15.01.2014 Views

FERC Standards of Conduct Training - CenterPoint Energy

FERC Standards of Conduct Training - CenterPoint Energy

FERC Standards of Conduct Training - CenterPoint Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

What is Contemporaneous Disclosure?<br />

MFEs may only have access to information that is available<br />

to all current and potential customers.<br />

If EGT or MRT discloses non-public transmission function<br />

information to an MFE, the disclosed information must be<br />

reported to the Chief Compliance Officer (<strong>FERC</strong>) for<br />

immediate posting. The facts <strong>of</strong> this disclosure and the<br />

information disclosed must be included in a posting on the<br />

pipeline's Internet website.<br />

If EGT or MRT discloses non-public customer information<br />

to an MFE, the disclosed information must be reported to<br />

the Chief Compliance Officer (<strong>FERC</strong>) for an immediate<br />

posting on the pipeline's Internet website. The fact that the<br />

disclosure occurred must be posted, but not the content <strong>of</strong><br />

the disclosure.<br />

34<br />

For Internal Use Only

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!