completed to the satisfaction of the UBI.<br />
a) Clear the site of all scaffolding, wiring, pipes, surplus materials, contractor’s<br />
labour, equipment and machinery.<br />
b) Demolish, dismantle and remove the contractor’s site office, temporary works,<br />
structure including labour sheds/ camps and construction of other items and<br />
things whatsoever brought upon or erected at the site or any land allotted to the<br />
contractor by the UBI and not incorporated in the permanent works.<br />
c) Remove all rubbish, debris etc. from the site and the land allotted to the<br />
contactor by the UBI and shall clear, level, and dress, compact the site as<br />
required by the UBI.<br />
d) Shall put the UBI in undisputed custody and possession of the site and all land<br />
allotted by the UBI.<br />
e) The contractor shall hand over the work in a peaceful manner to the UBI.<br />
f) All defects/ imperfection have been attended and rectified as pointed out by the<br />
UBI to the full satisfaction of the UBI.<br />
Upon the satisfactory fulfillment by the contractor as stated above, the contractor<br />
shall be entitled to apply to the Architect/Consultant is satisfied of the completion<br />
of the work. Relative to which the completion certificate has been sought, the<br />
Architect/Consultant shall within fourteen (14) days of the receipt of the<br />
application for virtual completion certificate, issue a VCC in respect of the work<br />
for which the VCC has been applied.<br />
Tender Document UBI Deva branch
24<br />
This issuance of a VCC shall be without prejudice to the UBI’s rights and<br />
contractors liabilities under the contract including the contractor’s liability for<br />
defect liability period nor shall the issuance of VCC in respect of the works or<br />
work at any site be construed as a waiver of any right or claim of the UBI against<br />
the contractor in respect of works or works at the site and in respect of which the<br />
VCC has been issued.<br />
25.0 Work by other agencies:<br />
The UBI / the Architect/Consultant reserve the rights to use premises and any<br />
portion of the site for execution of any work not included in the scope of this<br />
contract which it may desire to have carried out by other persons simultaneously<br />
and the contractor shall not only allow but also extend reasonable facilities for<br />
the execution of such work. The contractor however shall not be required to<br />
provide any plant or material for the execution of such work except by special<br />
arrangement with the UBI. Such work shall be carried out in such manner as not<br />
to impede the progress of the works included in the contract.<br />
26.0 Insurance of works:<br />
Without limiting his obligations and responsibilities under the contract the<br />
contractor shall insure the work against all loss or damages from whatsoever<br />
cause arising other then the excepted risks, for which he is responsible under the<br />
terms of contract and in such a manner that the UBI shall remain indemnified.<br />
26.1 Damage to persons and property<br />
The contractor shall, except if and so far as the contract provides otherwise<br />
indemnify the UBI against all losses and claims in respect of injuries or damages<br />
to any person or material or physical damage to any property whatsoever which<br />
may arise out of or in consequence of the execution and maintenance of the<br />
works and against all claims proceedings, damages, costs, charges and<br />
expenses whatsoever in respect of or in relation thereto except any<br />
compensation of damages for or with respect to:<br />
a) The permanent use or occupation of land by or any part thereof.<br />
b) The right of UBI to execute the works or any part thereof, over, under, in or<br />
through any lands.<br />
c) Injuries or damages to persons or properties which are unavoidable result of the<br />
execution or maintenance of the works in accordance with the contract.<br />
d) Injuries or damages to persons or properties resulting from any act or neglect of<br />
the UBI, their agents, employees or other contractors not being employed by the<br />
contractor or for or in respect of any claim, proceedings damages, costs, charges<br />
and expenses in respect thereof or in relation thereto or where the injury or<br />
damage was contributed to by the contractor, his servants or agents. Such part<br />
of the compensation as may be just and equitable having regard to the extent of<br />
Tender Document UBI Deva branch
25<br />
the responsibility of the UBI, their employees, or agents or other employees, or<br />
agents or other contractors for the damage or injury.<br />
26.2 Contractor to indemnify UBI<br />
The contractor shall indemnify the UBI against all claims, proceedings, damages,<br />
costs, charges and expenses in respect of the matters referred to in the provision<br />
of this sub-clause 26.2<br />
26.3 Contractor’s superintendence<br />
The contractor shall fully indemnify and keep indemnified the UBI against any<br />
action, claim, or proceeding relating to infringement or use of any patent or<br />
design or any alleged patent or design rights and shall pay any royalties which<br />
may be payable in respect of any article or part thereof included in the contract.<br />
In the event of any claim made under or action brought against UBI in respect of<br />
such matters as aforesaid the contractor shall be immediately notified thereof<br />
and the contractor shall be at liberty, at his own expenses to settle any dispute or<br />
to conduct any litigation that may arise there from, provided that the contractor<br />
shall not be liable to indemnify the UBI if the infringement of the patent or design<br />
or any alleged patent or design right is the direct result of an order passed by the<br />
Architect/Consultant in this behalf.<br />
26.4 Third party Insurance<br />
26.4.1 Before commencing the execution of the work the contractor but without limiting<br />
his obligations and responsibilities under clause 26.0 of GCC shall insure against<br />
his liability for any material or physical damage, loss, or injury which may occur<br />
to any property including that of UBI, or to any person, including any employee of<br />
the UBI, by or arising out of the execution of the works or in the carrying out of<br />
the contract, otherwise than due to the matters referred to in the provison to<br />
clause 26.0 thereof.<br />
26.5 Accident or Injury to workman:<br />
26.5.1 The UBI shall not be liable for or in respect of any damages or compensation<br />
payable at law in respect or in consequence of any accident or injury to any<br />
workman or other person in the employment of the contractor or any subcontractor,<br />
save and expect an accident or injury resulting from any act or default<br />
of the UBI or their agents, or employees. The contractor shall fully indemnify and<br />
keep indemnified the UBI against all such damages and compensations, save<br />
and except as aforesaid and against all claims proceedings, costs, charges and<br />
expenses whatsoever in respect thereof or in relation thereto.<br />
26.5.2 Insurance against accidents etc. to workmen:<br />
The contractor shall insure against such liability with an insurer approved by the<br />
UBI during the whole of the time that any person are employed by him on the<br />
works and shall, when required, produce to the Architect/Consultant such policy<br />
of insurance and receipt for payments of the current premium. Provide always<br />
Tender Document UBI Deva branch
26<br />
that, in respect of any persons employed by any sub-contractor, the contractor’s<br />
obligation to insure as aforesaid under this sub-clause shall be satisfied if the<br />
sub contractor shall have insured against the liability in respect of such persons<br />
in such manner that UBI is indemnified under the policy but the contractor shall<br />
require such sub-contractor to produce to the Architect/Consultant when such<br />
policy of insurance and the receipt for the payment of the current premium.<br />
26.5.3 Remedy on Contractor’s failure to insure:<br />
If the contractor fails to effect and keep in force the insurance to above referred<br />
to above or any other insurance which he may be required to effect under the<br />
terms of contract, then and in any such case the UBI may effect and keep in<br />
force any such insurance and pay such premium or premiums as may be<br />
necessary for that purpose and from time to time deduct the amount so paid by<br />
the UBI as aforesaid from any amount due or which may become due to the<br />
contractor, or recover the same as debt from the contractor.<br />
26.5.4 Without prejudice to the other rights of the UBI against the contractor, in respect<br />
of such default, the employer shall be entitled to deduct from any sums payable<br />
to the contractor the amount of any damages, costs, charges, and other<br />
expenses paid by the UBI and which are payable by the contractor under this<br />
clause. The contractor shall upon settlement by the insurer of any claim made<br />
against the insurer pursuant to a policy taken under this clause, proceed with<br />
due diligence to rebuild or repair the works destroyed or damaged. In this event<br />
all the monies received from the insurer in respect of such damage shall be paid<br />
to the contractor and the contractor shall not be entitled to any further payment in<br />
respect of the expenditure incurred for rebuilding or repairing of the materials or<br />
good destroyed or damaged.<br />
27.0 Commencement of Works:<br />
The date of commencement of the work will be reckoned as the date of handing<br />
over site or fifteen days from the date of issue of letter of acceptance of the<br />
tender by the UBI whichever is later.<br />
28.0 Time of completion:<br />
Time is essence of the contract and shall be strictly observed by the contractor.<br />
The entire work shall be completed within as specified in the NIT from the date of<br />
commencement. If required in the contract or as directed by the<br />
Architect/Consultant, the contractor shall complete certain portions of work<br />
before completion of the entire work. However the completion date shall be<br />
reckoned as the date by which the whole work is completed as per the terms of<br />
the contract.<br />
Tender Document UBI Deva branch
29.0 Extension of time:<br />
27<br />
If, in the opinion of the Architect/Consultant, the work be delayed for reasons<br />
beyond the control of the contractor, the Architect/Consultant may submit a<br />
recommendation to the UBI to grant a fair and reasonable extension of time for<br />
completion of work as per the terms for contract. If the contractor needs an<br />
extension of the time for completion of the work or if the completion of work is<br />
likely to be delayed for any reasons beyond the due date of completion as<br />
stipulated in the contract, the contractor shall apply to the UBI through the<br />
Architect/Consultant in writing at least 30 days before the expiry of the scheduled<br />
time and while applying for extension of time he shall furnish the reasons in<br />
detail and his justification if any, for the delays. The Architect/Consultant shall<br />
submit their recommendations to the UBI in the prescribed format for granting<br />
extension of time. While granting extension of time the contractor shall be<br />
informed the period extended times, which will quality for levy of liquidated<br />
damages. For the balance period in excess of original stipulated period and duly<br />
sanctioned extension of time by the UBI. The provision of liquidated damages as<br />
stated under clause 9 of GCC shall become applicable. Further the correct shall<br />
remain in force even for the period beyond the due date of completion<br />
irrespective whether the extension is granted or not.<br />
30.0 Rate of progress:<br />
Whole of the materials, plant and labour to be provided by the contractor and the<br />
mode, manner and speed of execution and maintenance of the works to be of a<br />
kind and conducted in a manner to the satisfaction of the Architect/Consultant<br />
should the rate of progress of the work or any part thereof be at any time be in<br />
the opinion of the Architect/Consultant too slow to ensure the completion of the<br />
whole of the work by the prescribed time or extended time for completion the<br />
Architect/Consultant shall thereupon take such steps as considered necessary<br />
by the Architect/Consultant to expedite progress so as to complete the works by<br />
the prescribed time or extended time. Such communications from the<br />
Architect/Consultant neither shall relieve the contractor from fulfilling obligations<br />
under the contract nor will he be entitled to raise any claims arising out of such<br />
directions.<br />
31.0 Work during nights and holidays:<br />
Subject to any provision to the contrary contained in the contract no permanent<br />
work shall save as herein provided be carried on during the night or on holidays<br />
without the permission in writing of the Architect/Consultant, save when the work<br />
is unavoidable or absolutely necessary for the saving of life or property or for the<br />
safety of the work in which case the contractor shall immediately advise the<br />
Architect/Consultant. However, the provisions of the clause shall not be<br />
applicable in the case of any work which becomes essential to carry by rotary or<br />
double shifts in order to achieve the progress and quality of the part of the work<br />
being technically required/ continued with the prior approval of the<br />
Architect/Consultant at no extra cost to the UBI.<br />
Tender Document UBI Deva branch
28<br />
All work at night after obtaining approval from competent authorities shall be<br />
carried out without unreasonable noise and disturbance.<br />
32.0 No compensation for restrictions of work:<br />
If at any time after acceptance of the tender UBI shall deduct to abandon or<br />
reduce the scope of work for any reason whatsoever and hence not required the<br />
whole or any part of the work to be carried out, the Architect/Consultant shall<br />
give notice in writing to that effect to the contactor and the contactor shall act<br />
accordingly. In the matter the contactor shall have no claim to any payment of<br />
compensation or otherwise whatsoever on account of any profit or advantage<br />
which he might have derived from the execution of the work fully but which he<br />
did not derive in consequences of the foreclosure of the whole or part of the<br />
work.<br />
Provided that the contactor shall be paid the charges on the cartage only of<br />
materials actually and bonafide brought to the site of the work by the contactor<br />
and rendered surplus as a result of the abandonment, curtailment of the work or<br />
any position thereof and taken back by the contactor, provided however that the<br />
Architect/Consultant shall have in such cases the opinion of taking over all or any<br />
such material at their purchase price or at local current rate whichever is less.<br />
“In case of such stores having been issued form UBI stores and returned by the<br />
contactor to stores, credits shall be given to him at the less rate not exceeding<br />
those at which were originally issued to the contactor after taking into<br />
consideration and deduction for claims on account of any deterioration or<br />
damage while in the custody of the contactor and in this respect the decision of<br />
the Architect/Consultant shall be final.<br />
33.0 Suspension of work:<br />
i) The contactor shall, on receipt of the order in writing of the Architect/Consultant<br />
(whose decision shall be final and binding on the contractor) suspend the<br />
progress of work or any part thereof for such time and in such manner as the<br />
Architect/Consultant may consider necessary so as not to cause any damage or<br />
injury to the work already done or endanger the safety thereof for any of the<br />
following reasons:<br />
a) On account any default on the part of the contractor, or<br />
b) For proper execution of the works or part thereof for reasons other than the<br />
default the contactor or<br />
c) The contactor shall during such suspension, properly protect and secure the<br />
works to the extent necessary and carry out the instructions given in that behalf<br />
by the Architect/Consultant<br />
ii) If the suspension is ordered for reasons (b) and (c) in sub-para (i) above: The<br />
contactor shall be entitled to an extension of time equal to the period of every<br />
such suspension. No compensation whatsoever shall be paid on this account.<br />
Tender Document UBI Deva branch
34.0 Action when the whole security deposit is forfeited<br />
29<br />
In any case in which under any clause or clauses of this contract, the contactor<br />
shall have rendered himself liable to pay compensation amounting to the whole<br />
of his security deposit the Architect/Consultant shall have the power to adopt<br />
any of the following course as they may deem best suited to the interest of the<br />
UBI.<br />
a) To rescind the contact (of which rescission notice in writing to the contactor by<br />
the Architect/Consultant shall be conclusive evidence) and in which case the<br />
security deposit of the contactor shall be forfeited and be absolutely at the<br />
disposal of UBI.<br />
b) To employ labour paid by the UBI and to supply materials to carry out the work,<br />
or any part of the work, debiting the contactor with the cost of the labour and<br />
materials (the cost of such labour and materials as worked out by the<br />
Architect/Consultant shall be final and conclusive against the contractor.) and<br />
crediting him with the value of the work done, in all respects in the same manner<br />
and at the same rates as if it had been carried out by the contractor under the<br />
terms of this contract, the certificate of the Architect/Consultant as to the value of<br />
work done shall be final and conclusive against the contractor.<br />
c) To measure up the work of the contractor, and to take such part thereof as shall<br />
be unexecuted, out of his hands, and to give it to another contractor to complete<br />
in which case any expenses which may be incurred in excess of the sum which<br />
would have been pad to the original contractor, if the whole work had been<br />
executed by him (of the amount of which excess the certificates in writing of the<br />
Architect/Consultant shall be final and conclusive) shall be borne by original<br />
contractor and may be deducted from any money due to him by the UBI under<br />
the contract or otherwise, or from his security deposit or the proceeds of sale<br />
thereof, or sufficient part thereof.<br />
In the event of any of above courses being adopted by the UBI the contractor<br />
shall have no claim for compensation for any loss sustained by him by reasons<br />
