FERC Standards of Conduct Training - CenterPoint Energy
FERC Standards of Conduct Training - CenterPoint Energy
FERC Standards of Conduct Training - CenterPoint Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
What is Contemporaneous Disclosure?<br />
MFEs may only have access to information that is available<br />
to all current and potential customers.<br />
If EGT or MRT discloses non-public transmission function<br />
information to an MFE, the disclosed information must be<br />
reported to the Chief Compliance Officer (<strong>FERC</strong>) for<br />
immediate posting. The facts <strong>of</strong> this disclosure and the<br />
information disclosed must be included in a posting on the<br />
pipeline's Internet website.<br />
If EGT or MRT discloses non-public customer information<br />
to an MFE, the disclosed information must be reported to<br />
the Chief Compliance Officer (<strong>FERC</strong>) for an immediate<br />
posting on the pipeline's Internet website. The fact that the<br />
disclosure occurred must be posted, but not the content <strong>of</strong><br />
the disclosure.<br />
34<br />
For Internal Use Only