Grid North<br />
N<br />
<strong>Kristin</strong> - Subsea & export <strong>field</strong> layout<br />
22.7km 12" oil export (CS)<br />
Åsgard C<br />
P<br />
FORE<br />
FORE<br />
N-102/N-201<br />
P-101<br />
N-101<br />
P-211 Oil export<br />
Fibre optical cable (FOC - 26.4 km)<br />
To Åsgard<br />
FOC-1/B-401<br />
30km 18" <strong>gas</strong> export (CS)<br />
6km 10" ID prod. flow lines (13% Cr.)<br />
with direct electrical heating (DEH)<br />
Umbilical and<br />
3.5" ID service line<br />
S<br />
FORE<br />
S-103/S-201<br />
S-101<br />
P-102/P-201<br />
<strong>Kristin</strong><br />
Semi<br />
P-212 N<br />
P-212 S P-212 Gas export loop<br />
Pig direction<br />
16” check<br />
valve with 1”<br />
by pass line<br />
(ROV op.)<br />
16”<br />
Åsgard Transport P-121<br />
70 MSm3/day<br />
<strong>Kristin</strong><br />
Tee<br />
R-103/R-201<br />
R<br />
FORE<br />
S-102<br />
R-101<br />
R-102<br />
Maximum Gas production rate, each well<br />
Maximum Gas production rate, each flow line<br />
Initial maximum wellhead shut-in pressure<br />
Maximum expected wellhead flowing temperature<br />
4.5 MSm 3 /sd<br />
7.0 MSm 3 /sd<br />
740 bara<br />
152° C<br />
10" ID prod (13% Cr.) w/ DEH<br />
12" oil export (CS)<br />
18" <strong>gas</strong> export (CS)<br />
Umbilical w/ 2" ID centre line<br />
3.5“ ID service line (CS)<br />
Fibre optical cable (FOC)<br />
Direct el. heating (DEH) risers<br />
Future tie-in hub<br />
SSIV<br />
ROV operated ball valve<br />
Check valve<br />
Diverless hot tap tee<br />
Temporary pig launcher<br />
Q<br />
10 - Classification: FORE Internal 2010-11-10<br />
Worst case wellhead flowing temperature<br />
Inlet separator pressure<br />
162° C<br />
72-90 bar