of his having purchased or procured any material or entered into any<br />
engagements or make any advances on account of, or with a view to the<br />
execution of the work or the performance of the contract and in case the contract<br />
shall rescind under the provision aforesaid, the contractor shall not be entitled to<br />
recover or to be paid any sum or any work thereto for actually performed under<br />
this contract, unless, and until the Architect/Consultant will have certified in<br />
writing the performance of such work and the value payable in respect thereof,<br />
and he shall only be entitled to be paid the value so certified.<br />
35.0 Owner’s right to terminate the contract:<br />
If the contractor being an individual or a firm commit any ‘Act of Insolvency’ or<br />
shall be adjusted an Insolvent or being an incorporated company shall have an<br />
order for compulsory winding up voluntarily or subject to the supervision of Govt.<br />
and of the Official Assignee of the liquidator in such acts of insolvency or winding<br />
up shall be unable within seven days after notice to him to do so, to show to the<br />
reasonable satisfaction of the Architect/Consultant that he is able to carry out<br />
Tender Document UBI Deva branch
30<br />
and fulfill the contract and to give security therefore if so required by the<br />
Architect/Consultant.<br />
Or if the contractor (whether an individual firm or incorporated company) shall<br />
suffer execution to be issued or shall suffer any payment under this contract to<br />
be attached by or on behalf of any of the creditors of the contractor.<br />
Or shall assign or sublet this contract without the consent in writing of the UBI<br />
through the Architect/Consultant or shall charge or encumber this contract or any<br />
payment due to which may become due to the contractor there under:<br />
a) has abandoned the contract ; or<br />
b) has failed to commence the works, or has without any lawful excuse under these<br />
conditions suspended the progress of the works for 14 days after receiving from<br />
the UBI through the Architect/Consultant written notice to proceed, or<br />
c) has failed to proceed with the works with such diligence and failed to make such<br />
due progress as would enable the works to be completed with in the time agreed<br />
upon, or has failed to remove the materials from the site or to pull down and<br />
replace work within seven days after written notice from the UBI through the<br />
Architect/Consultant that the said materials were condemned and rejected by the<br />
Architect/Consultant under these conditions; or has neglected or failed<br />
persistently to observe and perform all or any of the acts, matters or things by<br />
this contract to be observed and performed by the contractor for seven days after<br />
written notice shall have been given to the contractor to observe or perform the<br />
same or has to the detriment of good workmanship or indefiance to the UBI’s or<br />
the Architect/Consultant’s instructions to the contrary subject any part of the<br />
contract. Then and in any of said cases the UBI and or the Architect/Consultant,<br />
may not withstanding any previous waiver, after giving seven days notice in<br />
writing to the contractor, determine the contract, but without thereby affecting the<br />
power the UBI or the Architect/Consultant or the obligation and liabilities of the<br />
contractor the whole of which shall continue in force as fully as if the contract had<br />
not been so determined and as if the works subsequently had been executed by<br />
or on behalf of the contractor. And further the UBI through the<br />
Architect/Consultant their agents or employees may enter upon and take<br />
possession of the work and all plants, tools, scaffoldings, materials, sheds,<br />
machineries lying upon the premises or on the adjoining lands or roads use the<br />
same by means of their own employees or workmen in carrying on and<br />
completing the work or by engaging any other contractors or persons to<br />
complete the work and the contractor shall not in any was interrupt or do any<br />
act, matter or thing to prevent or hinder such other contractor or other persons<br />
employed for completing and finishing or using the materials and plant for the<br />
works.<br />
When the works shall be completed as soon thereafter as convenient the UBI or<br />
the Architect/Consultant shall give a notice in writing to the contractor to remove<br />
his surplus materials and plants and should the contractor fail to do so within 14<br />
days after receipt thereof by him the UBI sell the same by public auction after<br />
due publication, and shall adjust the amount released by such auction. The<br />
contractor shall have o right to question any of the act of the UBI incidental to the<br />
sale of the materials etc.<br />
Tender Document UBI Deva branch
36.0 Certificate of payment:<br />
31<br />
The contractor shall be entitled under the certificates to be issued by the<br />
Architect/Consultant to the contractor within 10 working days from the date of<br />
receipt of certificate to the payment from UBI from time to time. The UBI shall<br />
recover the statutory recoveries other dues including the retention amount from<br />
the certificates of payments.<br />
They shall provide always that the issue of any certificate by the<br />
Architect/Consultant during the progress of works or completion shall not have<br />
effect as certificate of satisfaction or relive the contractor from his liability under<br />
clause.<br />
The Architect/Consultant shall have power to withhold the certificate if the work<br />
or any part thereof is not carried out to their satisfaction.<br />
The Architect/Consultant may by any certificate make any corrections required in<br />
previous certificate.<br />
The UBI shall modify the certificate of payments as issued by the<br />
Architect/Consultant from time to time while making the payment.<br />
The contractor shall submit interim bills only after taking actual measurements<br />
and properly recorded in the M books.<br />
The contractor shall be paid on interim bills on producing detailed bill and after<br />
the approval of architect and sanctioned by regional office.<br />
The final bill may be submitted by the contractor within a period of one month<br />
from the date of virtual completion and the Architect/Consultant shall issue the<br />
certificate of payment within a period of two months. The UBI shall pay the<br />
amount within a period of three months form the date of issue of certificate<br />
provided there is no dispute in respect of rates and quantities etc.<br />
The contractor shall submit the interim bills in the prescribed format with all<br />
details.<br />
Tender Document UBI Deva branch
32<br />
37.0 SETTLEMENT OF DISPUTES AND ARBITRATION:<br />
Except where otherwise provided in the contract all questions and disputes<br />
relating to the meaning of the specifications, design, drawings and instructions<br />
herein before mentioned and as to the quality of workmanship or materials used<br />
on the work or as to any other question, claim, right, matter or thing whatsoever<br />
in any way arising out of or relating to the contract, designs, drawings,<br />
specifications, estimates, instruction, orders or these conditions or otherwise<br />
concerning the work or the execution or failure to execute the same whether<br />
arising during the progress of the work or after the cancellation, termination,<br />
completion or abandonment thereof shall be dealt with as mentioned hereinafter.<br />
i) If the contractor consider that he is entitled to any extra payment or<br />
compensation in respect of the works over and above the amounts admitted as<br />
payable by the Architect or in case the contractor wants to dispute the validity of<br />
any deductions or recoveries made or proposed to be made from the contract or<br />
raise any dispute, the contractor shall forthwith give notice in writing of his claim,<br />
or dispute to the Asst. General Manager (PSS), UNION Bank Of India,<br />
Sayajigunj, VADODARA and endorse a copy of the same to the Architect, within<br />
30 days from the date of disallowance thereof or the date of deduction or<br />
recovery. The said notice shall given full particulars of the claim, grounds on<br />
which it is based and detailed calculations of the amount claimed and the<br />
contractor shall not be entitled to raise any claim nor shall the Bank be in any<br />
way liable in respect of any claim by the contractor unless notice of such claim<br />
shall have been given by the contractor to the the Asst. General Manager ,<br />
union Bank Of India, Sayaji gunj, VADODARA in the manner and within the time<br />
as aforesaid. The contractor shall be deemed to have waived and extinguished<br />
all his rights in respect of any claim not notified to the Asst. General Manager<br />
(PSS) in writing in the manner and within the time aforesaid.<br />
ii) The Asst. General Manager (PSS) shall give his decision in writing on the claims<br />
notified by the contractor. The contractor may within 30 days of the receipt of the<br />
decision of the Asst. General Manager (PSS) submit his claims to the conciliating<br />
authority namely the Deputy General Manager, Union Bank of India, Regionl<br />
office, sayajigunj Vadodara for conciliation along with all detail and copies of<br />
correspondence exchanged between him and the Asst. General Manager (PSS)<br />
iii) If the conciliation proceedings are terminated without settlement of the disputes,<br />
the contractor shall, within a period of 30 days of termination thereof shall give a<br />
notice to the concerned Chief General Manager of the Bank for appointment of<br />
an arbitrator to adjudicate the notified claims failing which the claims of the<br />
contractor shall be deemed to have been considered absolutely barred and<br />
waived.<br />
iv) Except where the decision has become final, binding and conclusive in terms of<br />
the contract, all disputes or differences arising out of the notified claims of the<br />
contractor as aforesaid and all claims of the Bank shall be referred for<br />
adjudication through arbitration by the Sole Arbitrator appointed by the Chief<br />
General Manager. It will also be no objection to any such appointment that the<br />
Arbitrator so appointed is a Bank Officer and that he had to deal with the matters<br />
Tender Document UBI Deva branch
33<br />
to which the contract relates in the course of his duties as Bank Officer. If the<br />
arbitrator so appointed is unable or unwilling to act or resigns his appointment or<br />
vacates his office due to any reason whatsoever another sole arbitrator shall be<br />
appointed in the manner aforesaid by the said Chief General Manager. Such<br />
person shall be entitled to proceed with the reference from the stage at which it<br />
was left by his predecessor.<br />
It is a term of this contract that the party invoking arbitration shall give a list of<br />
disputes with amounts claimed in respect of each dispute along with the notice<br />
for appointment of arbitrator.<br />
It is also a term of this contract that no person other than a person appointed by<br />
such Chief General Manager as aforesaid should act as arbitrator.<br />
The conciliation and arbitration shall be conducted in accordance with the<br />
provisions of the Arbitration & Conciliation Act 1996 or any statutory modification<br />
or reenactment thereof and the rules made there under.<br />
It is also a term of this contract that if any fees are payable to the arbitrator,<br />
these shall be paid equally by both the parties. However, no fees will be payable<br />
to the arbitrator if he is a Bank Officer.<br />
It is also a term of this contract that the arbitrator shall be deemed to have<br />
entered on the reference on the date he issues notice to both the parties calling<br />
them to submit their statement of claims and counter statement of claims. The<br />
venue of the arbitration shall be such place as may be fixed by the arbitrator in<br />
his sole discretion. The fees, if any, of the arbitrator shall, if required to be paid<br />
before the award is made and published, be paid half and half by each of parties.<br />
The cost of the reference and of the award (including the fees, if any, of the<br />
arbitrator) shall be in the discretion of the arbitrator who may direct to any by<br />
whom and in what manner, such costs or any part thereof, shall be paid and fix<br />
or settle the amount of costs to be so paid.<br />
38.0 Water Supply<br />
The Bank shall provide water at one fixed point free of cost but subject to<br />
availability. If Bank is not able to provide water for what so ever the reason/s, the<br />
contractor shall make his own arrangement for water required for the work and<br />
nothing extra will be paid for the same. This will be subjected to the following<br />
conditions:<br />
i) That the water used by the contractor shall be fit for construction purposes to the<br />
satisfaction of the Architect/Consultant.<br />
ii) The contractor shall make alternative arrangement for the supply of water if the<br />
arrangement made by the contractor for procurement of water in the opinion the<br />
Architect/Consultant is unsatisfactory.<br />
38.1 The contractor shall construct temporary well/ tube well in UBI land for taking<br />
water for construction purpose only after obtaining permission in writing for the<br />
UBI. The contractor has to make his own arrangements for drawing and<br />
Tender Document UBI Deva branch
34<br />
distributing the water at his own cost. He has to make necessary arrangements,<br />
to avoid any accidents or damage caused due to construction and subsequent<br />
maintenance of the well. He has to obtain necessary approvals from the local<br />
authorities, if required, at his own cost. He shall restore the ground to its original<br />
condition after wells are dismantled on completion of the work or hand over the<br />
well to the UBI without any compensation as directed by the<br />
Architect/Consultant.<br />
39.0 Power Supply:<br />
The Bank shall provide Electricity at one fixed point free of cost but subject to<br />
availability. If Bank is not able to provide Electricity for what so ever the reason/s,<br />
the contractor shall make his own arrangement for power and supply/ distribution<br />
system for driving plant or machinery for the work and for lighting purpose at his<br />
own cost. The cost of running and maintenance of the plants are to included in<br />
his tender prices. He shall pay all fees and charges required for the power supply<br />
and include the same in his tendered rates and hold the owner free from all such<br />
costs. He has to obtain necessary approvals from the appropriate authorities, if<br />
required.<br />
40.0 Treasure trove etc. :<br />
Any treasure trove, coin or object antique which may be found on the site shall<br />
be the property of the UBI and shall be handed over to the bank immediately.<br />
41.0 Method of measurements:<br />
Unless otherwise mentioned in the schedule of quantities or in mode of<br />
measurement or elsewhere in these documents the measurement will be on the<br />
net quantities or work produced in accordance with up to date as per rules laid<br />
down by the Bureau of Indian Standards. In the event any dispute/disagreement<br />
the decision of the Architect/Consultant shall be final and binding on the<br />
contractor.<br />
42.0 Maintenance of registers:<br />
The contractor shall maintain the registers as directed/instructed by the<br />
Bank/Architects as per the approved Performa at site of work and should<br />
produce the same for inspection of the UBI/ the Architect/Consultant whenever<br />
desired by them. The contractor shall also maintain the records/ registers as<br />
required by the local authorities/ Govt. from time to time.<br />
43.0 Force Majeure:<br />
43.1 Neither contractor nor UBI shall be considered in default in performance of their<br />
obligations if such performance is prevented or delayed by events such as but not<br />
to war, hostilities revolution, riots, civil commotion, strikes, lockout, conflagrations,<br />
epidemics, accidents, fire, storm, floods, droughts, earthquakes or ordinances or<br />
any act of god or for any other cause beyond the reasonable control of the party<br />
affected or prevented or delayed. However a notice is required to be given within<br />
Tender Document UBI Deva branch
35<br />
30 days from the happening of the event with complete details to the other party to<br />
the contract, if it is not possible to serve a notice, within the shortest possible period<br />
without delay.<br />
43.2 As soon as the clause of force majeure has been removed the party whose<br />
ability to perform its obligations has been affected, shall notify the other of such<br />
cessation and the actual delay incurred in such affected activity adducing<br />
necessary evidence in support thereof.<br />
43.3 From the date of occurrence of a case of force majeure obligations of the party<br />
affected shall be suspended during the continuance of any inability so caused. With<br />
the cause it and inability resulting there form having been removed, the agreed<br />
time of completion of the respective obligations under this agreement shall stand<br />
extended by a period equal to the period of delay occasioned by such events.<br />
43.4 Should one or both parties be prevented from fulfilling the contractual obligations<br />
by a state of force major lasting to a period of 6 months or more the two parties<br />
shall each other to decide regarding the future execution of this agreement?<br />
44.0 Local laws, Acts, Regulations:<br />
The contractor shall strictly adhere to all prevailing labour laws inclusive of<br />
contract labour (regulation and abolition act of 1970) and other safety regulation.<br />
The contractor shall comply with the provision of all labour legislation including<br />
the latest requirements of all the Acts, Laws, any other regulations that are<br />
applicable to the execution of the project.<br />
i) Minimum Wages Act 1948 (Amended)<br />
ii) Payment of Wages Act 1936 (Amended)<br />
iii) Workmen’s Compensation Act 1923 (Amended)<br />
iv) Contract labour regulation and abolition act 1970 and central rules 1971<br />
(amended)<br />
v) Apprentice act 1961 (amended)<br />
vi) Industrial employment (standing order) Act 1946 (amended)<br />
vii) Personal injuries (compensation insurance) act 1963 and any other<br />
modifications<br />
viii) Employees’ provident fund and miscellaneous provisions Act 1952 and<br />
amendment thereof<br />
ix) Shop and establishment Act<br />
x) Any other act or enactment relating thereto and rules framed there under<br />
from time to time<br />
45.0 Accidents:<br />
The contractor shall immediately on occurrence of any accident at or about the site<br />
