Hibernia Southern Extension<br />

<strong>Project</strong> <strong>Safety</strong> <strong>Challenges</strong><br />

Glenn Addison<br />

<strong>Project</strong> Manager<br />

June 29, 2011


Partner Selection – Key to <strong>Safety</strong> Success<br />

HSE Contractors:<br />

– GBS Topsides<br />

– Subsea Equipment Supply<br />

– Dredging of Excavated Drill Centre<br />

– Pipeline, Umbilical, & Subsea Installation<br />

– Platform Drilling<br />

MODU Drilling Contractor – Subsea Drilling<br />

2


All projects have their unique set of SSHE challenges….<br />

• High intensity offshore campaign work<br />

- Short term<br />

- Potential for high consequence events<br />

- New vessels & crews<br />

• Existing safety culture<br />

Congested Deck Space<br />

• Offshore weather – limited windows<br />

Deep Pioneer Technip Vessel<br />

3


All projects have their unique set of SSHE challenges….<br />

• Brownfield Work on Hibernia Platform<br />

- Existing operating facility<br />

- Competing priorities<br />

- High level of activity<br />

- Maintaining a single consistent<br />

safety approach for the platform<br />

- Simultaneous operations<br />

- POB limit<br />

• 2011 Early Dive Program<br />

- Limited to GBS J-tube preparation<br />

- Remainder of project designed for<br />

diverless installation<br />

- Shared program with offshore loading<br />

system replacement<br />

- Tanker loading simultaneous operations<br />

Hibernia Platform<br />

J-tube Bridge Structure & Bell Mouth<br />

4


All projects have their unique set of SSHE challenges….<br />

• NL onshore activities<br />

- Selection of fabrication, shore base,<br />

& supply subcontractors<br />

- Working with HSE contractors to support<br />

improved subcontractor safety performance<br />

- Consistent approach for all ExxonMobil work<br />

in NL<br />

• Drilling<br />

- Maintaining & continuing to improve platform<br />

performance<br />

- Selection of MODU contractor with shared<br />

safety vision<br />

- Engagement with MODU contractor prior to<br />

mob. to meet safety expectations from day one<br />

Fabrication Yard<br />

MODU Rig<br />

5


Successful <strong>Safety</strong> Partnerships Key to Success<br />

The Team and Partner of Choice for Flawless Execution of a Legacy <strong>Project</strong><br />

High Performance Team<br />

Partner of Choice<br />

Flawless Execution<br />

• One Team with Common Goals<br />

• Belief in Nobody Gets Hurt<br />

• Respectful, Caring, & Helpful<br />

• Everyone is a Leader<br />

• Recognition of Success<br />

• Contractors Essential to Success • Nobody Gets Hurt<br />

• Foundation of Trust Mutual Respect • No Spills<br />

• Understanding Needs & Goals<br />

+ = • Minimize Environmental Impacts<br />

• Transparent Honest Communication<br />

• Relationships at Multiple Levels<br />

• Meeting Commitments<br />

Nobody Gets Hurt<br />

6