20.03.2014 Views

Technical Rider Hell on Earth - Key Performance

Technical Rider Hell on Earth - Key Performance

Technical Rider Hell on Earth - Key Performance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONSTANZA MACRAS | DORKYPARK - “HELL ON EARTH” PAGE8of10<br />

TECHNICAL REQUIREMENTS<br />

TECHNICAL STAFF<br />

Any change to this schedule has to be discussed immediately with the company<br />

This schedule assumes that <strong>on</strong> our arrival:<br />

- the floor is levelled<br />

- all required lighting and sound equipment is in the theatre<br />

- soft goods and hanging hardware are available<br />

- in warehouses (etc.) the platform and a grid is already build<br />

- a local experienced crew is available<br />

As a crew for the load in and initial c<strong>on</strong>structi<strong>on</strong> of the set we will need:<br />

- 1 head technician/facility manager at space to check lists, discuss producti<strong>on</strong> schedule,<br />

rentals. He should be present all the times the company is in the theatre.<br />

- 6 carpenters/riggers/fly men/props<br />

- 4 electricians<br />

- 2 sound technicians<br />

- 1 video technician (in additi<strong>on</strong> to sound staff)<br />

- 1 wardrobe pers<strong>on</strong><br />

As a running crew<br />

- 2 electrician familiar with the local lighting desk<br />

- 1 stage technician.<br />

- 1 sound tech. stand by<br />

- 1 video tech. stand by<br />

- 2 wardrobe pers<strong>on</strong>s<br />

To Strike and load out:<br />

- 6 stage technicians<br />

- 2 sound technicians<br />

N.B.:<br />

• During load in and out, a forklift is necessary.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!