8.0 Office accommodation<br />
a) The contractors shall provide and maintain all necessary offices, workshops,<br />
stores, shelters, sanitary facilities, canteens and other temporary structures for<br />
themselves in connections with the work at the site at their own cost after getting<br />
the approval from the Architect/ Consultant.<br />
b) A site office for the use of UBI/ the Architect/ Consultant shall be provided by the<br />
contractors at his own expenses.<br />
c) All temporary buildings and facilities as mentioned above shall be removed on<br />
completion of the work or at any other earlier date as directed by the contractors.<br />
38<br />
All the expenses for obtaining statutory approvals and maintenance of the above<br />
facilities as wall as running expenses shall be borne by the contractor at no extra<br />
cost. It is also the responsibility of the contractor to obtain statutory approvals for<br />
providing the above facilities<br />
9.0 Facilities for Contractor’s employees:<br />
The contractor shall make his own arrangement for the housing and welfare of<br />
his staff and workmen including adequate drinking water facilities. The contractor<br />
shall also make the arrangement at his own cost for transport where necessary<br />
for his staff and workmen to and from site of work at his own cost.<br />
10.0 Lighting of works:<br />
The contractors shall at all times provide adequate and approved lighting as<br />
required for the proper execution and supervision and inspection of work.<br />
11.0 Fire fighting arrangements:<br />
i) The contractor shall provide suitable arrangement for fire fighting at his own cost.<br />
For this purpose he shall provide requisite number of fire extinguishers and<br />
adequate number of buckets, some of which are to be always kept filled with<br />
sand and some with water. These equipments shall be provided at suitable<br />
prominent and easily accessible places and shall be properly maintained.<br />
ii) Any deficiency in the fire safety or unsafe conditions shall be corrected the<br />
contractor at his own cost and to the approval of the relevant authorities. The<br />
contractor shall make the following arrangements at his own cost but not limited<br />
to the following.<br />
a) Proper handling, storage and disposal of combustible materials and waste.<br />
b) Work operations which can create fire hazards<br />
.<br />
c) Access for fire fighting equipments.<br />
d) Type, number and location of containers for the removal of surplus materials and<br />
rubbish.<br />