Building Control Regulations Part 2<br />
2.1.5.2 The minimum qualification for an Assistant Building Inspection Officer who<br />
will be assisting the Building Inspection Officer and carrying out <strong>building</strong><br />
inspection work shall be:<br />
a) Ordinary diploma, or its equivalent, in one or more of the following<br />
disciplines;<br />
i. Architecture<br />
ii. Building Construction<br />
iii. Civil Engineering<br />
iv. Structural Engineering<br />
b) A minimum of three years continuous employment in the construction<br />
industry.<br />
2.1.6 Standardisation of Interpretation<br />
2.1.6.1 Where so requested in writing by the Committee or by the owner of any<br />
<strong>building</strong> or any person having an interest therein, the Review Board shall<br />
examine the plans, specifications and other documents accompanying or<br />
intended to accompany any <strong>building</strong> application to the Committee, perform<br />
any tests considered to be necessary and inspect the site on which such<br />
<strong>building</strong> is to be erected, and shall issue a report in connection therewith.<br />
2.1.6.2 Where the Review board has found the proposed <strong>building</strong> to comply with all<br />
the relevant requirements of these Regulations it shall make its findings<br />
known accordingly, and any application for approval to erect such <strong>building</strong><br />
where accompanied by the report from the Review Board, shall be deemed<br />
to satisfy the requirements of the Order.<br />
2.1.7 Design Work in Progress<br />
2.1.7.1 Where modifications on design work for <strong>building</strong> operations had<br />
commenced and significantly progressed before the date of operation of<br />
these Regulations the owner of such <strong>building</strong> operations shall notify the<br />
Committee in writing of his intention to proceed with any previously granted<br />
Building Permit prior to the expiry of the period determined by the<br />
Committee.<br />
2.1.7.2 The owner shall deliver such notification under Article 2.1.7.1 of these<br />
Regulations by registered post within 90 days from the date of<br />
commencement of these Regulations, giving the following information:<br />
a) Name and address of the owner;<br />
b) Plot reference number;<br />
c) Name and address of the designer,<br />
d) Date of commencement of such modification design work;<br />
e) Stage of the modification on design work at the date of application of<br />
these Regulations;<br />
f) Description of the proposed <strong>building</strong> operations; and<br />
g) Intended use of the <strong>building</strong>.<br />
2.1.7.3 The Committee shall acknowledge receipt of such notification and shall revalidate<br />
the existing <strong>building</strong> permit.<br />