or in connection with in execution of the work report such accident to the Architect/<br />
Consultant. The contractor shall also such report immediately to the competent<br />
authority wherever such report is required to be lodged by the law and take<br />
appropriate actions thereof.<br />
Tender Document UBI Deva branch
36<br />
SPECIAL CONDITIONS OF CONTRACT<br />
SCOPE OF WORK: The scope of work is to carry out the <strong>INTERIOR</strong> & FURNISHING<br />
WORK AT UBI, DEVA BRANCH FOR <strong>CIVIL</strong>, <strong>INTERIOR</strong>, <strong>ELECTRICAL</strong> &<br />
<strong>ALLIED</strong> <strong>WORKS</strong>.<br />
1.0 Address of site:<br />
The site is located at at Deva branch,Deva near Nadiad.<br />
Dimensions and levels<br />
All dimensions and levels shown on the drawings shall be verified by the<br />
contractor on the site and he will be held responsible for the accuracy and<br />
maintenance of all the dimensions and the levels. Figured dimensions are in all<br />
cases to be accepted and no dimension shall be scaled. Large scale details shall<br />
take precedence over small-scale drawings. In case of discrepancy the<br />
contractor shall ask for clarification from the Architect/Consultant before<br />
proceeding with the work.<br />
2.0 Notice of operation:<br />
The contractor shall not carryout any important operation without the consent in<br />
writing from the Architect/Consultant.<br />
3.0 Construction records:<br />
The contractor shall keep and provide to the Architect/Consultant full and<br />
accurate records of the dimensions and positions of all new work and any other<br />
information necessary to prepare complete drawings recording details of the<br />
work as constructed.<br />
4.0 Safety of adjacent structures and trees<br />
The contractor shall provide and erect to the approval of the Architect/<br />
Consultant such supports as may be required to protect effectively all structures<br />
and protective guards to trees which may be endangered by the execution of the<br />
works or otherwise take such permanent measures as may be required by the<br />
Architect to protect the trees and structures.<br />
Tender Document UBI Deva branch
5.0 Temporary works:<br />
37<br />
Before any temporary works are commenced the contractor shall submit at least<br />
7 days in advance to the Architect/Consultant for approval complete of all<br />
temporary works he may require for the execution of the works. The contractor<br />
shall carry out the modifications relating to strength, if required by the<br />
Architect/Consultant may require in accordance with the conditions of contract at<br />
his own cost. The contractor shall be solely responsible for the stability and<br />
safety of all temporary works and unfinished works and for the quality of the<br />
permanent works resulting from the arrangement eventually adopted for their<br />
execution.<br />
6.0 Temporary roads<br />
The contractor shall provide access road to the site from the nearest main road<br />
at no extra cost and as directed by the Architect/Consultant. The contractor shall<br />
also responsible for proper maintenance of this access road and would take all<br />
care to see that existing services, if any, are maintained in working order at his<br />
own cost. The laying and maintaining the temporary roads within the site area<br />
shall be the contractor’s responsibility and the contractor shall take such<br />
measures that are necessary and as directed by the Architect/Consultant.<br />
7.0 Water, power, and other facilities:<br />
a) The rate quoted by the contractor shall include all expenses that are required for<br />
providing all the water required for the work and the contractor shall make his<br />
own arrangements for the supply of good quality water suitable for the<br />
construction and good quality drinking water for their workers. If necessary The<br />
contractor has to sink a tube well/ open well and bring water by means of tankers<br />
at his own cost for the purpose. The UBI will not be liable to pay any charges in<br />
connection with the above.<br />
b) The rate quoted in the tender shall include the expenses for obtaining and<br />
maintaining power connections and shall pay for the consumption charges.<br />
c) The contractors for other trades directly appointed by the UBI shall be entitled to<br />
take power and water connections from the temporary water and power supply<br />
obtained by the contractor. However the concerned contractor shall make their<br />
own arrangements to draw the supply and pay directly the actual consumption<br />
charges at mutually agreed rates between them. All municipal charges for<br />
drainage and water connections for construction purposes shall be borne by the<br />
contractor and charges payable for permanent connections, if any, shall be<br />
initially paid by the contractor and the UBI will reimburses the amount on<br />
production of receipts.<br />
d) The UBI as well as the Architect/ Consultant shall give all possible assistance to<br />
the contractors to obtain the requisite. Permission from the various authorities,<br />
but the responsibility for obtaining the same in time shall be of the contractor.<br />
Tender Document UBI Deva branch
8.0 Office accommodation<br />
a) The contractors shall provide and maintain all necessary offices, workshops,<br />
stores, shelters, sanitary facilities, canteens and other temporary structures for<br />
themselves in connections with the work at the site at their own cost after getting<br />
the approval from the Architect/ Consultant.<br />
b) A site office for the use of UBI/ the Architect/ Consultant shall be provided by the<br />
contractors at his own expenses.<br />
c) All temporary buildings and facilities as mentioned above shall be removed on<br />
completion of the work or at any other earlier date as directed by the contractors.<br />
38<br />
All the expenses for obtaining statutory approvals and maintenance of the above<br />
facilities as wall as running expenses shall be borne by the contractor at no extra<br />
cost. It is also the responsibility of the contractor to obtain statutory approvals for<br />
providing the above facilities<br />
9.0 Facilities for Contractor’s employees:<br />
The contractor shall make his own arrangement for the housing and welfare of<br />
his staff and workmen including adequate drinking water facilities. The contractor<br />
shall also make the arrangement at his own cost for transport where necessary<br />
for his staff and workmen to and from site of work at his own cost.<br />
10.0 Lighting of works:<br />
The contractors shall at all times provide adequate and approved lighting as<br />
required for the proper execution and supervision and inspection of work.<br />
11.0 Fire fighting arrangements:<br />
i) The contractor shall provide suitable arrangement for fire fighting at his own cost.<br />
For this purpose he shall provide requisite number of fire extinguishers and<br />
adequate number of buckets, some of which are to be always kept filled with<br />
sand and some with water. These equipments shall be provided at suitable<br />
prominent and easily accessible places and shall be properly maintained.<br />
ii) Any deficiency in the fire safety or unsafe conditions shall be corrected the<br />
contractor at his own cost and to the approval of the relevant authorities. The<br />
contractor shall make the following arrangements at his own cost but not limited<br />
to the following.<br />
a) Proper handling, storage and disposal of combustible materials and waste.<br />
b) Work operations which can create fire hazards<br />
.<br />
c) Access for fire fighting equipments.<br />
d) Type, number and location of containers for the removal of surplus materials and<br />
rubbish.<br />
Tender Document UBI Deva branch
e) Type, size, number and location of fire extinguishers or other fire fighting<br />
equipments.<br />
f) General house keeping.<br />
12.0 Site order book:<br />
39<br />
The Site order book shall be maintained at the site for the purpose of quick<br />
communication with the Architect/ Consultant. Any communication relating to the<br />
works may be conveyed through records in the site order book. Such a<br />
communication from one party to the other shall be deemed to have been<br />
adequately served in terms of contract. Each site order book shall have machine<br />
numbered pages in triplicates and shall carefully maintained and preserved by<br />
the contractor and shall be made available to the Architect/ Consultant as an<br />
when demanded. Any instructions which the Architect/ Consultant may like to<br />
issue to the contactor or the contractors may like to bring to the Architect/<br />
Consultant Two copies of such instructions shall be taken from the site order<br />
book and one copy will be handed over to the party against proper<br />
acknowledgement and the second copy will be retained for their record.<br />
13.0 Temporary fencing/ barricading<br />
The contactor shall provide and maintain a suitable temporary fencing/<br />
barricading and gates at his cost to adequately enclose all boundaries of the site<br />
for the protection of the public and for the proper execution and security of the<br />
work and in accordance with the requirement of the Architect/ Consultant and<br />
regulations of local authorities. These shall be altered, relocated and adopted<br />
from time to time as necessary and removed on completion of the work.<br />
14.0 Site meetings:<br />
Site meetings will be held to review the progress and quality evaluation. The<br />
contactor shall depute a senior representative along with the site representative<br />
and other staff of approved sub-contractors and suppliers as required to the site<br />
meetings and ensure all follow up actions. Any additional review meetings shall<br />
be held if required by the Architect/ Consultant.<br />
15.0 Disposal of refuse:<br />
The contactor shall cart away all debris, refuse etc. arising from the work from<br />
the site and deposited the same as directed by the Architect/ Consultant at his<br />
own cost. It is the responsibility of the contactor to obtain approval from the local<br />
authorities concerned to the effect that all rubbish arising out of contractor’s<br />
activities at the construction site or any other site activities borrow pits has been<br />
properly disposed off.<br />
Tender Document UBI Deva branch
40<br />
16.0 Contractor to verify site Measurements:<br />
The contractor shall check and verify all site measurements wherever requested<br />
by other specialist contractors or other sub-contractors to enable them to prepare<br />
their own shop drawings and pass on the information with sufficient promptness<br />
as will not in any way delay the works.<br />
17.0 Displaying the name of the work:<br />
The contractor shall put up a name board of suitable size as directed by the<br />
Architect/ Consultant indicating the name of the project and other details as<br />
given by the Architect/ Consultant at his own cost and remove the same on<br />
completion of work.<br />
18.0 Bar bending schedule:<br />
The contractor shall prepare a detailed bar bending schedule for all reinforced<br />
concrete works and got them approved by the Architect/ Consultant well in<br />
advance.<br />
19.0 As built drawings:<br />
i) For the drawings issued to the contractor by the Architect/ Consultant. The<br />
Architect/ Consultant will issue two sets of drawings to the contractor for the<br />
items for which some changes have been made from the approved drawings<br />
as instructed by the UBI/ the Architect/ Consultant. The contractor will make<br />
the changes made on these copies and return these copies to the Architect/<br />
Consultant for their approval. In case any revision is required or the<br />
corrections are not properly marked, the Architect/ Consultant will point out<br />
the discrepancies to the contractor. The contractor will have to incorporate<br />
these corrections and/or attend to discrepancies either on the copies as<br />
directed by the Architect/ Consultant and resubmit to him for approval. The<br />
Architect/ Consultant will return one copy duly approved by him.<br />
ii) For the drawings prepared by the contractor,<br />
The contractor will modify the drawings prepared by him wherever the<br />
changes are made by the UBI/ the Architect/ Consultant and submit two<br />
copies of such modified drawings to the Architect/ Consultant for approval.<br />
The Architect/ Consultant will return one copy of the approved drawing to the<br />
contractor.<br />
20.0 Approved make:<br />
The contractor shall provide all materials from the list of approved makes at his<br />
own cost and also appoint the specialized agency for the waterproofing, antitermite,<br />
aluminum doors and windows and any other items as specified in the<br />
tender. The Architect/ Consultant may approve any make/ agency within the<br />
approved list as given in the tender after inspection of the sample/ mock up.<br />
Tender Document UBI Deva branch
21.0 Procurement of materials:<br />
The contractor shall make his own arrangement to procure all the required<br />
materials for the work. All wastages and losses in weight shall be to the<br />
contractor’s account.<br />
22.0 Excise duty, Taxes, Levies etc.<br />
The contractor shall pay and be responsible for payment of all taxes, duties,<br />
levies, royalties, fees, cess or charges in respect of the works including but not<br />
limited to sale taxes, tax on works contract excise duty, service tax, octroi, etc.<br />
payable in respect of material, equipments plant and other things required for the<br />
contract. All the aforesaid taxes, duties, levies, fees and charges shall be to the<br />
contractor’s account and the UBI shall not be required to pay any additional or<br />
extra amount on this account. Variation of taxes, duties, levies, etc. if any, till<br />
completion of work shall be deemed to be included in the quoted rates and no<br />
extra claim on this account will in any case be entertained. If a new tax or duty or<br />
levy or cess or royalty or octroi is imposed under as statue or law during the<br />
currency of the contract/work the same shall be borne by the contractor.<br />
23.0 Acceptance of tender:<br />
The UBI shall have the right to reject any or all tenders without assigning any<br />
reason. They are not bound to accept the lowest or any tender and the tenderer<br />
or tenderers shall have no right to question the acts of the UBI. However<br />
adequate transparency would be maintained by the UBI.<br />
24.0 Defects after virtual completion and defects liability period:<br />
41<br />
Any defect, shrinkage, settlement or other faults which may appear within the<br />
“Defects Liability Period” which shall be twelve months from the date of the<br />
virtual completion of the works, arising in the opinion of the Architect from<br />
materials or workmanship not in accordance with the Contract, shall upon the<br />
direction in writing of the Architect, and within such reasonable time as shall be<br />
specified therein, be amended and made good by the Contractor, at his own cost<br />
and in case of default then Bank may employ and pay other person/ agency to<br />
amend and make good such defects, shrinkage, settlement or other faults, and<br />
all damages, loss and expenses consequent thereon or incidental thereto shall<br />
be made good and borne by the Contractor and such damage, loss and<br />
expenses shall be recoverable from him by the Bank or may be deducted by the<br />
Bank, upon the Architect’s certificate in writing, from any money due or that may<br />
become due to the Contractor, or the Bank may in lieu of such amending and<br />
marking good by the Contractor deduct from any money due to the Contractor a<br />
sum, to be determined by the Architect equivalent to the cost of amending such<br />
work and in the event of the amount retained under clause 1 of GCC hereof<br />
being insufficient, recover the balance from the Contractor, together with any<br />
expenses the Bank may have incurred in connection therewith. Should any<br />
defective work have been done or material supplied by any Sub-Contractor<br />
employed on the works, who has been nominated or approved by the Architect<br />
as provided in Clauses 15 of GCC the contractor shall be liable to make good in<br />
the same manner as if such work or material has been done or supplied by the<br />
Contractor and been subject to the provisions of this Contract. The Contractor<br />
Tender Document UBI Deva branch
42<br />
shall remain liable under the provisions of this Contract not withstanding the<br />
signing of any Certificate or the passing of any accounts, by the Architect,<br />
25.0 ANTI-TERMITE TREATMENT AND WATER PROOFING TREATMENT:<br />
25.1 Pre-construction soil treatment shall be carried out in co-ordination with the<br />
building work and shall be executed in such a manner that the civil works are not<br />
hampered or delayed by the anti-termite treatment. The treatment shall be carried<br />
out as detailed in IS: 6313 (Part III) latest revision. The water proofing treatment<br />
shall be type and specification as given in the schedule of quantities. The antitermite<br />
and water proofing treatment shall be got done through specialized<br />
agencies only.<br />
25.2 The treatment against water-proofing of basement, roofs, water retaining area<br />
and termite infestation shall be and remain fully effective for a period of not less<br />
than 10 (ten) years to be reckoned from the date of expiring of the defect liability<br />
period , prescribed in the contract.<br />
25.3 The UBI reserves the right to get the quality of treatment checked in accordance<br />
with recognize test methods and in case it is found that the chemicals with the<br />
required concentration and rate of application have not been applied, or the water<br />
proof treatment is done as per specifications, the contractor will be required to do<br />
the re-treatment in accordance with the required concentration & specifications at<br />
no extra cost failing which no payment for such work will be made. The extent of<br />
work thus rejected shall be determined by the Architect.<br />
25.4 Water proofing and anti-termite termite treatment shall be got done through<br />
approved and specialized agencies only.<br />
25.5 The contractor shall make such arrangement as may be necessary to safe guard<br />
the workers and residents of the building against any poisonous effect of the<br />
chemicals used during the execution of the work.<br />
25.6 The contractor whose tender is accepted shall execute Free Maintenance<br />
Guarantee agreement Bond in the prescribed form as appended for guaranteeing<br />
the anti-termite and water proofing treatment.<br />
26.0 During the execution of work, if any damage shall occur to the works already<br />
