Reliability of Stockholm Subway - Index of
Reliability of Stockholm Subway - Index of
Reliability of Stockholm Subway - Index of
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.4 Assumptions and limitations<br />
The main limitation <strong>of</strong> the analysis is that the database RUST will not be 100%<br />
accurate. Due to problems <strong>of</strong> different nature such as train misbehaving, disorder <strong>of</strong><br />
central system and etc., there is always a possibility that data is missing or inaccurate.<br />
This factor limits wide data application, for example, it cannot be a basis for the<br />
bonus payments according to the commercial agreements between SL and operators.<br />
However available collected data is enough to evaluate subway performance for the<br />
company‟s internal needs in order to reveal problematic track sections. The thesis<br />
assumes that the data in RUST database is reliable, accurate and reflects the real<br />
service.<br />
The performance <strong>of</strong> the subway constantly changes throughout the time. The thesis<br />
analyzes subway performance in March, 2010 during the most interesting and most<br />
problematic daytime period: from 6:30 till 19:00, which includes morning and<br />
evening peak hours as well as midday <strong>of</strong>f-peak. All the results in the thesis indicate<br />
the performance <strong>of</strong> the subway basing on this chosen time period.<br />
27