20.02.2014 Views

Reliability of Stockholm Subway - Index of

Reliability of Stockholm Subway - Index of

Reliability of Stockholm Subway - Index of

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.4 Assumptions and limitations<br />

The main limitation <strong>of</strong> the analysis is that the database RUST will not be 100%<br />

accurate. Due to problems <strong>of</strong> different nature such as train misbehaving, disorder <strong>of</strong><br />

central system and etc., there is always a possibility that data is missing or inaccurate.<br />

This factor limits wide data application, for example, it cannot be a basis for the<br />

bonus payments according to the commercial agreements between SL and operators.<br />

However available collected data is enough to evaluate subway performance for the<br />

company‟s internal needs in order to reveal problematic track sections. The thesis<br />

assumes that the data in RUST database is reliable, accurate and reflects the real<br />

service.<br />

The performance <strong>of</strong> the subway constantly changes throughout the time. The thesis<br />

analyzes subway performance in March, 2010 during the most interesting and most<br />

problematic daytime period: from 6:30 till 19:00, which includes morning and<br />

evening peak hours as well as midday <strong>of</strong>f-peak. All the results in the thesis indicate<br />

the performance <strong>of</strong> the subway basing on this chosen time period.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!