done, either due to rain or any other circumstances, the same shall be rectified<br />
and made good to the entire satisfaction of the Architect/Consultant by the<br />
contractor at his costs and risks.<br />
27.0 Testing of Material’s etc.:<br />
The contractor at his own cost (without any extra cost to the Bank) shall arrange<br />
for the laboratory and/or field testing of materials and works as required by the<br />
architects/Bank.<br />
Tender Document UBI Deva branch
OF OIL BASE CEMENT PRIMER SHALL BE APPLIED. UNWANTED ELEMENTS,<br />
Tender Document UBI Deva branch<br />
43<br />
TECHNICAL SPECIFICATIONS OF <strong>CIVIL</strong> WORK<br />
1.0 GYPSUM FALSECEILING<br />
Providing and fixing Suspended ceiling which includes G. I. Perimeter Channels<br />
of size 0.55mm thick having one flange of 20mm and another flange of 30mm<br />
and we web 27mm along with perimeter of ceiling, screw fixed to brick wall /<br />
partitions with the help of nylon sleeves and screws, at 610mm centers. Then<br />
suspending G. I. intermediate channel of size 45mm, 0.9mm thick with two<br />
flanges of 15mm each from the soffit at 1220mm centers with ceiling angle of<br />
width 25mm x 10mm x 0.55mm thick fixed to soffit with G. I. cleat and steel<br />
expansion fasteners. Ceiling section of 0.55mm thickness having knurled web of<br />
51.5mm and two flanges of 26mm each with lips of 10.5mm are then fixed to<br />
intermediate channel with the help of connecting clip and in direction<br />
perpendicular to the intermediate channel at 457mm centres. 12.5mm gypsum<br />
Board (conforming to IS: 2095 – 1982 & 2542 - 1981) is then screw fixed to<br />
ceiling section with 25mm dry wall screwed at 230mm centres. Screw fixing is<br />
done mechanically either with screw driver or drilling machine with suitable<br />
attachment. Finally the boards are to be jointed and finished so as to have a<br />
flush look which includes filling and finishing the edges of the boards with jointing<br />
compound, Joint paper tape and two coats of Drywall top coat suitable for<br />
Gypsum Board. Cutouts For light fittings, grill diffusers shall be made. Cost<br />
should also include wooden trap door made of ply with necessary frame work<br />
with paint finish for A.C. indoor units as instructed in AC drawing etc., . No<br />
deduction of above account will be made from the measurement if cut out area is<br />
less than 0.3 Sqm. All work to be carried out as per the detail drawings and<br />
instructions of engineer in charge<br />
2.0 All materials to be as per manufacturer’s specifications and relevant ISI<br />
specifications<br />
3.0 PAINTING WORK INSIDE (ACRYLIC PAINT )<br />
Supplying and painting the wall with Acrylic emulsion paint of M/s. Berger<br />
paints/M/s. Asian Paint/M/s. ICI brand or equivalent in any shades and colour as<br />
directed including cleaning and preparation of the surface, any height with all labour<br />
and material etc. Including removal/scraping of existing paint / surface preparation,<br />
application of one coat of putty and primer and minimum 2 coats of paint complete.<br />
Minimum two or more coats to be applied with roller finish. cost of primer-putty<br />
included.<br />
4.0 P & A ACRYLIC DISTEMBER PAINT<br />
P & A TWO & MORE COATS OF ACRYLIC DISTEMPER PAINT ON EXISTING & NEW<br />
WALL FRONT BY ROLLER, AT ALL LEVELS WITH FULL LAPI / PUTTI / PRIMAR COATS AS<br />
REQUIRED (THE RATE SHALL INCLUDE FOR ALL LADDERS SCAFFOLDINGS AND<br />
SUPPORTS) FOLLOWING THE MANUFACTURERS SPECIFICATION. THE OLD PAINT HAS<br />
TO BE REMOVED / SCRAPED PROPERLY. THE SURFACE SHALL BE THROUGHLY<br />
CLEANED, DRIED AND MADE FREE OF ALL LOOSE DIRT, CHALK, GREASE, FUNGUS AND<br />
ALAGE, WAX OR FLANKING PAINT. THE COMPLETE SURFACE PREPARATION SHALL BE<br />
DONE BY FILLING THE SMALLER CRACKS BY PLASTER OF PARIS & THE LARGER<br />
CRACKS, BY WHITE CEMENT. THE PLASTER HAS TO BE DONE WHERE LARGER<br />
PATCHES ARE REQUIRED TO TOUCH UP. ON ENTIRE PLAIN SURFACE, AND ONE COAT
44<br />
HARDWARES, CLAMPS ETC. SHALL BE REMOVED TO MAKE SURFACE CLEAN. MINIMUM<br />
TWO OR MORE COATS OF THE LAPI / PUTTI SHALL BE APPLIED TO GET EVEN SURFACE<br />
IN ENTIRE LINE & LEVEL. FINALLY 2 OR MORE COATS OF DISTEMBER PAINT SHALL BE<br />
APPLIED OF SUGGESTED SHADE TO BE APPLIED WITH ROLLER FINISH AND FINISH TO<br />
GET THE EVEN AND SATISFACTORY RESULT, THROUGHOUT THE WORK. THE AREA FOR<br />
THE LIGHT FIXTURES, A.C. DIFFUSERS, COLUMNS ETC. WILL NOT BE CONSIDERED FOR<br />
THE MEASUREMENT PURPOSE. ALL THE UNWANTED ELEMENTS SHALL BE REMOVED<br />
FROM THE CEILING, WALL ETC. ONLY ONSITE EXECUTED AREA WILL BE CONSIDERED<br />
FOR TE MEASUREMENT PURPOSE<br />
5.0 P & A SATIN FINISH ENAMEL PAINT<br />
P & A TWO & MORE COATS OF ENAMEL PAINT (SATIN FINISH) ON<br />
EXISTING WINDOWS / GRILLS ETC. BY BRUSH, AT ALL LEVELS WITH FULL LAPI<br />
COAT (THE RATE SHALL INCLUDE FOR ALL LADDERS SCAFFOLDINGS AND<br />
SUPPORTS) FOLLOWING THE MANUFACTURERS SPECIFICATION. THE OLD<br />
PAINT HAS TO BE REMOVED / SCRAPED PROPERLY. THE SURFACE SHALL BE<br />
THROUGHLY CLEANED, DRIED AND MADE FREE OF ALL LOOSE DIRT, CHALK,<br />
GREASE, FUNGUS AND ALAGE, WAX OR FLANKING PAINT. THE<br />
COMPLETESURFACE PREPARATION SHALL BE DONE BY FILLING THE<br />
SMALLER / LARGER CRACKS, BY PUTTI PROPERLY. FOR STEEL ELEMENTS,<br />
THE REQUIRED COATS OF RED OXIDE SHALL BE APPLIED FOR PUTTING THE<br />
PAINT. AND FINALLY 2 OR MORE COATS OF ENAMEL PAINT SHALL BE APPLIED<br />
OF SUGGESTED SHADE AND FINISH TO GET THE EVEN AND SATISFACTORY<br />
RESULT, THROUGHOUT THE WORK. FOR EACH ITEM THE MODE OF<br />
MEASUREMENT WILL CONSIDERED SEPRATELY. ONLY ONSITE EXECUTED<br />
AREA WILL BE CONSIDERED FOR MEASUREMENT PURPOSE.<br />
5.0 Vitrified Flooring<br />
PROVIDING & LAYING 1 ST QUALITY, PLAIN COLORED GRANAMITE TILES IN<br />
FLOORING OF SIZE 2’ X 2’, IN SHADE AS MENTIONED. IT SHOULD BE PROVIDED IN<br />
FLOOR IN COMPLETE LINE & LEVEL (NO GRADIENT) BY PROVIDING SUFFECIENT<br />
THICKNESS (AS PER THE REQUIRMENT OF THE SITE) 30TO 45 MM C.M. 1:6 AS<br />
BEDDING MATERIAL OR BY PUTTING TILE FIXING CHEMICALS OF MINIMUM 6 MM<br />
THICKNESS ON THE EXISTING FLOOR AS PER THE SITE CONDITION & BANK’S<br />
DECISION. THE JOB INCLUDES JOINT FINISHING WITH THE HELP OF WHITE<br />
CEMENT, CEMENT COLOR, WITH JOINT FILLER OF APPROVED MAKE, CLEANING<br />
ETC. COMPLETE. THE SHADE, DESIGN, THICKNESS AND SIZE OF THE TILES<br />
SHOULD BE UNIFORM. THE TILES ARE TO BE FIXED IN SUGGESTED PATTERN,<br />
JOINED WITH SUGGESTED COLOR CEMENT SLURRY IN JOINTS. PROPER FIXING<br />
LEVEL SHOULD BE MAINTAINED. FULL PIECES HAVE TO BE FIXED EXCEPT WHERE<br />
SMALL PIECES ARE NECESSARY. SMALL PIECES ARE TO BE AVOIDED AS FAR AS<br />
POSSIBLE. THE JOB INCLUDES FIXING WHITE TAP ON JOINTS OF THE TILES,<br />
LAYING 3 MM THICK FLOOR BUBBLE GUARD AFTER LAYING THE TILES AND<br />
REMOVING THE SAME AFTER COMPLETION OF THE ENTIRE WORK INCLUDING ALL<br />
OTHER AGENCIE’S WORK. ACTUAL ON SITE LAID QUANTITY WILL BE CONSIDERED<br />
FOR THE MEASUREMENT PURPOSE. 10 % COLOURED TILES FOR DESIGN SHALL<br />
BE CONSIDERED IN THE TOTAL QUANTITY.<br />
Tender Document UBI Deva branch
TECHNICAL SPECIFICATIONS FOR FURNITURE WORK<br />
45<br />
Unless otherwise mentioned in item description / bill of quantities/drawings and / or<br />
instructed by architects/Engineer following specifications shall be adopted All works to be<br />
carried as per detail drawing and instructions of Architect/Engineer in-charge.<br />
A) Materials<br />
1) Plywood: - IS 303 Commercial Grade Plywood of approved make.<br />
2)<br />
3) Laminate : Make IS:2046 As selected by the architect from the approved Make<br />
.Thickness not less than 1mm<br />
4) Wood:<br />
a) Teak or Sycamore or equivalent to match with laminate with melamine polish.<br />
Sample of Wood and Polish to be got approved.<br />
b) Concealed wood members of Sal wood/Kapur Wood of approved Sample<br />
c) All Wood members to be given pre construction anti termite treatment with<br />
Biflex TC chemical in proportion 1:24 (biflex:kerosene oil ) in 2 coats<br />
d) Inside wood members and concealed / inner side ply wood in double skin<br />
partition need not be provided with primer and painting.<br />
e) All portion of wood and ply which are not directly exposed to be provided with<br />
one coat of primer and two or more coats of synthetic enamel paint of approved<br />
Shade.<br />
4) GLASS<br />
Glass shall be Modi Float /Sant Gobian make in required shape ,size and thickness<br />
with cut outs, itching,film etc as per specifications and drawings and instructions .All<br />
exposed edges shall be rounded and diamond polished<br />
5) Other Materials:<br />
Approved sample Such as hardware, locks, channels, cable manager<br />
When ever required and asked) from list of approved make contained<br />
in tender document<br />
B) Modesty Panel.<br />
19mm ply with 1mm laminate or powder coated MS perforated sheet of 21 gauge or<br />
a combination of both.<br />
Tender Document UBI Deva branch
C) WORKING TOPS<br />
Working top made out of 19mm thick ply and finished with 1mm thick laminate on<br />
top. All exposed edges with wood beading with Laminate finish or Melamine polish as<br />
per drawings & instruction of architect/ Engineer in-charge.<br />
Supporting leg on either side of table to be of 19mm thick ply finished with laminate as<br />
per design and as required<br />
Cable manager to be provided over all independent work tops for conducting cable<br />
network below the work surface .This is to be made up of suitable engineering plastic<br />
of 55/60mm diameter.<br />
D) Drawer UNIT<br />
a) Outer case in ply wood with bottom skirting .Front, Bottom, Side and Back in<br />
19mm thk Ply. Top of Outer Case Shall be Top of the Table /Working Top.<br />
46<br />
b) Drawers: Sides and back of Drawers Shall be 12mm and bottom of 6mm.All<br />
exposed surfaces to be provided with 1mm thick laminate.<br />
c) Group Lock, Sliding Channels, handles, hinges as per approved sample.<br />
E) SIDE UNIT.<br />
SIDE UNIT with sliding /operable shutters including adjustable shelves, bottom skirting<br />
all made of 19mmhtk ply with laminate finish<br />
The storage will be provided with handles, locks, channels, Self Closing hinges etc<br />
complete with all hard wares and workmanship.<br />
F) STORAGE<br />
Outer case including shutters made out of 19mm plywood finished with laminate<br />
including adjustable shelves facility and bottom skirting<br />
The storage will be provided with handles, locks, Self Closing hinges etc. Complete<br />
with all hard wares and workmanship.<br />
G) KEY BOARD TRAYS, CPU HANGER.<br />
Ebco or approved equivalent – Powder coated CRCA Keyboard trays and CPU hanger<br />
shall be provided below the work tops at specified locations with facility of channel<br />
sliding arrangement.<br />
H) PARTITIONS HALF HEIGHT<br />
Half Height Partition up to 5' 3" ht. & 4' 0" ht.<br />
Providing and fixing on site in required position Half height partition of height as shown<br />
on drawing<br />
Frame work made out of hard wood (Sal) sections of ready size 50mmx50mm treated<br />
with anti termite treatment and internal sections of size 38mm x 50 mm with spacing<br />
not more than 600 mm c/c both ways or as per detailed drawing.<br />
Framing with proper half notch joint between the horizontal and vertical members and<br />
lap joint between two straight members with proper fixing, to be covered with 6mm ply<br />
of approved make on either side so as to make a composite partition thickness of<br />
62mm.<br />
All exposed edges of the partition to have laminate finish or 12x 75mm half round<br />
sycamore or matching wood beading.<br />
Tender Document UBI Deva branch
Partition shall be finished in 1.0mmthk laminate of approved shade make and design<br />
fixed with Fevicol (SR99) and mild steel nails and supports as required for adequate<br />
strength with and 10mm thk float glass panel with film /acid milky etching and fixed<br />
with SS D brackets or sycamore beading as per detailed drawings.<br />
Soft board covered with fabric shall be provided as per design, drawings,<br />
specifications and instruction of architect and engineer in charge.<br />
47<br />
I) Full Height Partition 8'-6" Ht OR Up to false ceiling<br />
Providing and fixing on site in required position Full height partition of height as shown on<br />
drawing made out Hard wood ( Sal)sections of full size 50mmx50mm treated with anti<br />
termite treatment space at 600 mm horizontally and vertically/c with proper half notch joint<br />
between the horizontal and vertical members and lap joint between two straight members<br />
with proper fixing, to be covered with 6mm ply of approved make on either side so as to<br />
make a composite partition thickness of 62mm. All exposed periphery of the parttion to<br />
have 12x75mm matching wood moulding with half round on both sides fixed to the partition.<br />
Partition shall be finished in 1.0mm laminate of approved shade ,make and design fixed<br />
with Fevicol (SR99) and mild steel nails and supports as required for adequate strength<br />
with 10mm thk glass panel (modi or saintgoban glass panel)and fixed with rubberwood<br />
beading as directed on site and shown on drawing. Glass panel shall be acid milky / flim<br />
with matching shade and soft board coverd with fabric as indicated in drawing.The ply<br />
boxes shall have laminate finish as specified in detail drawings. All vertical members are to<br />
be taken upto roof level and fixed to roof suitably.(Note: partition height is measured upto<br />
false ceiling and paid.)<br />
J) SOFA<br />
Wooden Frame: Framing of Sofa is made of BTC & CP combined together. Seat: Vertical &<br />
Horizontal BTC wood supports - 50mm X 38mm. Back : Vertical & Horizontal CP wood<br />
supports - 50mm X 38mm. Arms : 100mm X 38mm CP wood shaped & champered as per<br />
design. Main Frame: Front Support in Seat - 100mm X 38mmX4mm Water proof Ply on<br />
Sides of the anns & Back Rest. Which helps shaping of the anns & fabric stitching in Seat<br />
with thickness of 2mm (Width - 55mm, Maximum Strech 75% ) above all 4" 40 Density<br />
Foam + 1" 40 Density Foam in Seat, 2" 28 density Foam + I" 32 density Foam in Back.<br />
Base will be fixed 15mm 28 density foam fixing with SR 505 Solution ( A branded Product<br />
of Pidilite Industries.). Cloth belt in back with thickness of 2mm -& Width-- 5Smm, above all<br />
2" 40 density foam + 1" 40 density foam in back. Elastic belt & Hassien cloth will be fixed<br />
on the wooden frame with Hippo Tekas. Hippo nails for fixing hassien cloth & belts. Sofa<br />
Legs : SS Finish Crome legs / wooden Legs of any colour as per require.(THREE SEATS<br />
OR AS APPROVED BY ARCHITECT).<br />
K) DOORS<br />
1)FULLY GLAZED DOOR with door closer<br />
Sycamore /wooden section used in shutter frames. Wood shall have melamine finish/or<br />
laminate finish. 8/10MM frosted/Plain glass shall be fixed with help of wooden beading.<br />
Complete with all hardwares such as handle (Ss finish with Locking arrangement -godrej<br />
make.) Cost should also include door closures OR floor spring with door frame of 50x 75mm<br />
Of approved wooden section with melamine polish<br />
2) Flush Doors with view panel.<br />
Flush Doors with view panel Including door closures, (U.P.S., Server). 35 MM thick<br />
waterproof flush doors "(303 Commercial ply GREENPLY/KITPLY GOLD/ROYAL/CENTURY<br />
Tender Document UBI Deva branch
48<br />
or equivalent)” or equivalent to be supplied. Complete with all hardware’s and workmanship.<br />
Both side of the door shall be finished in 1mm thk laminate fixed. Item to include all<br />
hardware such as handle (s.s finish with locking arrangement-Godrej make). Cost should<br />
also include door closures with door frame of 50x 75mm of approved wooden section with<br />
melamine polish Complete. Frosted or plain glass to be used where ever asked by the<br />
architect.<br />
3) Door for Main Entry<br />
Providing & fixing Aluminum colour anodised glazed shutters (framed), door frame and fixed<br />
panels for front entrance door as per drawing, confirming to IS 1949, made out of anodized<br />
Aluminum sections shall be of 1.5 mm thickness. The glass shall be fixed in EPDM rubber &<br />
Door shall have good quality concealed type locking arrangement & Handle with same<br />
colour anodized. Aluminum section, shall have an aluminum color anodizing of 15 microns<br />
thickness in matt finish. The aluminum section shall be of good quality JINDAL or equivalent<br />
standard sections, and 12mm thick toughened Modi/Saint Goban floated glass for panels.<br />
The rate includes cost of all material & labour and includes cost of floor spring and complete<br />
with all material, labour, tools, tackles, as / the instructions of EIC.<br />
L) Writing desk<br />
Writing desk. Providing and fixing on site writing desk made in 12mm clear glass with edge<br />
crystal polish supported on panelling behind with 18mm double ply finished with 1.0mm<br />
laminate as instructed. The front shall have 8mm thk glass fixed with S.S studs and caps for<br />
holding slips/challans.<br />
M) Aluminium composite paneling<br />
Providing and fixing 3mm thk exterior grade aluminum composite panel of size as<br />
shown in drawing on aluminium sections of 2"x 1" with necessary other sections and<br />
to be completed in all respecst with necessury fittings.The aluminium panel shall be of<br />
good quality EUROBOND, ALUDECOR or equivalent make.<br />
N ) Ply ceiling<br />
P & M Ply box ceiling above entrance to hide rolling shutter with Provision of<br />
openable trap door for servicing of rolling shutter finished with laminate as/<br />
selection, handle , hinges, lock etc com.<br />
O) Renovation of existing table.<br />
Renovation of table including new laminate, addition of new design, repairing<br />
or replacement of hardware i.e. handle, lock, channel if required, painting /<br />
polishing from inside etc complete<br />
P) CHAIRS<br />
1)STAFF CHAIRS<br />
Executive push back revolving chair, a truly life long product with out standing Functionality,<br />
waterfall contour of seat front for stress free seating . Upholstery with PU Molded Cushion<br />
at seat & back (A specially body designed injection molded cell, anatomically contoured<br />
molded thermoplast armrest, push back system & body wait adjustment with lock & unlock<br />
pneumatic system for height and handle adjustment, injection molded six legs glass filled<br />
nylon base with smooth rolling twin wheel castors.<br />
Tender Document UBI Deva branch
49<br />
2)VISITORS<br />
low back push back revolving chair a truly life long product with out standing Functionality,<br />
waterfall contour of seat front for stress free seating .Upholstery with PU Molded Cushion<br />
at seat & back, the back are protected by aesthetically Designed injection molded cell,<br />
anatomically contoured molded thermoplastic armrest, push back system & body wait<br />
