06.03.2014 Views

Kristin HPHT gas-condensate field

Kristin HPHT gas-condensate field

Kristin HPHT gas-condensate field

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kristin</strong> Field Data<br />

• Subsea development: 12 wells on 4 templates<br />

• Drainage strategy is depletion<br />

• Gas-<strong>condensate</strong> with 4% CO2<br />

• Initial GOR ~ 1000 Sm³/Sm³<br />

• GIIP ~80 GSm 3<br />

CIIP ~80 MSm 3<br />

• Initial pressure 910 bar, 170°C<br />

• Dew point ~400 bar<br />

• The most extreme high-pressure<br />

high-temperature (<strong>HPHT</strong>)<br />

<strong>field</strong> in Norway<br />

• CAPEX 22 BNOK<br />

(10 for semi and 12 for wells)<br />

Capacity: 70 MSm 3 /D<br />

5- Classification: Internal 2010-11-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!