<strong>Kitsap</strong> <strong>County</strong> May 9, 2005<br />

<strong>Coordinated</strong> <strong>Water</strong> <strong>System</strong> <strong>Plan</strong><br />

Regional Supplement 2005 Revision<br />

flow. Use of an existing seawater withdrawal and discharge structure saves on construction and<br />

permit costs. The higher inlet temperatures for desalination processing save on energy costs.<br />

Unfortunately, such power plants or large sea water cooling structures do not exist in or near<br />

<strong>Kitsap</strong> <strong>County</strong> and sea water temperatures in the Puget Sound region are much lower than areas<br />

where desalination plants are currently being built. These factors, plus availability of much less<br />

costly water supply alternatives, make desalination less attractive in this region compared to<br />

areas such as Florida and Southern California.<br />

Based upon a review of professional journal articles related to desalination, combined<br />

operational and amortized capital costs for brackish water treatment plants producing between<br />

1.06 and 10.6 million gallons per day range from $2.85 to $11.35 per million gallons (MG) of<br />

water produced. Seawater desalination plants were reported to cost $11,367 to $2,839 per MG of<br />

potable water produced.<br />

Based upon cost figures for a desalination plant in Sand City, California, capital costs for a<br />

desalination facility in the Pacific Northwest are estimated to be approximately $10,000,000 per<br />

mgd. Annual O&M costs are estimated to be on the order of $500,000 per mgd. The<br />

significantly higher O&M costs are related primarily to power requirements.<br />

Appendix J Section J8 – Key Findings J8-2