adjustment with lock & unlock pneumatic system for height and handle adjustment,<br />
injection molded six legs glass filled nylon base with smooth rolling twin wheel castors.<br />
3) BM’S CHAIR<br />
Manager’s high back revolving chair, waterfall contour of seat front for stress free seating.<br />
Upholstery with PU Molded Cushion at seat & back, the back are protected by aesthetically<br />
Designed ABS cell, synchronized mechanism with body wait adjustment & lock System,<br />
pneumatic system for height and handle adjustment, Injection Molded six legs glass<br />
filled nylon base and smooth rolling twin wheel castors.<br />
Q) GYPSUM FALSE CEILING with plastic paint colour finishing complete (USING<br />
GYP STEEL SECTIONS ONLY)<br />
Providing and fixing Suspended ceiling which includes G. I. Perimeter<br />
Channels of size 0.55mm thick having one flange of 20mm and another flange of<br />
30mm and we web 27mm along with perimeter of ceiling, screw fixed to brick wall /<br />
partitions with the help of nylon sleeves and screws, at 610mm centers. Then<br />
suspending G. I. intermediate channel of size 45mm, 0.9mm thick with two flanges<br />
of 15mm each from the soffit at 1220mm centers with ceiling angle of width 25mm x<br />
10mm x 0.55mm thick fixed to soffit with G. I. cleat and steel expansion fasteners.<br />
Ceiling section of 0.55mm thickness having knurled web of 51.5mm and two flanges<br />
of 26mm each with lips of 10.5mm are then fixed to intermediate channel with the<br />
help of connecting clip and in direction perpendicular to the intermediate channel at<br />
457mm centres. 12.5mm gypsum Board (conforming to IS: 2095 – 1982 & 2542 -<br />
1981) is then screw fixed to ceiling section with 25mm dry wall screwed at 230mm<br />
centres. Screw fixing is done mechanically either with screw driver or drilling<br />
machine with suitable attachment. Finally the boards are to be jointed and finished<br />
so as to have a flush look which includes filling and finishing the edges of the boards<br />
with jointing compound, Joint paper tape and two coats of Drywall top coat suitable<br />
for Gypsum Board. Cutouts For light fittings, grill diffusers shall be made. Cost<br />
should also include wooden trap door made of ply with necessary frame work with<br />
paint finish for A.C. indoor units as instructed in AC drawing etc., . No deduction of<br />
above account will be made from the measurement if cut out area is less than 0.3<br />
Sqm. All work to be carried out as per the detail drawings and instructions of<br />
engineer in charge Rate should be include of Plastic paint with 3 coat to be<br />
applied with roller finishing complete.<br />
2.0 All materials to be as per manufacturer’s specifications and relevant ISI<br />
specifications<br />
Tender Document UBI Deva branch
TECHNICAL SPECIFICATIONS FOR ELECTRIFICATIONS<br />
50<br />
General:<br />
The scope of work covers execution and completion of the electrical installation<br />
work of the proposed Internal Electrification, Telephone network, for “UNION BANK<br />
OF INDIA DEVA BRANCH AT DEVA” in accordance with drawings & specifications<br />
and obtaining permanent power supply with all necessary statutory approvals for<br />
from the concerned Appropriate Authorities.<br />
Rules & Regulations:<br />
The installation shall be generally carried out in confirmatory with the requirements<br />
of Indian Electricity Act 2003 (as amended up to date) and the latest Indian<br />
Electricity Rules1956 and supplementary Regulations of the State Electricity<br />
Departments and Electricity Undertakings and where the installation is subject to<br />
inspection and approval of Fire Insurance and Explosives Authorities, such<br />
installation shall be planned and executed to conform to their special Rules.<br />
1.0 Point Wiring:<br />
1.1 Supply:<br />
The following material shall be included in a point wiring and accessories.<br />
a) Conduit - 20 / 25 mm dia. 1.5 mm thick PVC rigid approved conduit with<br />
accessories.<br />
b) Wires - PVC insulated copper conductor multi-stranded flexible type wires ISI<br />
mark of 1.0, 1.5, 2.5, 4.0, 6.0, 10, 16 sq.mm<br />
c) Switches and accessories (Modular Plate Type ) - 5 Amp single pole one way,<br />
two way switch, 5 amp socket, 15 Amp switch and 5/15 A socket, fan Regulators<br />
step control type (Hum free)<br />
d) Cover plates for outlet boxes - 3 mm thick Formica / Hylam sheet specially for<br />
electrical purposes.<br />
e) Hardware’s - screws and washers non rusting type brass type.<br />
f) Switch Boards and outlet Boxes - factory made boxes for flush mounting for<br />
switches and accessories and 18 SWG m.s. sheet duly red-oxide painted as outlet<br />
boxes with knock-outs for conduit entries and tapped holes for screws.<br />
g) Holders - Pendant holders / angle holders / ceiling rose etc. of Anchor make<br />
white in colour.<br />
a) Industrial Sockets - Metal clad Industrial type with its top.<br />
Tender Document UBI Deva branch
1.2 Installation :<br />
51<br />
All conduit shall be concealed in walls, beam, column, slabs or above false ceiling<br />
duly clamped with GI spacers saddles. Chases shall be made in walls to embed /<br />
conceal the conduits fully and then refilling of the chases with cement mortar and<br />
also, wherever the conduits are embedded in wall then the re-filling and finishing /<br />
covering of the chases shall be done with chicken mesh. All switch boards and<br />
outlet boxes (placed for bracket wall points) shall be embedded in walls and<br />
should be kept in line and level with help of spirit level. Fan boxes shall be provided<br />
with nut welded on top with threaded hook and check nut. Wire drawing should be<br />
done with the help of draw wire. The conduits shall be cleaned of all foreign<br />
materials before inserting the wires. Drawing of wires should be done such that the<br />
insulation of wires is not damaged. All conduits shall be tighten with check-nuts in all<br />
outlet / junction boxes and switch boxes. All ends of conduits shall be sealed<br />
properly to avoid entering cement slurry or other foreign materials inside to conduits<br />
during casting of slab / plastering of wall or during flooring.<br />
All chases / jery in wall / RCC / Flooring shall be made by machine only. Manual<br />
cutting shall not be allowed and refilling shall be done by Electrical Contractor.<br />
All works shall be done as per instruction of the Engineer-in-charge and to the<br />
satisfaction of the E.I.C.<br />
For surface conduiting wiring, the conduit, fittings, switch boards, outlet boxes,<br />
ceiling fan regulator boxes etc. shall be installed on surface exposed. Flexible<br />
conduits shall not be used for earth continuity of conductors, separate earth wire<br />
shall be provided either inside or outside the flexible conduits, which shall be<br />
connected by means of earth clips to the earth system at one end and to the<br />
equipment at the other end as per IS 3043-1987.<br />
Size of wire shall be chosen to limit Voltage drop within 3 %. Area of conductor shall<br />
be 1.0, 1.5, 2.5, 4.0 and 10.0 sq.mm copper. Generally not more than 8 to 10 points<br />
shall be wired in one circuit.<br />
All cost of material and labour shall be included while quoting and no extra<br />
payment shall be entitled.<br />
1.3 Testing :<br />
After completion of wiring, installation of switches etc., testing shall be done for<br />
insulation resistance as specified in the tender<br />
Notes : No joints shall be allowed in any wires in the conduits, all wires shall only be<br />
joined or connected at termination points. All circuits shall have individual neutrals<br />
and one neutral shall not complete the while wiring system.<br />
Circuits mains shall start from Distribution board to switch board or from Meter<br />
board to Distribution. The circuits mains includes supply and installation of two nos.<br />
Tender Document UBI Deva branch
52<br />
of wires with earth wire for single phase mains and Four nos. of wires with earth wire<br />
for three phase mains.<br />
2.1 Supply :<br />
a) Conduit - 20 / 25 mm dia 1.5 mm thick PVC rigid approved conduit with<br />
accessories.<br />
b) Wires - PVC insulated copper conductor multi-stranded flexible type wires ISI<br />
mark of 1.0, 1.5, 2.5, 4.0, 6.0, 10, 16 sq.mm<br />
c) All cost of material and labour should be included when quoting and no extra<br />
payment shall be entitled.<br />
2.2 Installation :<br />
a) All conduit shall be concealed in walls, beam, column, slabs or above false<br />
ceiling duly clamped with GI spacers saddles. Chases shall be made in walls to<br />
conceal the conduits and then refilling of the chases with cement mortar and also,<br />
wherever more then two conduits are embedded in wall then the refilling and<br />
finishing of the chases shall be done with chicken mesh. All switch boards and<br />
outlet boxes (placed for bracket wall points) shall be embedded / concealed in<br />
walls and should be kept in line and level with help of spirit level. Fan boxes shall be<br />
provided with nut welded on top with threaded hook and check nut. Wire drawing<br />
should be done with the help of draw wire. The conduits shall be cleaned of all<br />
foreign materials before inserting the wires. Drawing of wires should be done such<br />
that the insulation of wires is not damaged. All conduits shall be tighten with checknuts<br />
in all outlet / junction boxes and switch boxes. All ends of conduits shall be<br />
sealed properly to avoid entering cement slurry or other foreign materials inside to<br />
conduits during casting of slab / plastering of wall or during flooring.<br />
b) For surface conduiting wiring, the conduit, fittings, switch boards, outlet boxes,<br />
ceiling fan regulator boxes etc. shall be installed surface exposed. Flexible conduits<br />
shall not be used for earth continuity conductors. Separate earth wire shall be<br />
provided either inside or outside the flexible conduits, which shall be connected by<br />
means of earth clips to the earth system at one end and to the equipment at the<br />
other end as per IS 3043-1987.<br />
c) Wires shall be drawn in conduit after cleaning of conduits and drawn with the<br />
help of draw wires. No damage to the insulation of wires should be done while<br />
drawing.<br />
All chases / jery in wall / RCC / Flooring shall be made by machine only. Manual<br />
cutting shall not be allowed and refilling shall be done by Electrical Contractor.<br />
Tender Document UBI Deva branch
53<br />
2.3 Testing :<br />
After completion of wiring, installation of switches etc, testing shall be done for<br />
insulation resistance as specified in the tender<br />
3.0 Distribution Boards :<br />
3.1 Supply:<br />
Distribution boards (DB) shall be of sheet metal with rated bus bars, factory made.<br />
They shall be for three-phase or single phase distribution system as per the<br />
requirements or schedule of quantities.<br />
3.2 Installation :<br />
The distribution board shall be embedded / concealed in wall, flush mounted or<br />
surface mounted and should be in line and level. These shall be factory tested.<br />
Final MCBs on sub circuits shall be marked by permanent markers on the DB door.<br />
3.3 Test :<br />
After installation of MCBs, it shall be tested.<br />
4.0 M.C.B & ELMCB / RCCB.<br />
4.1 Supply :<br />
MCB : These shall be SP,SPN,TP or TPN as specified in B.O.Q. Rating of 2A, 6A, 16A,<br />
25A, 30A, 63A, 10KA fault level, as per IS-8828-1978; BS 3871-part.I<br />
.<br />
ELMCB / RCCB : These shall be of SPN, TPN and specified in B.O.Q. of rated value.<br />
ELMCB / RCCB - BS-4293 neutral advance feature at closing neutral will be first to<br />
contact at the time of opening neutral breaks last after allowing the phases to<br />
open first. Since the ELMCB is to be used as main switch, it shall have safe<br />
interrupting clearance as per IEC 408 / IS 4064. The ELMCB shall have terminals to<br />
terminate aluminum conductor up to 25 mm2. The ELMCB / RCCB shall have<br />
sensitivity of 30 - 300 mA. as per requirements<br />
4.2 Installation :<br />
All ELMCB / RCCB and MCBs shall be installed in the DB on din rail provided in the<br />
DB, spares shall be blocked by blank plates.<br />
4.3 Testing :<br />
All ELMCB / RCCB should be tested for overloading, short circuit, earth leakage<br />
tripping and MCBs should be tested for overloading and short circuit tripping.<br />
5.0 Material :<br />
All materials, fittings and appliances used in the electrical installation shall be of the<br />
best quality and brand new of approved manufacturer and shall conform to the<br />
latest Indian Standard Specifications, wherever these exist.<br />
Tender Document UBI Deva branch
54<br />
6.0 Workmanship :<br />
Good workmanship and neat appearance are the prerequisites for compliance<br />
with the various sections of these specifications. The work shall be carried out under<br />
direct supervision of a person holding Certificate of Competency issued by the<br />
State Government and in accordance with the statutory rules and regulations in<br />
force. The relevant ISI code of practice shall be followed wherever applicable.<br />
7.0 Drawing :<br />
Four sets of all relevant electrical drawings and specifications shall be furnished by<br />
Client to the Contractor for his own use until the completion of the contract which<br />
shall be accessible at all reasonable times to the Engineer-in-Charge or their<br />
representatives. the tender drawings shall indicate only the general scheme of<br />
requirements. Exact position of all point, controls, switch boxes and inspection<br />
boxes, main and sub-distribution boards etc. shall be got approved by the<br />
Engineer-in-Charge before the commencement of the work. Wherever required,<br />
detailed drawings shall be prepared and got approved.<br />
On completion of the work, completion drawings shall be prepared and two<br />
copies of the same should be submitted to the Employer. The completion drawings<br />
shall indicate clearly the main switch board, the runs of various mains and submains,<br />
position of points and their controls. All circuits shall be clearly indicated and<br />
numbered in the wiring diagrams and all points shall be given the same number as<br />
the circuit to which they are electrically connected. For bought out items such as<br />
Transformers, PCC Sub Panels etc then he must submits drawings and specifications<br />
and technical information atleast in four sets.<br />
8.0 Marking & Apparatus :<br />
When a board is connected to voltage higher than 250 volts, all the terminals or<br />
leads of the apparatus mounted on it shall be marked in the following colours to<br />
indicate the different poles or phases to which the apparatus or its different<br />
terminals may have been connected.<br />
Three Phases -- Red, Blue & Yellow<br />
Neutral -- Black<br />
Off wire -- White or Grey<br />
Earth wire -- Green<br />
Where four wire three phase wiring is to done, the neutral shall be in black Colour<br />
and the other three wires in with Red, Blue & Yellow Colour. Where it has more than<br />
one switch, each such switch shall be marked to indicate which section of the<br />
installation it controls. The main switch shall be marked and also where there are<br />
more than one main switch in the building, each such switches shall be marked to<br />
indicate which section of the installation it controls.<br />
All marking required under this clause shall be clear and permanent.<br />
Tender Document UBI Deva branch
55<br />
9.0 Materials :<br />
All materials used in the construction of fittings shall be of such quality, design and<br />
construction that will provide adequate protection in normal use against<br />
mechanical and electrical failures and exposures to the risk of injury or electric<br />
shock and shall withstand the effects of exposure to atmosphere.<br />
10.0 Ceiling Rose :<br />
Ceiling rose and similar attachments - A ceiling rose or any other similar<br />
attachments shall not be used on a circuit for the voltage which normally exceeds<br />
250 Volts. Normally only one flexible cord<br />
shall be attached to a ceiling rose. Specially designed ceiling roses shall be used for<br />
multiple pendants.<br />
11.0 Socket Outlets & Plugs :<br />
A socket outlet shall not embody fuse terminals as an integral part of it. But the fuse<br />
may be embodied in plug in which case the plug shall be non-reversible and shall<br />
be so arranged and connected that the fuse is connected to an outer or phase<br />
conductor or the non-earthed conductor of the circuit. Every socket outlet shall be<br />
controlled by a switch which will be on the live side of the line. In an earthed system<br />
of supply, the outlet and plug shall be three pin type and the third terminal<br />
connected to earth.<br />
a) Every lighting fitting shall be controlled by a switch and where two controls for a<br />
point is necessary then it shall be controlled by two way switches. Lights, fans and<br />
socket outlets shall be so located as to provide maximum comfort to the occupant<br />
and to enable him to utilise the electricity in the most economical manner.<br />
b) Where conductors are required to be drawn through tube or channel leading to<br />
the fittings, the tube or channel must be free from sharp angles or protecting edges<br />
and of such size as will enable them to be wired with the conductors used for the<br />
final sub-circuit without removing the braiding or taping. As far as possible all tubes<br />
or channels should be of sufficient size to permit looping back.<br />
c) Where a light fitting is supported by one or more flexible cords, the maximum<br />
weight to which the twin flexible cords can be subjected shall be as follows :<br />
SIZE OF TWIN FLEXIBLE CORDS<br />
Nominal cross sectional No. & diameter area of Maximum permissible<br />
in wires weight<br />
Sq.Inch Sq.mm Sq.Inch Sq. mm Kg.<br />
Lbs.<br />
0.0006 0.5 14/0.0076 14/0.193 1.4 3<br />
0.0010 - 23/0.0076 23/0.193 2.3 5<br />
0.0017 1.5 40/0.0076 40/0.193 4.3 10<br />
Tender Document UBI Deva branch
56<br />
Where the weight of the fixture is greater than 4.5 Kgs.(10 Lbs) then it has to be<br />
supported, two or three twin flexible cords and shall be used so that the maximum<br />
weight to which any cord is subjected does not exceed the above values, or<br />
Alternatively other support viz. suitable metal pipe or suitable support shall be<br />
provided. Preferably metal pipe shall be used only.<br />
d) No inflammable shade shall form a part of a light fitting unless such shade is well<br />
protected against all risks of fire. Celluloid shade or light fitting shall not be used<br />
under any circumstances.<br />
e) Enclosed type fittings shall be provided with a removable glass receptacle,<br />
arranged to enclose the lamp completely and of such size or construction as to<br />
prevent undue heating of the lamp or if the position of fitting be such that the glass<br />
receptable is liable to mechanical damage the glass shall be protected by a<br />
suitable wire guard.<br />
12.0 Fittings Wire :<br />
The use of fitting wire shall be restricted to the internal wiring of the lighting fittings.<br />
Where fittings wire is used for wiring fittings, the sub-circuit leads shall terminate in a<br />
ceiling rose or connector from which they shall be carried into the fittings.<br />
13.0 Lamp Holders :<br />
Lamp holders for use on brackets and the like shall have not less than 1.3 cm(1/2")<br />
nipple and all those for use with flexible pendant shall be provided with cord grips.<br />
All lamp holders shall be provided with shade carriers. Where center contact Edison<br />
screw lamp holders are used, the outer or screw contact shall be connected to the<br />
' middle wire ' or the neutral or to the earthed conductor of the circuit.<br />
14.0 Water Tight Fittings :<br />
External and road lamps shall have weatherproof fittings of approved design so as<br />
to effectively prevent the admission of moisture. An insulating distance piece of<br />
moisture proof material shall be inserted between the lamp holder nipple and the<br />
fitting flexible core conductors and cord grip lamp holders must not be used where<br />
exposed to weather.<br />
15.0 Lamps :<br />
All incandescent lamps, unless otherwise required, shall be hung at height of 2.5m<br />
(8 ft.), above the floor level. They shall be provided with caps of the following<br />
patterns :<br />
--------------------------------------------------------------------------------------------------------------------<br />
Upto and including 200 watts. - Standard Bayonet (B)<br />
Above 200 watts and not exceeding ing 300 watts.<br />
- Edison Screw (E.S.)<br />
Above 300 watts - Golliath Screw (GS)<br />
---------------------------------------------------------------------------------------------------------------------<br />
Tender Document UBI Deva branch
16.0 Fans, Regulators and Clamps :<br />
57<br />
i) Ceiling Fans : Ceiling fans including their suspension shall conform to IS :374-1951<br />
and to the following requirements :<br />
a) All ceiling fans shall be wired to ceiling roses or to special connector boxes and<br />
suspended from hooks or shackles with insulators between hooks and suspension<br />
rods. There shall be no joint in the suspension rod but if joints are unavoidable then<br />
such joints shall be of 2" minimum length and both ends of the pipes shall touch<br />
together within couplers and shall in addition to it be secured by means of split<br />
pins; alternatively the two pipes may be welded.<br />
b) Canopies on top of suspension rod shall effectively hide the suspension.<br />
c) The leadings-in-wire shall be of nominal cross section area not less than 0.002<br />
sq.inch (3.00.029") and shall be protected from abrasion.<br />
ii) Exhaust fans shall be erected at the places indicated by the Consultants / EIC.<br />
For fixing an exhaust fan, a circular hole shall be provided in the wall to suite the<br />
size of the frame, which shall be fixed by means of rag bolt embedded in the wall.<br />
The exhaust fan shall be wired as near to the hole as possible by means of a flexible<br />
cord, care being taken that the blades rotates in the proper direction.<br />
TESTING OF INSTALLATION<br />
17.0 Insulation Resistance :<br />
a) The insulation resistance shall be measured by applying between earth and the<br />
whole system of conductors or any section thereof with all fuses in place and all<br />
switches closed and except in earthed concentric wiring all lamps in position or<br />
both poles of the installation otherwise electrically connected together. A direct<br />
current pressure of not less than twice the working pressure provided that it need<br />
not exceed 500 volts for medium voltage circuits. Where the supply is derived from<br />
the three wire (AC or DC) or a poly phase system, the neutral pole of which is<br />
connected to earth either direct or through added resistance, the working pressure<br />
shall be deemed to be that which is maintained between the outer or phase<br />
conductor and the neutral.<br />
b) The insulation resistance measured as above shall not be less than 50, divided by<br />
the number of points on the circuits provided that the whole installation shall be<br />
required to have an insulation resistance greater than one mega ohm.<br />
c) Control rheostats, heating and power appliances and electrical signs may, if<br />
required, be disconnected from the circuit during the test, but in that event the<br />
insulation resistance between the case of frame work and all live parts or each<br />
rheostat appliance and sign shall not be less than that specified in the relevant IS<br />
specifications shall not be less than half a megohm.<br />
d) The insulation resistance shall also be measured between all conductors<br />
connected to one or phase conductor of the supply and all the conductors<br />
Tender Document UBI Deva branch
58<br />
connected to the middle wire or the neutral or to the other pole or phase<br />
conductors of the supply and its value shall not be less than that specified in sub<br />
clause(b).<br />
e) On completion of an electric installation (or an extension to an installation) a<br />
certificate shall be furnished by the contractor countersigned by the qualified<br />
supervisor where the installation was carried out.<br />
Testing of earth continuity path : The earth continuity conductor including metal<br />
conduits and metallic envelopes of cables in all cases shall be tested for electric<br />
continuity and the electrical resistance of the same along with the earthing lead<br />
but excluding any added resistance or earth leakage circuit-breaker measured<br />
from the connection with the earth electrode to any point in the earth continuity<br />
conductor in the completed installation shall not exceed one ohm.<br />
Testing of polarity of non-linked single pole switches :<br />
a) In a two wire installation a test shall be made to verify that all non-linked single<br />
pole switches have been fitted in the same conductor throughout and such<br />
conductor shall be labeled or marked for connection to an outer of phase<br />
conductor or to the non-earthed conductor of the supply.<br />
b) In a three wire or a four wire installation, a test shall be made to verify that every<br />
non-linked single pole switch is fitted in a conductor which is labeled or marked for<br />
connection to one of the outer or phase conductor of the supply.<br />
18.0 TELEPHONE CABLING :<br />
18.0 TELEPHONE AND COMPUTER CABLING (Structure Cabling)<br />
18.1 Telephone multicore wires and cables shall be supplied by Contractor and<br />
shall be done concealed wiring in PVC rigid conduit.<br />
18.2 The wiring of telephone shall be done with the 20/25 mm PVC rigid Conduit<br />
1.5 mm thick with intermediate draw boxes if required. The conduits for the<br />
system shall run exclusively for telephone wires and draw boxes shall be of 16<br />
SWG m.s. box with cover of 3 mm thick formica / hylam cover sheet..<br />
For the telephone system wires shall be 2 pair of 0.51 cross section PVC insulated<br />
tinned copper conductor wires and shall be run direct from each RJ11 outlet /<br />
point to the tag block. The main/sub telephone cabling shall be done only in<br />
internal building areas using in multiplication of 10 pair of 0.51 (or as per drawing<br />
) cross section PVC insulated tinned copper conductor wires as per the<br />
requirement in conduits. There shall be no joint anywhere in the complete run of<br />
these wires. Telephone wires shall be ITI approved as mentioned in the list of<br />
materials.<br />
Tender Document UBI Deva branch
19.0 CONDUIT CAPACITY<br />
59<br />
Maximum number of PVC insulated cables confirming to IS: 694-1977 than can<br />
be drawn in one conduit shall be as follows ;<br />
20mm 25mm 32mm 38mm 51mm 64mm<br />
S B S B S B S B S B S B<br />
1.5 5 4 10 8 10 12 - - - - - -<br />
2.5 5 3 8 6 12 10<br />
4 3 2 6 3 10 8<br />
6 2 - 5 4 8 7<br />
10 2 - 4 3 6 5 8 6<br />
16 - - 2 2 3 3 6 5 10 7 12 8<br />
25 - - - - 3 2 5 3 8 7 9 7<br />
35 - - - - - - 3 2 6 5 8 6<br />
50 - - - - - - - - 5 3 6 5<br />
70 - - - - - - - - 4 3 5 4<br />
NOTE:<br />
1. The above table shows the max. capacity of conduits for a simultaneous drawing<br />
of cables.<br />
2 The columns headed 'S' applies to runs of conduit which have distance not<br />
exceeding 4.25m between draw in boxes and which do not deflect from the<br />
straight by an angle of more than 15. The columns headed 'B' apply to runs<br />
of conduit which deflect from the straight by an angle of more than 15.<br />
Tender Document UBI Deva branch
20.0 CABLES<br />
20.30 Cabling :<br />
60<br />
Cabling shall be done with help of jack and rollers. Cable shall be passed through<br />
RCC Hume Pipe wherever road crossing or pathway crossing is there. All cables<br />
shall rise form cable trenches in G I Pipes. Cable shall be tagged as per cable<br />
schedule at every 30 mts. by Aluminum tags of minimum 2mm thick securely<br />
fastened. They shall also be identified near the terminations.<br />
Above the cable trenches cable route markers shall be installed as per rules and<br />
regulations at every 30 mts. and at every turnings of the cables or branching of<br />
cables.<br />
All cables shall be laid in trenches at a depth of 1000 mm clear from last layer of<br />
bricks and as shown in drawings. Before laying of cables sand shall be spread then<br />
the cable shall be laid which shall again be covered with sand minimum 150mm<br />
from the top of the largest dia of the cable. Then second class bricks shall be laid<br />
across the trench completely covering the trench, lastly excavated soil shall be<br />
backfilled and compacted by watering intermittently.<br />
All cables after laid shall be checked for insulation level and meggered before<br />
back filling. Cable entries in GI pipes or Hume pipes shall be sealed by cable<br />
compound or putty for smaller dia of pipes.<br />
If required for the cable to run on cable trays then the cable shall be clamped by<br />
16 SWG GI saddles and clamps. All works should be done to the satisfaction of the<br />
Engg.- in Charge.<br />
20.4 Terminations<br />
Cable shall be terminated by means of double compression heavy duty glands<br />
with PVC hood and terminated by solder less crimped type long barrel copper lugs.<br />
All should be done to the satisfaction of the Engg.-in -Charge. If the cores do not<br />
have any colour identification, then they should be identified by insulation tape of<br />
various phases. Cable shall enter any termination point by means of double<br />
compression glands, using reducers if required or drill of holes in gland plates. IF<br />
panel installed on a cable trench which does not have any bottom excess then<br />
holes shall be drilled in one line for the cables then the gland plates is cut into two<br />
halves from the center of the hole. Cables inserted and sealed and the armored in<br />
the bottom should open and earthed to the earth bus. Crimping of lugs shall be<br />
done by hand crimping tool or hydraulic crimping tool with conducting jelly<br />
applied to conductors. Insulation shall be cut immediately after the lugs and care<br />
should be taken that the conductor is not left open. All jointing and crimping shall<br />
be carried out by licensed and experienced jointers approved E.I.C. and<br />
termination and straight joint shall be of `Taped' or heat shrinkable type as<br />
specified.<br />
Tender Document UBI Deva branch
61<br />
20.5 Testing :<br />
Before energizing , the megger test shall be carried out for insulation resistance<br />
between phase to phase and phase to earth.<br />
For cable up to 1.1KV grade 1000 KV megger shall be used.<br />
D.C. High Voltage test shall be conducted after installation on the following and<br />
test results are recorded as per format furnished by the Engineer-in-charge.<br />
a) All 1000 Volts grade cables in which straight through joints have been made.<br />
b) All cables above 1100 V grade.<br />
For record purposes test data shall include the measure values of leakage current<br />
verses time.<br />
The DC High voltage test shall be performed as detailed below in the presence of<br />
the EIC or his authorized representative only.<br />
Cables shall be installed in final position with all the straight through joints complete.<br />
Termination shall be kept on unfinished so that the motors, switchgears, t<br />
transformers, etc.. are not subjected to test Voltages.<br />
The Test Voltage shall be as under:<br />
i) for cable 1.1 KV Grade 2.0 KV DC<br />
ii) for cable 3.3 KV Grade 5.4 KV DC<br />
iii) for cable 6.6 KV Grade 10.8 KV DC<br />
iv) for cable 11 KV Grade 18 KV DC<br />
Cable schedule and layout drawings must be marked for AS BUILT conditions during<br />
the installations work and shall be approved by the Site Engg.<br />
EARTHED TERMINAL<br />
Identification of earthed and earthed neutral conductors and position of switches<br />
and cutouts therein :<br />
Where the conductors include an earthed conductor of two-wire system or an<br />
earthed neutral conductor of a multi-wire system or a conductor, which is to be<br />
connected thereto, the following conditions shall be compiled with<br />
1. An indication of a permanent nature shall be provided by the owner of the<br />
earthed or earthed neutral conductor, or the conductor, which is to be connected<br />
thereto, to enable such conductor to be distinguished from any live conductor.<br />
Such indication shall be provided.<br />
a) Where the earthed or earthed neutral conductor is the property of the supplier,<br />
at or near the point of commencement of the supply.<br />
Tender Document UBI Deva branch
62<br />
b) Where a conductor forming part of a consumer's system is to be connected to<br />
the supplier's earthed or earthed neutral conductor, at the point where such<br />
connection is to be made.<br />
c) In all other cases, at a point corresponding to the point of commencement of<br />
supply or at such other point as may be approved by an inspector.<br />
2. No cut-out, link or switch other than a linked-switch arranged to operate<br />
simultaneously on the earthed or earthed neutral conductor and live conductor<br />
shall be inserted or remain inserted in any earthed or earthed neutral conductor of<br />
a two-wire system or in any earthed or earthed neutral conductor of a multi-wire<br />
system or in any conductor connected thereto with the following exceptions<br />
a) A link for testing purposes - OR -<br />
b) A switch for use in controlling a generator or transformer.<br />
I / We confirm that the best of our knowledge this information is authentic and<br />
accept that any deliberate concealment will amount to disqualification at any<br />
stage.<br />
Seal and Signature of the Bidder / s.<br />
DATE :<br />
PLACE :<br />
Tender Document UBI Deva branch
ADDITIONAL SPECIFICATION & CONDITIONS<br />
1.0 This is a Item rate Tender<br />
63<br />
2.0 Wherever the specifications are not specified in details the work shall be carried out as<br />
per CPWD specifications or Manufacturer’s instructions or architects instructions depending<br />
upon the site conditions as directed by the Bank/ Architects<br />
3.0 The tenderer must visit the site and acquaint themselves with the site conditions. It<br />
must be noted that the work is to be carried out in the functional branch without hindering<br />
the normal functioning of the Branch. The work shall generally be carried out on holidays or<br />
after Banking hours only.<br />
4.0 The contractor has to work in coordination with the other contractors and daily/weekly<br />
schedule of working shall be prepared in consultation with the Architects/Banks. Regular<br />
updating / modification of such schedule shall be required.<br />
5.0 For normal functioning of the Bank/Branch the contractor shall be required to shift the<br />
furniture etc and/or relocate the existing and/or new loose and/or fix furniture and/or any<br />
other item of works and/or any such materials at new location at times. The contractor shall<br />
carry out all such activities with utmost priority and without any additional/extra cost to the<br />
bank. The tendrerer shall quote the rates inclusive of all such activities/works as may be<br />
required as per site conditions. Proper cordening shall be done to avoid any disturbance<br />
dust etc. At the end of the day the site shall be cleaned and kept cleaned all times. The<br />
rates quoted by the tenderer shall be inclusive of all such temporary/semi-permanent<br />
works/activities.<br />
6.0 The contractor shall be required to obtain satisfactory execution and/or application<br />
certificate from the manufacturer and/or authorized dealer/s in respect of specialized items<br />
of work such as water proofing etc as decided by the Bank/Architects. The contractor shall<br />
arrange for the visit and inspection of the work in respect of the representatives of such<br />
firms/manufacturers within the rates quoted/accepted by the bank.<br />
7.0 The contractor shall produce the bills / challans / documentary evidences and proof in<br />
respect of genuineness of materials used by him when so ever asked/demanded by the<br />
Architects/Bank<br />
8.0 Please note that in case of a percentage rate tender and individual item rates are not to<br />
be filled and/or tempered with and/or altered and/or changed. Only the percentage &<br />
amount above (+) or Below (-) the estimated rates & amount are to be filled and the Net<br />
Tender Amount is to be worked out.<br />
9.0 No running bill payments shall be made. The contractor has to submit the Final Bill on<br />
satisfactory Completion of the Work. However the contractor shall ensure that the<br />
measurements are recorded by them and got checked from the Architects from time to time<br />
particularly for hidden/concealed item of works.<br />
10.0. The Bank will be absolutely authorized and entitled to recover the amount on account<br />
of loss to third party and / or Bank and / or workmen and / or any statutory recovery etc.<br />
Tender Document UBI Deva branch
64<br />
from the contractors bill and / or any amount due to be paid to the contractor, in case<br />
contractor fails to settle such claims and or fails to pay against such claims/recoveries<br />
promptly to the satisfaction of the bank/architects.<br />
11.0 The necessary permission / permit / work pass required to be obtained from the<br />
Local authority shall be taken by the contractors at his own cost. However the Bank<br />
will assist the contractor in obtaining this permission etc.<br />
12.0 Sizes of various furniture item mention in BOQ/ Schedule of quantities may vary<br />
slightly as per site conditions and / or as per instructions of architects that is maximum by<br />
up to + or – 2”. No deduction or addition payment shall be made to the contractor if the<br />
variation is within side limits.<br />
Tender Document UBI Deva branch
65<br />
LIST OF APPROVED MAKES OF MATERIAL:<br />
The following are approved brand makes/manufacture’s makes listed below. In case It is<br />
established that material as listed below is not available in the market, approved equivalent<br />
material and finished of any other specialized brand names/ manufacturer’s makes may be<br />
used as per approval of BANK/ Architect/Consultant.<br />
SR.NO. ITEM APPROVED MAKE<br />
A CEMENT<br />
1 GREY CEMENT<br />
AMBUJA, ACC, GRASIM<br />
ULTRATECH (L & T ),<br />
2 WHITE CEMENT JK, BIRLA<br />
B BRICKS GOOD QUALITY APPROVED BY EIC<br />
C<br />
TILES<br />
(GLAZED/CERAMIC/VITRIFIED)<br />
1 GLAZED TILE S NITCO, SOMANI, BELL<br />
2 CERAMIC TILES NITCO, SOMANI, BELL<br />
3 VITRIFIED TILES SOMANI, NITCO, EURO, ASIAN<br />
4 RUSTIC VITRIFIED TILES VERMORA OR EQUIVALENT<br />
D PAINTS<br />
PAINTS<br />
ICI, ASIAN, BERGER, NEROLAC,<br />
JOHNSON & NICOLSAN<br />
1 ANTI CORROSIVE PAINT TIKITAR, FINCOAT<br />
2 RED OXIDE ASIAN, NEROLAC<br />
3 POLISH ASIAN MELAMINE<br />
4 EXTERIOR PAINTS AEP- APEX<br />
5 ENAMEL PAINT ICI,NEROLAC<br />
E FALSE CEILING<br />
1 GYPSUM BOARD INDIA GYPSUM<br />
2 G.I. SECTION COMPANY SECTION GYPSUM STEEL<br />
F SANITARYWARE<br />
1 WASH BASIN, URINALS, W.C. CERA, PARRYWARE, HINDUSTAN<br />
G S.S. SINK NIRALI OR EQUIVALENT<br />
H SANITARY FITTINGS<br />
BIB / STOP / ANGLE COCK &<br />
1 OTHER C.P. BRASS FITTINGS JAGUAR (CONTINENTAL)<br />
I PIPE / PIPE FITTINGS<br />
1 C.I. PIPES NECO<br />
2 G.I. PIPES SURYA, TATA OR EQUIVALENT<br />
3 PVC PIPES & FITTINGS PRINCE, SUPREME<br />
4 GULLY TRAP APPROVED BY EIC<br />
5 C.I. GULLY TRAP COVER NECO<br />
6 INSPECTION COVER NECO<br />
Tender Document UBI Deva branch
66<br />
J GLASS / MIRRIOR SAINT GOBIN, MODI FLOAT<br />
K WATER PROOFING<br />
WATER PROOFING<br />
1 COMPOUND/ CHEMICAL PIDILITE, CHEMBOND<br />
2 HARDENNERS IRONITE, FERROK, HARDONITE<br />
FAIRMATE, PIDILITE, LATIGRATE, OR<br />
3 TILE FIXING ADHESIVE EQUIVALENT<br />
4 SEALENT FOSROC, GE SILICONES<br />
Tender Document UBI Deva branch
67<br />
LIST OF APPROVED MAKES OF MATERIAL:<br />
The following are approved brand makes/manufacture’s makes listed below. In case It is established that<br />
material as listed below is not available in the market, approved equivalent material and finished of any other<br />
specialized brand names/ manufacturer’s makes may be used as per approval of BANK/ Architect/Consultant.<br />
SR.NO. ITEM APPROVED MAKE<br />
A<br />
WOOD/PLY/BLOCK<br />
BOARD/MDF<br />
1 COMMERCIAL PLY (IS 303) GREENPLY, ANCHOR ,KITPLY<br />
2<br />
3<br />
BLOCK BOARD IS – 1656<br />
BWP GRADE GREENPLY, CENTURY<br />
LAMINATE (1.0mm THICK )<br />
IS 2046 GRADE<br />
GREENLAM, MERINO ROYALE TOUCH,<br />
FORMICA,CENTURY, HOMICA,<br />
4 MDF (<strong>INTERIOR</strong> GRADE), NVWUD, DURATUFF /<br />
5<br />
6<br />
PARTICLE BOARD<br />
<strong>INTERIOR</strong> SITE NOVAPAN (INDIA ) LTD.,Deco board<br />
PLYWOOD IS – 710 BWP<br />
GRADE<br />
GREENPLY, ANCHOR , CENTURY SAMRAT<br />
PLY<br />
7 WOOD SYCAMORE, SAL OR MATCHING WOOD<br />
9<br />
ALUMINIUM COMPOSITE<br />
PANEL(<strong>INTERIOR</strong> GRADE<br />
3MM THK) ALU DÉCOR,EUROBOND,<br />
B HARDWARE<br />
1 EXPOSED DOOR CLOSER OZONE, GODREJ OR APPROVED<br />
2 FLOOR SPRING OZONE ,HARDWIIN<br />
3 MULTIPURPOSE SET LOCKS<br />
4 HINGES<br />
a)<br />
b)<br />
FOR STORAGE UNITS<br />
SHUTTERS<br />
GODREJ, DORSET MP 300 SS WITH 3<br />
KEYS,EBCO<br />
110 DEG OPENING<br />
AUTOCLOSING SS HINGES HETITCH,EBCO OR EQUIVALENT<br />
c)<br />
FOR CABIN DOORS -SS<br />
HINGES YAMA OR APPROVED EQUIVALENT<br />
5 HANDLES<br />
a) FOR STORAGE UNITS<br />
SS BRUSH FINISHED 316 GRADE -DUNEX,<br />
HETITEH OR AS APPROVED. 4"LONG<br />
Tender Document UBI Deva branch
)<br />
c)<br />
FOR CABINS -MORTISE<br />
HANDLE<br />
68<br />
DORSET, ENOX, DUNEX, IPSA, SRISMA<br />
FLYS<br />
d) FOR CABINS -<br />
SS BRUSH FINISHED 316 GRADE - DUNEX,<br />
HETITEH OR AS APPROVED. 8"LONG<br />
6 LOCKS<br />
a) MORTISE LOCK DORSET, OZONE, SRIS MA FLYS<br />
b) CLINRICAL LOCK YALE , GODRJ<br />
c) DEAD LOCK GODREJ<br />
C ALUMINIUM SECTIONS JINDAL, INDAL,<br />
D ROLLER BLINDS VISTA,MAC/RK OR EQUIVALENT<br />
E<br />
KEY BOARD, CPU<br />
HANGER STAND<br />
EBCO OR EQUIVALENT – ADJUSTABLE-<br />
VERTICAL/ROTATE/HORZONTAL AS<br />
APPROVED BY ARCHITECT<br />
Colour Code ALTERNATE LAMINATES :‐<br />
The alternate laminate brands indicated bellow may be considered where the original signature<br />
brand is not available.<br />
LAMINATION<br />
BRAND<br />
SIGNATURE<br />
RED BLUE WHITE<br />
231 SF‐DEEP‐<br />
SPICE<br />
FORMICA G566/1566<br />
HERITAGE 1234 OAK (RED )<br />
SILICON<br />
176 SF<br />
(VADAFONE RED)<br />
WHITE<br />
CEDER<br />
SHADE<br />
208 SF BRISTOL 101 MT NOBLE MATCHING<br />
G457J/1457J<br />
( SPECTRUM BLUE )<br />
1257SD<br />
(ELECTRIC BLUE )<br />
G324 / 1324<br />
SUPER WHITE<br />
101 SD SUPER<br />
WHITE<br />
MATCHING<br />
MATCHING<br />
200SF(BLUE) 101 MT WHITE MATCHING<br />
EURO ………… 192SF 101 SF MATCHING<br />
GREENLAM ………… ………… 101 WHITE MATCHING<br />
CENTURY ………… ………… 107 SNOW WHITE MATCHING<br />
NEW MICA ………… 3590 BLUE 3501 WHITE MATCHING<br />
In addition to the above brands, any other equivalent brand conforming to IS 2046 of similar shades<br />
may be considered.<br />
Tender Document UBI Deva branch
APPROVED MAKE LIST OF EQUIPMENT AND ACCESSORIES<br />
1. PVC rigid conduits & Accessories<br />
69<br />
2 mm thick Precision Plastic Co. ISI and FIA approved /<br />
Kalpdeep / Vraj / Nihir make<br />
2. a) L.T. Cables Polycab / CCI / TORRENT/ HAVELL 'S<br />
b) Wires (FRLS) Finolex / R. R. Kable / Havell's<br />
3. Main Distribution Boards MDS Legrand / Hager / Merlin Jerin [ Multi 9]<br />
4. Miniature Circuit Breaker MDS Legrand / Hager / Merlin Jerin [ Multi 9]<br />
5. ELCB / RCCB MDS Legrand / Hager / Merlin Jerin [ Multi 9]<br />
6. Domestic fittings<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
a) 5A one / two way switch<br />
Wround<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
b) 5A 5 pin socket<br />
Wround<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
c) 16A one / two way switch<br />
Wround<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
d) 6A/16A socket<br />
Wround<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
e) fan step regulator<br />
Wround<br />
Legrand Mosaic / Cabtree Saphire make / MK Wrapped<br />
f) Telephone RJ - 11 socket + Box Wround<br />
f) Holders / ceiling roses Anchor / Maru make<br />
g) Adhesive Tape Bhor (Steel Grip) or approved<br />
7. 10 - 30 A Polycarbonate Socket & Top MDS Legrand / Hager<br />
8. Telephone Wires / Cable Finolex / R. R. Kable<br />
9. Telephone tag block Krone make<br />
10. Cable Lugs Dowell / Lotus / Jainson<br />
11. Cable gland Single / Double<br />
Compression HMI / Comet<br />
12. Lighting Fixtures Wipro / Philips<br />
13. Exhaust fan (Light duty) Khaitan /Crompton make<br />
14. Switch gears MDS Legrand / L& T / Schieder<br />
17. Ammeter / Voltmeter AE / HPL /MECO/ Enercon make<br />
18. Selector switches L & T salzer / Kaycee make.<br />
Tender Document UBI Deva branch
19. Indicator lamps LED type Teknic / Precifine/ Binay.<br />
21. Change Over Switch HPL Socomac/ Havell's / L & T<br />
70<br />
22. Connector strips Wago / Elmex make.<br />
23. Ceiling Fan Orient (PSPO) / Crompton ( )<br />
24. Wall mounted Fan Crompton / Khaitan<br />
25. Data Cable - I / O Unit D - Link<br />
Note :- The Electrical Contractor shall Produce Copy of valid licence for practicing issued by<br />
statutory authority for this purpose before commencing the work.<br />
Tender Document UBI Deva branch
71<br />
IMPORTANT POINTS TO BE NOTED<br />
NOTE :- The Electrical Contractor shall produce copy of valid license for practicing issued<br />
by statutory authority for this purpose before commencing the work.<br />
1) Rates for LIGHT, FAN, EX. FAN, CALL BELL, RAW POWER ETC. POINTS includes<br />
the cost of main wires and PVC pipes from LDB-ROW POWER DB to DIFFERENT<br />
SWITCHBOARDS WITH REQUIRE CIRCUITS<br />
2) Rates for COMPUTER POWER POINTS includes the cost of wires and PVC pipes from UPS DB to<br />
COMPUTER POWER POINTS.<br />
3) Rates for COMPUTER I/O include the cost of DATA cables and PVC pipes from SERVER SWITCH<br />
to COMPUTER NODES.<br />
4) Rates for TELE POINTS include the cost of TELEPHONE Wires and PVC pipes from<br />
EPABX/CRONE BOX to TELE. POINTS.<br />
5) Rates for SMOKE/HEAT DETECTORS includes the cost of wires and PVC pipes<br />
6) Rates for A.C./POWER POINTS includes the cost of wires and PVC pipes from A.C. DB to<br />
DIFFERENT A.C. AND POWER POINTS WITH REQUIRE CIRCUITS.<br />
7) THE CONTRACTOR SHOULD SUBMIT THE BUILTUP SLD OF PANEL, SLD OF DIFFERENT<br />
DBS TO DIFFERENT SWITCHBOARDS WITH NUMBERING , SLD OF DATARACK TO<br />
DIFFERENT I/O POINTS WITH NUMBERING, TELE. KRONE BOX TO DIFFERENT TELE.<br />
POINTS WITH NUMBERING, ETC. AFTER EXECUTION OF THE BRANCH.<br />
8) THE CONTRACTOR SHOULD USE MAX. 3 CIRCUITS IN ONE CONDUIT FOR UPS & RAW<br />
POWER POINTS.<br />
9) THE CONTRACTOR SHOULD USE MAX. 3 WIRES OF DATA & TELE. IN ONE CONDUIT.<br />
EVERY CONDUIT – UPS , RAW POWER , DATA & TELE. SHOULD BE SEPARATE.<br />
Tender Document UBI Deva branch
PROPOSED LAY OUT FOR UBI BRANCH AT : DEVA<br />
LAYOUT PLAN<br />
NOTE : DO NOT MEASURE THE DRAWINGS , FOR ANY DESCRIPENCY CONTECT ARCHITECT IMMIDIATELY SCALE : 1" = 4'-9"<br />
Platform<br />
Pantry<br />
10'6" x 7'1"<br />
FP8<br />
SB14<br />
ht. 4'-0"<br />
FILE<br />
CABINET<br />
Safe<br />
TP13<br />
TP12<br />
Record room<br />
12'8" x 8'3"<br />
FP7<br />
ABBRIVIATIONS:-<br />
SB : Switch Board<br />
FP : Fan Point<br />
CP : Ceiling Point<br />
MTP : MiroltaTube Point<br />
TP : Tube Point<br />
WF : Wall Fan<br />
^ : 5 Amp Plug Point<br />
^. : 15 Amp Plug Point<br />
SB15<br />
ht. 4'-0"<br />
L.Toilet<br />
4'0" x 3'0"<br />
MTP1<br />
MTP1<br />
G.Toilet<br />
4'0"x4'1"<br />
Cotastone self<br />
TP11<br />
SB13<br />
ht. 3'-0"<br />
Cotastone self<br />
SB1 : FP1, TP1, TP2, TP3<br />
SB2 : ^ for Computer, LAN Cable,<br />
pt.for Tele,^ for printer<br />
SB3 : FP2, TP4<br />
SB4 : FP3&FP4, TP5, TP6, ^<br />
SB5 : ^ for Server Computer, LAN<br />
Cable ( 2 nos )<br />
SB6 : ^ for Computer, LAN Cable,<br />
pt.for Tele,^ for printer<br />
SB7 : ^ for Computer, LAN Cable,<br />
pt.for Tele,^ for printer<br />
SB8 : ^ for Computer, LAN Cable,<br />
pt.for Tele,^ for printer<br />
SB9 : FP5, TP7,^.<br />
SB10 : FP6, TP8,^<br />
SB11 : ^ for Computer, LAN Cable,<br />
pt.for Tele,^ for printer<br />
SB12 : TP9, TP10<br />
SB13 : FP7, TP11, TP12<br />
SB14 : FP8, TP13, ^. For Water Cooler ,^<br />
SB15 : MTP1, MTP2<br />
NOTE : Incase of addition of any<br />
ele ite / points other than tender<br />
item discuss with architect<br />
before execution<br />
SB12<br />
ht. 3'-0"<br />
COUNTING<br />
MACHINE<br />
SB9<br />
ht. 3'-0"<br />
TP7<br />
TP10<br />
Steel CB<br />
CASH CABIN<br />
5'0" X 7'-6"<br />
FP5<br />
Cash:1<br />
TP3<br />
Steel CB<br />
slip CUSTOMER FP1LONGUE<br />
counter 9'0"X14'1"<br />
TP2<br />
waiting sofa<br />
SB7<br />
SB8<br />
ht. 1'-6" ht. 1'-6"<br />
TP1<br />
CL:2<br />
FP4<br />
waiting sofa<br />
SB1<br />
ht. 3'-0"<br />
Steel CB Steel CB<br />
TP6<br />
printer<br />
SB6<br />
ht.<br />
1'-6" FP3<br />
CL:1<br />
TP5<br />
MANAGER'S CABIN<br />
8'6" X 7'6"<br />
TP4<br />
Otta<br />
17'3" x6'10"<br />
ARCHITECTS<br />
KRISHNA SHAH<br />
MINESH SHAH<br />
6 Parshwanath Sco.<br />
B/H Akota Atithi gruh Akota<br />
VADODARA 390 020<br />
PH : 9 9 2 5 2 4 5 9 6 5<br />
M : 9 8 2 5 3 2 3 6 1 2<br />
Thu., June. 24, 2010 03:55:16 pm<br />
TP9<br />
FP6<br />
FP2<br />
UPS<br />
Officer TP8<br />
SB2<br />
ht. 1'-6"<br />
SB10<br />
ht. 3'-0"<br />
SB11<br />
ht. 1'-6"<br />
SB5<br />
ht. 5'-0"<br />
Server<br />
Rack<br />
SB4<br />
ht. 3'-0"<br />
Storage<br />
Storage<br />
FILE<br />
CABINET<br />
SB3<br />
ht. 3'-0"<br />
Ex Fan
ARCHITECT<br />
KRISHNA SHAH<br />
MINESH SHAH<br />
6,Parshwanath Soc, B/H Akota Atithi Gruh, Akota, Vadodara.<br />
PH: 9 9 2 5 2 4 5 9 6 6 (O)<br />
No. Description Qty Unit Rate Total<br />
<strong>CIVIL</strong> WORK<br />
New Work :<br />
Tender Document<br />
Preamble : Unless otherwise stated the Removal / demolition work shall be carried out carefully<br />
causing minimum disturbance and in coordination with other contractors. The rate should include<br />
stacking of serviceable material and disposal of unserviceable material from the site. Since the<br />
Premises is not vacant, the work may be carried out by contractor from evening till late night and even<br />
on holidays, for which no extra payment shall be made. The loose furniture can be made as /<br />
Specification at other place. Time is essence of the contract. Incase of additional quantity in tender<br />
items OR extra Items required to be executed shall be done only with prier consignment & approval of<br />
UBI RO Office & Architect.<br />
Bill of Quantities<br />
Union Bank Of India, Deva.<br />
1) DISMANTALLING OF BRICK WALLS<br />
Demolishing brick work / RCC in cement including<br />
stacking of serviceable material and disposal of<br />
unserviceable material inclusive of removal & stacking<br />
of door / window with in the wall .<br />
a Demolition of toilet wall tiles = 4'0"+3'0"+4'0"+ 6" +<br />
4'0"+4'2"+4'0"+9"+1'0" x 2'6" ht = 63.55 sq ft + floor tiles<br />
= 13+17 = 30 + 63.55 = 93.55 sq ft<br />
L.S.<br />
b Removal of existing doors, and stacking it<br />
at a place as directed 1.00 Nos.<br />
Removal of entrance door without Ventiletor.<br />
c Removal of existing furniture with care so that L.S.<br />
can be reutilized .Refer the existing layout attached<br />
d Removal & reffiting of existing Entrance collepsible<br />
grill. L.S.<br />
Tender Document UBI Deva branch
2) Making new Toilets of following in toilet .<br />
G.Toilet = 4'0" x 4'1"<br />
L.Toilet = 4'0" x 3'0"<br />
P & F plain coloured glazed tiles of 12" x 12" size<br />
Kajaria or equivalent make laid as/detail pattern in<br />
flooring and 12"x 18"on wall up to 7'-0" ht including<br />
decorative border 3" wide at top & backing coat plaster<br />
in C.M. 1:3 complete.<br />
2.00 Nos.<br />
WB & wall hung E.W.C. in G.toilet , WB & wall hung<br />
anglo Indian in L.toilet With heavy C.P. Flush cock<br />
Taps, hand fauscet and PVC seat cover etc complete<br />
Necessary water supply line of G.I. 'B' Class concealed<br />
in wall and floor with center point fittings<br />
Necessary drainage of C.I. Pipes 3" and 4" dia and N.T.<br />
with C.P.grating concealed in wall and floor .<br />
( Note : The rate quoted should include all work<br />
incidental to renovation of the toilet except construction<br />
of new wall and plaster. However backing coat plaster is<br />
included in the glazed tile work. )<br />
New IC, Drainage line till existing drainage outlet etc<br />
com.<br />
3) Cement Plaster<br />
Providing smooth finish plaster in C.M. 1 : 3<br />
Providing and applying 12mm avg. thick smooth cement<br />
plaster in Cement mortar 1:3 (1 Cement:3 coarse<br />
Sand) including racking out joint over brick and stone<br />
masonry work or concrete surface in two or more coats<br />
as directed, curing scaffolding, drip moulding finishing<br />
smooth etc.<br />
Misc work = 50 sq ft<br />
50.00 Sft<br />
4) Making of entrance steps, & leveling all risers equally,<br />
including removal of existing stone top , additional brick<br />
work & removal or additional civil work, finished with<br />
black granite on tread with bull nose moulding and<br />
Vitrified tile risers, in front of Bank's entrance with<br />
proper levelling, finishing etc com. Steps = 2. nos. 9.00 Rft<br />
( 1 Step + Door sill )<br />
5) Making steps finished with vitrified tiles on tread &<br />
riser in front of record room door ( 3.5 RFT = 2 Tread<br />
& 3 Riser )<br />
7.00 Rft<br />
Tender Document UBI Deva branch
6) P& F 24” x 24” Vitrified tiled flooring to be laid on floor<br />
or laying after removing the existing floor & levelling,<br />
making hard base of Johnson /Naveen/ Euro/ Nitco<br />
ceramics or euivalant make, Fixing with suitable<br />
adhesive ,complete with cutting,edge polish where<br />
necessary and joints filling etc complete.Basic rate of<br />
tiles Rs. 35.00/sq ft ( Banking hall )<br />
495.00 Sft<br />
7) P& F 300mm x 300mm matt finish ceramic tiled<br />
flooring to be laid on floor of<br />
Bell,Vrundavan,Nitco,Asian or euivalant asper<br />
Architect's choice make, Fixing with suitable glue ,<br />
complete with joints filling complete. Basic Rate Rs.<br />
25.00/ sq ft<br />
Record room = 111 sq ft<br />
Pantry = 75 sq ft<br />
186.00 Sft<br />
8) P&F 4'6" X18"X30" pantry platform with black granite<br />
Granite top with facia patty in front with 14"dia SS Sink<br />
& CP wall spout outlet provision for aquaguard with<br />
storage shutters below with 2 shelves inside, front<br />
laminated inside painted ,water connection for sink CP<br />
cock from OHT, drain for sink till the IC & fitting etc.<br />
complete .Dedo same as floor tiles. Basic rate of<br />
ceramic tiles Rs.20.00/sq ft .<br />
Ceramic tiles above platform = ( 7'0"+4'3") x 2'0" ht.=<br />
22.5 sq ft<br />
9) Provision for water cooler as/detail, inlet - outlet,<br />
splash water drainage and saperation of dry- wet area<br />
as/architect's detail etc. complete<br />
10)<br />
Fitting/ fixing New rolling shutter with cover & with<br />
colour base white of ashian paint or equivalent etc.<br />
complete. Oil Paint of Rolling Shutter – Providing &<br />
applying Oil Paint of approved shade ICI Deluxe / Asian<br />
/ Nerolac Or equivalent make with surface Preparation<br />
Primer and Putty on both sides com.<br />
4'9" x 9'0" ht<br />
4.50 Rft<br />
22.5 Sft<br />
1.00 L.S.<br />
43 Sft<br />
Tender Document UBI Deva branch
11) Inside painting ( DISTEMPER PAINT )<br />
P & A TWO & MORE COATS OF DISTEMPER PAINT ON<br />
EXISTING & NEW WALL FRONT BY ROLLER, AT ALL<br />
LEVELS WITH FULL LAPI / PUTTI / PRIMAR COATS AS<br />
REQUIRED (THE RATE SHALL INCLUDE FOR ALL<br />
LADDERS SCAFFOLDINGS AND SUPPORTS)<br />
FOLLOWING THE MANUFACTURERS SPECIFICATION.<br />
THE OLD PAINT HAS TO BE REMOVED / SCRAPED<br />
PROPERLY. THE SURFACE SHALL BE THROUGHLY<br />
CLEANED, DRIED AND MADE FREE OF ALL LOOSE DIRT,<br />
CHALK, GREASE, FUNGUS AND ALAGE, WAX OR<br />
FLANKING PAINT. THE COMPLETE SURFACE<br />
PREPARATION SHALL BE DONE BY FILLING THE<br />
SMALLER CRACKS BY PLASTER OF PARIS & THE<br />
LARGER CRACKS, BY WHITE CEMENT. THE PLASTER<br />
HAS TO BE DONE WHERE LARGER<br />
PATCHES ARE REQUIRED TO TOUCH UP. ON ENTIRE<br />
PLAIN SURFACE, AND ONE COAT OF OIL BASE CEMENT<br />
PRIMER SHALL BE APPLIED. UNWANTED ELEMENTS,<br />
HARDWARES, CLAMPS ETC. SHALL BE REMOVED TO<br />
MAKE SURFACE CLEAN. MINIMUM TWO OR MORE<br />
COATS OF THE LAPI / PUTTI SHALL BE APPLIED TO GET<br />
EVEN SURFACE IN ENTIRE LINE & LEVEL. FINALLY 2 OR<br />
MORE (IF REQUIRED) COATS OF ACRILIC / DISTEMBER<br />
PAINT SHALL BE APPLIED OF SUGGESTED SHADE AND<br />
ROLLER FINISH TO GET THE EVEN AND SATISFACTORY<br />
RESULT, THROUGHOUT THE WORK. THE AREA FOR<br />
THE LIGHT FIXTURES, A.C. DIFFUSERS, COLUMNS ETC.<br />
WILL NOT BE CONSIDERED FOR THE MEASUREMENT<br />
PURPOSE. ALL THE UNWANTED ELEMENTS SHALL BE<br />
REMOVED FROM THE CEILING, WALL ETC. ONLY<br />
ONSITE EXECUTED AREA WILL BE CONSIDERED FOR<br />
THE MEASUREMENT PURPOSE<br />
( DISTEMPER PAINT ) 2523.75 Sft<br />
wall = 27'6"+17'9" +27'6"+17'9" x 10'3" ht = 928 sq ft<br />
less door 4'0" x 7'0" x 2 nos = 56 less window 3'6" x<br />
6'0" x 2 nos = 42 = 830 sq ft<br />
Loft = 17'9" x 2'6" x 2 times = 89.5sq ft<br />
Ceiling = 495 sq ft + Beam = 17'9" x 1'0" x 2 times x 2<br />
nos = 71 sq ft = 566 sq ft<br />
Record room = 8'3"+12'9"+8'3"+12'9" x 10'9" ht =<br />
451.5 sq ft less door = 4'0"+3'6" x 7'0" = 52.5 sq ft =<br />
400 sq ft<br />
Pantry - 10'6"+7'3"+10'6"+7'3" x 10'9" ht = 382 sq ft less<br />
door 3'6" + 2'6"+2'6" x 7'0" = 323 sq ft<br />
Tender Document UBI Deva branch
Loft = 9'0"+5'0" x 2'3" x 2 times = 63 sq ft<br />
Record room Ceiling = 111 sq ft<br />
Pantry Ceiling = 75 sq ft<br />
Toilet Ceiling = 33 sq ft x 2 times = 66 sq ft<br />
12) PAINTING FOR OUTSIDE WALL<br />
Supplying and painting the wall with Apex paint of M/s.<br />
Berger paints/M/s. Asian Paint/M/s. ICI brand or<br />
equivalent in any shades and colour as directed<br />
including cleaning and preparation of the surface, any<br />
height with all labour and material etc. Including<br />
removal/scraping of existing paint / surface preparation,<br />
application of one coat of putty and primer and minimum<br />
2 coats of paint complete. Minimum two or more coats<br />
to be applied. cost of primer-putty included.<br />
Front side = 20'0" x 10'6" = 210 sq ft less door 4'0" x<br />
7'0" =28 less window = 3'5" x 6'0" = 20 sq ft = 162 sq ft<br />
Front side balcony - 20'0" x 3'0" = 60 sq ft<br />
Front side perapit = 20'0"+3'0"+3'0" x 3'0"ht = 78 sq<br />
ft<br />
Compound wall = 8'0'+12'3"+8'0" x 6'0" ht x 2 times<br />
= 339 sq ft<br />
639 Sft<br />
13) OIL PAINTING FOR EXISTING Door, Window, Grill<br />
Supplying and painting the existing Rolling shutter,<br />
window & grill with oil paint OF APPROVED BRAND in<br />
any shades and colour as directed including cleaning<br />
305 Sft<br />
and preparation of the surface, any height with all<br />
labour and material etc. Including removal/scraping of<br />
existing paint / surface preparation, application of one<br />
coat of putty and primer and minimum 2 coats of paint<br />
complete.<br />
Pantry door - 3'6" x 7'0" x 2.times = 49 sq ft<br />
Window - 3'6" x 6'0" x 2 nos . X 3 times = 42 sq ft<br />
ventiletor - 3'6" x 2'0"x 3 times = 21 sq ft<br />
Existing Godrej File cabinet - 1'6"+2'0"+1'6"+2'0" x<br />
5'0"ht = 35 sq ft + Top & Bottom 2'0" x 1'6" x 2 no= 6 =<br />
41 sq ft x 3 nos = 123 sq ft<br />
Toilet door - 2'6" x 7'0" x 2 times = 35 sq ft x 2 nos = 70<br />
sq ft<br />
Tender Document UBI Deva branch
14) Supplying & Fitting Overhead Sintex PVC Water Tank<br />
Heavy type 1000 litres with accessories etc complete 1 nos<br />
15) Covering Pantry Slab Cutout made of Powder coated<br />
GI corrugated sheets of approved shed with MS angle<br />
framing for support & M S weld mesh for safety<br />
purpose fitting,colour,finishing etc complete<br />
16) P & M steel shutter for Banking hall area 's loft.With<br />
grinding, powder coatting of company finish, hardware<br />
,locking, fitting etc. complete 18'0" x 3'0" ht = 54 sq ft<br />
17) P & M M.S. heavy Stand for UPS batteries With<br />
grinding, painting, fitting etc. complete .height @ 3'6".<br />
18) P & F Self & Loft of 1" thick cotastone with top &<br />
open edges polished in record room with end vertical<br />
cotastone support (18" x 7'0") Supported in back & side<br />
wall, end cota stone support with plaster finishing of jari<br />
etc complete as per drawing. Self size @ 7'0" x 1'6" x 6<br />
Nos. + Loft stone size 12'9" x 1'6" x 2nos.<br />
<strong>INTERIOR</strong> WORK<br />
TOTAL AMOUNT - Civil Work<br />
Note: Suggested Lamination Brand and Shade:<br />
"Signature" Brand OR Bank's specified make<br />
WHITE - 101 MT (Noble White)<br />
BLUE - 208 SF (Bristol)<br />
RED - 231 SF (Deep Spice)<br />
Table Top WHITE CEDAR shade laminate.<br />
1) Partitions :<br />
P & F partly glazed partitions 75mm thick with T.W. inner<br />
frame having wooden member @ 2'-0" c/c in each<br />
direction, 8 mm thick M.R.Grade approved plywood fixed<br />
from both side with 1.00 mm thick laminate fixed in pattern.<br />
The upper panel shall have 12 mm thick modi float glass<br />
with etching pattern fixed with Sycamore wood beading.<br />
8 Sft<br />
54 Sft<br />
L.S.<br />
101.25 Sft<br />
Preamble: The interior work rates shall be inclusive of brass / s.s, fixtures, mortise handles,<br />
locks,night latch, door stop etc. All exposed wood shall be of 1st class sycamore wood.<br />
melamine polish unless otherwise stated.<br />
Tender Document UBI Deva branch
a)<br />
All exposed wooden surface shall be Melamine polished<br />
/paint as directed by architect ( half height )<br />
Manager Cabin ( 3'9"+3'0"+6"+4'9" ) x 4'6" ht 54.00 Sft<br />
b) Cash Cabin (5'3"+5'3"+1'0" ) x 5'3" = 60.5 sq ft 60.50 Sft<br />
c) Resizing & Reffiting of existing Cash cabin half ht<br />
partition. Half height partition - UPS side = 4'6" x<br />
4'6"<br />
20.50 Sft<br />
d) P & F 12mm thick toughen glass in front of cash<br />
cabins as/ detail<br />
20.00 Sft<br />
e) P & F wooden flap door between manager's cabin &<br />
counter1 1/2" tk. Made form ply laminated both side with<br />
Sycamore wood beading all around with polish finish comp.<br />
as/detail (cash cabin + Banking hall )<br />
19.50 Sft<br />
2) Doors<br />
a) P&F Alu. Colour Anodiesed fully glazed door 80mm X<br />
45mm sect. 2mm th. with 8mm glass inside eatching,<br />
door flr.spring, handle, Lock, stopper with all necessary<br />
hard ware as/architects selection.<br />
b)<br />
For Bank .= 4'0" x 7'0"<br />
P & F partly glazed door with sycamore wood frame of<br />
size 4"x2 1/2" ,shutter made of flush door with 8 mm<br />
glass panel as / design with 1.00mm laminate fixed<br />
from both sides, including melamine polish / paint to<br />
exposed wooden surface. The rate shall include brass/<br />
s.s.fixtures, Godrej night latch & E.G. Door closer.<br />
Back passage door = 3'5" x 7'0" = 24 sq ft<br />
28.00 Sft<br />
24.00 Sft<br />
c) P & F Panneling packing on Ventilator with ply with<br />
lamination above entrance door<br />
Above door - 4'0" x 1'6" = 6 sqft<br />
6.00 Sft<br />
3) Clerk Counters & Cash Counters 15.75 Rft<br />
Tender Document UBI Deva branch
P & F counter top working area made of laminated top<br />
with 1 1/2" wooden moulding & customer sides vertical<br />
surface of M.R. Grade 19mm thick ply on all sides with<br />
1.00mm thick laminate on all external side.The<br />
customer top @ 12" wide with laminated top & wooden<br />
edge finished, with 12 mm vertical glass as / design,<br />
drawer unit with storage cabinet, foot rest, c.p.u. holder,<br />
key board, sliding drawer, cable manager, brass / s.s<br />
handle, hinges, godrej lock as/detail & instruction of<br />
architect. All invisible surface shall be painted / edges<br />
polished as directed.<br />
4) Officers Tables 1.00 Nos.<br />
P & F table of overall size 4'6" x 2'-6" & side table 1'3" x<br />
2'9", Table top made of 19mm MR grade ply, border 1<br />
1/2" tk as / design & sides made of M.R. Grade 19mm<br />
thick ply on all sides with 1.00mm thick laminate on all<br />
external sides. Each table shall have one drawer<br />
unit,C.P.U.Stand,keyboard drawer cable manager<br />
as/detail.All exposed edges shall have light wood<br />
beading with melamine polish matching the laminate,<br />
inside shall be painted with enamel paint. The rate shall<br />
include brass / s.s handle, hinges, godrej lock etc<br />
5) MANAGER TABLE 1.00 Nos.<br />
P & F table of overall size 5'6" x 2'-6" & side table 1'3" x<br />
3'-0" Table top made of 19mm MR grade ply, border 1<br />
1/2" tk as / design & sides made of M.R. Grade 19mm<br />
thick ply on all sides with 1.00mm thick laminate on all<br />
external sides. Each table shall have one drawer<br />
unit,C.P.U.Stand, keyboard drawer cable manager<br />
as/detail.All exposed edges shall have light wood<br />
beading with melamine polish matching the laminate,<br />
inside shall be painted with enamel paint. The rate shall<br />
include brass / s.s handle, hinges, godrej lock etc<br />
Tender Document UBI Deva branch
6)<br />
P & F file racks 36" & 30" ht. made of 19mm thick MR<br />
Grade as file cabinet with 1mm laminate from all sides<br />
and top with openable / sliding shutter and necessary<br />
shelf. All exposed surface shall have sycamore wood<br />
beading with melamine polish/paint and inside with<br />
enamel paint. The rate shall include brass/s.s<br />
hinges,handles lock.<br />
6'6" x 2'6"= 16 sq ft<br />
7) Writing table/slip counter made of 12mm glass<br />
top,19mm b.b.laminatedon all sides with necessary<br />
compartments for keeping forms as/detail.<br />
8) P & F 4'-0" ht. soft board with cloth covering (@150<br />
Rs/mt.) above file rack. The edges of soft board shell<br />
be covered with soft wood (deodar, chil wood),covered<br />
with cloth on all sides , mounted with mirror screws on<br />
wall.<br />
B.M.cabin - 6'0" x 1'6" = 13.5 sq ft<br />
Customer side - 4'0" x 3'0" = 12sq ft<br />
16.00 Sft<br />
1.00 Nos.<br />
26.00 Sft<br />
9) P&M Waiting sofa with 19mm m.r. grade block board wit<br />
T.W. Frameing inside, imported elastic, 40 density foam<br />
sheet with full covering colth /art. lather(basic rate 350<br />
rs./mt.) with 3" SS legs ,exposed wood shell be painted<br />
/ polished complete. 4'9" + 4'9" = 9.5 RFT<br />
9.50 Rft.<br />
10) P&F Roller Blinds on window of standard quality deck/<br />
/ vyoma /Nova/AD as/selection supplying ,fitting etc<br />
complete.<br />
widows = 4'3"+4'3" x 6'9" ht = 57.5 sq ft + 4'0" x 3'0" =<br />
12 sq ft = 69.5 sq ft<br />
TOTAL AMOUNT - Interior Work<br />
70.00 Sft<br />
PREAMBLE : Elect. work to be made below flooring shall be done in time before the floor<br />
is laid Floor boxes shall be laid below the tables for the Computer data & Tele. cables &<br />
ele. Supply lines. All major wiring except on slab shall be concealed and finished in line<br />
with adjoining plaster and colour finishing complete.<br />
Tender Document UBI Deva branch
NOTE : ALL CHARIS OR CHASES IN WALLS / COLUMNS / SLABS MADE BY THE <strong>ELECTRICAL</strong><br />
CONTRACTOR FOR INSTALLATION OF CONDUITS / S.B. / BOXES ETC. THE FILLING OF THE<br />
SAME IS IN THE SCOPE OF THE <strong>ELECTRICAL</strong> CONTRACTOR INCLUDING ALL NECESSITY<br />
MATERIAL AND LABOUR.<br />
C <strong>ELECTRICAL</strong> WORK<br />
1) Internal wiring<br />
a) One 5 A switch controlling one light point /fan point<br />
Providing and making point wiring duly concealed walls<br />
and furniture / palmate / false ceiling etc. with conduits<br />
of 20mm dia 2.0 mm thick FIA approved PVC rigid<br />
conduits ISI marked with necessary accessories such as<br />
elbow bends tee, junction boxes etc. with 650/1100 V<br />
grade ISI marked PVC insulated copper conduct wires<br />
all accessories, screws and washers with make Modular<br />
switches and accessories with concealed metal box of<br />
18 Swg Ms box duly concealed in wall switches 5 amp.<br />
Plugs all accessories such as angle holder/batten holder<br />
/ceiling rose etc. electrical point to be concealed in all<br />
respect to the satisfaction of EIC<br />
23.00 Pts<br />
b) Providing electronic fan regulator modular type in<br />
modular switch boards<br />
8.00 Nos.<br />
c) 5A socket outlet ( 5 pin ) with 5A SP switch 6.00 Pts<br />
d) Call bell push and ding dong bell complete 1.00 Pts<br />
e) Two way light points 1.00 Pts<br />
2) ---- do --- as item no. 1 but 5 / 15 A ( 6 pin ) switch<br />
socket with outlet box with 650 / 1100 V grade ISI<br />
marked PVC insulated copper conductor wires i.e.<br />
2 nos.of 4.0sq. and line of 2.5 sq.mm standard single<br />
PVC insulated copper conductor wires and M.k. make<br />
accessories to the satisfaction of ETC .<br />
2.00 Nos.<br />
3) Providing. Installing, testing & Commissioning of mains in<br />
conduits of 20 / 25 mm dia. 2 mm thick FIA approved<br />
PVC rigid conduit ISI marked with necessary accessories<br />
such as elbow, bends, tee, junction boxes etc. with<br />
650 / 1100V grade with following wires<br />
a) Providing 2 nos. of 2.5 sq.mm wires and 1 nos. of 1.5<br />
sq.mm.PVC insulated copper conductor wires for mains.<br />
165.00 Rmt<br />
Tender Document UBI Deva branch
)<br />
( DB to SB & SB to SB )<br />
----------do---------- but 4.00 sq.mm. Wires 50.00 Rmt<br />
4) P&F Inverter wiring +change over for 8 light pts & 4<br />
padestral / wall fans as indicated in detail<br />
12.00 Nos.<br />
5) Removal & Reffitting Connectivity for the VSAT / lease<br />
lines (20 material & labor) – P&F of 40mm PVC conduit<br />
of ISI make withsaddling complete for connectivity.<br />
Unit – R.mt ( Only Labour charges fill )<br />
L.S.<br />
6) Signage wiring (material & labour) – P&F Of 3x4mm &<br />
copper flexible wire & PVC Conducting of ISI make<br />
complete with all accessories like saddles, bends etc.<br />
Unit – nos.<br />
2.00 Nos.<br />
7) Removal & Reffing Supply,installation,testing &<br />
commissoning of 63 ampTPN, 440V AC 50 Hz. HRC<br />
type with M.S. enclousers with factory built only.Capacity<br />
of HRC fuse should be of 63 Amp. Job including<br />
termination of incoming / outgoing cable with adequate<br />
size of cu lungs and brass glands. ( Make - L & T)<br />
( Only Labour charges fill )<br />
L.S.<br />
8) Removal & Reffing Supplying & Laying of appro. make<br />
of cable of size 4core10 sq. mm copper cable from<br />
energy meter to FSUand Main D.B.<br />
( Only Labour charges fill )<br />
L.S.<br />
9) Supply, installation, testing & commissioning of wiring for<br />
burglar alarm system with necessary using 1.0 sq.mm. PVC<br />
insulated copper wires in 20mm Dia PVC rigid 2.0mm<br />
Thick conduits complete<br />
1.00 No.<br />
TELEPHONE SYSTEM<br />
10) P & M telephone with Anchor make RJ 11 telephone<br />
socket outlets duly mounted on company made flush<br />
metal or surface PVC boxes,concealed in wall and furniture<br />
with cover plate on wall etc. complete in all respect to<br />
the satisfaction of EIC<br />
5.00 Nos.<br />
11) Providing, laying and drawing of 2 pair telephone wires<br />
of 0.51 cross section tinned copper conductor PVC<br />
40.00 Rmt<br />
Tender Document UBI Deva branch
insulated ITI approved wire in 20 mm dia 2 mm thick<br />
FIA approved PVC rigid conduit ISImarked with all required<br />
accessories and connections complete<br />
COMPUTER POWER SUPPLY<br />
12) Providing, installing, testing & Commissioning of 3 nos,<br />
of 5amp. 5 pair socket outlet with 1 no. of 5 amp SP one<br />
way switch complete to be concealed in furniture / wall /<br />
floor with 18 SWG MS box or surface teakwood box<br />
complete with all connections<br />
COMPUTER LAN CABLE<br />
6.00 Nos.<br />
13) Cat 5 data cable laying in p.v.c. pipe from Server room to<br />
the computer points.( Termination of all network cables in<br />
server room)<br />
150 Rmt<br />
14) Suppy & Installation of D link make I/O box concealed in<br />
p.v.c.box.<br />
6 Nos.<br />
15) Suppy & Installation of 3 mt patch cord D link make from<br />
Computer to I/Obox.<br />
6 Nos.<br />
16) Removal & Refitting of existing 9 U Rack.<br />
EARTHING SYSTEM<br />
1 Nos.<br />
17) Providing & making earth min. 6' deeppit with 300 x 300 x<br />
3mm thick coppet plate incl. all required material such as<br />
charcoal, slot, 19 mm dia GI pipe for watering incl.<br />
masonary chamber and cover dewatering arrangement<br />
of EIC where different Lines from UPS & Ele. Will be<br />
connected<br />
1 No.<br />
18) P & M of joining to 8 g. copper earthing strip on walls/<br />
ceiling / along with conduits etc. with necessary non<br />
rusting clamps, washets, nuts and bolts etc. complete<br />
DISTRIBUTION BOARD<br />
19) Distribution Boards pre fabricated as supplied by<br />
manufactures of approved list make double door with<br />
following MCBs<br />
13 Rmt<br />
a) UPS DB ( 16way SPN DB )<br />
Incoming : 40 A DP MCB<br />
Outgoing : 6 A - 20 A SP MCB ( 12 nos. )<br />
1.00 No.<br />
b) MAIN DB : MDS make dist. Board & MCBs<br />
suitable for following complete<br />
Incoming : 125 A FP MCB - ELCB<br />
63 A TPN - 1 Nos.<br />
Phase indicator lamp ( MCB type )<br />
Outgoing : 6 A - 20 A SP MCB - as / Requirement<br />
: 16 A SP MCB - as / Requirement<br />
1.00 No.<br />
Tender Document UBI Deva branch
voltmetrre,ameter changeover swith etc.complete<br />
LIGHING FIXTURES<br />
20) Supply, installation, testing and commissioning of fittings<br />
/ fixtures including supply and fixing down rods ball<br />
socket / clams chain and flexible cord etc.<br />
a Removal & refitting existing Surface mounted 1 x 40 w<br />
mirolta tube light as/ detail.<br />
4.00 Nos.<br />
b Surface mounted 1 x 40 w mirolta tube light 9.00 Nos.<br />
c Removal & refitting of existing of decorative ceiling fan<br />
as/ detail<br />
2.00 Nos.<br />
d Supply of decorative ceiling fan Usha/Bajaj/crompton o<br />
equivalent make as per selection of Architect<br />
6.00 Nos.<br />
e P&F Surface mounted 1 x 18 w mirolta tube light of<br />
specified make in toilet complete<br />
2.00 Nos.<br />
TOTAL AMOUNT - <strong>ELECTRICAL</strong> WORK<br />
Grand total of Civil + Interior + Elec.<br />
Tender Document UBI Deva branch
PROPOSED LAY OUT FOR UBI BRANCH AT : DEVA<br />
NOTE : DO NOT MEASURE THE DRAWINGS , FOR ANY DESCRIPENCY CONTECT ARCHITECT IMMIDIATELY SCALE : 1" = 4'-9"<br />
Pantry<br />
10'6" x 7'1"<br />
FILE<br />
CABINET<br />
Safe<br />
Record room<br />
12'8" x 8'3"<br />
L.Toilet<br />
4'0" x 3'0"<br />
Cotastone self<br />
G.Toilet<br />
4'0"x4'1"<br />
Cotastone self<br />
Banking Hall area = 500.00 sq ft<br />
Record Room area = 110.00 sq ft<br />
Pantry & Toilet area = 110.00 sq ft<br />
COUNTING<br />
MACHINE<br />
CASH CABIN<br />
5'0" X 7'-6"<br />
Cash:1<br />
slip<br />
counter<br />
waiting sofa<br />
Steel CB<br />
Steel CB<br />
CUSTOMER LONGUE<br />
CL:2<br />
printer<br />
CL:1<br />
9'0"X14'1" MANAGER'S CABIN<br />
8'6" X 7'6"<br />
waiting sofa<br />
Steel CB Steel CB<br />
Otta<br />
17'3" x6'10"<br />
LAYOUT PLAN<br />
ARCHITECTS<br />
KRISHNA SHAH<br />
MINESH SHAH<br />
6 Parshwanath Sco.<br />
B/H Akota Atithi gruh Akota<br />
VADODARA 390 020<br />
PH : 9 9 2 5 2 4 5 9 6 5<br />
M : 9 8 2 5 3 2 3 6 1 2<br />
Thu., June. 24, 2010 03:59:16 pm<br />
UPS<br />
Officer<br />
stand<br />
for<br />
batteries<br />
Server<br />
Rack<br />
Storage<br />
Storage<br />
FILE<br />
CABINET<br />
Ex Fan