2006-07 - Construction Innovation
2006-07 - Construction Innovation
2006-07 - Construction Innovation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROGRAM B: SUSTAINABLE BUILT ASSETS<br />
Indoor Air Quality Estimator<br />
Research project 2004-033-B<br />
Project duration: 1 February <strong>2006</strong>–31 May 20<strong>07</strong><br />
Project leader: Selwyn Tucker, CSIRO<br />
Project members: Brisbane City Council: Medha Gokhale,<br />
Dean Morse<br />
CSIRO: Steven Brown, David Johnson, Antony Mikulic, Stephen<br />
Egan, Angela Williams<br />
Queensland Department of Public Works: Dale Gilbert, Alan Sharp<br />
QUT: Lidia Morawska, Hai Guo<br />
Woods Bagot: David Marchant, Trudy-Ann King, John Flynn<br />
This project has developed a prototype<br />
software tool for estimating indoor<br />
air quality in commercial buildings by<br />
combining existing indoor air quality<br />
measurement, product emission and<br />
ventilation/filtration knowledge into a<br />
practical model for estimating the indoor<br />
air quality of indoor spaces over time. The<br />
potential implementations of the model<br />
include both a stand alone tool or as a<br />
commercial extension module attached<br />
Selwyn Tucker<br />
to a 3D CAD evaluation package such as<br />
LCADesign. This approach will integrate three aspects of buildings<br />
affecting indoor quality: emissions from fixed large surface products,<br />
including furniture; operational activities such as equipment including<br />
computers and printers; and air intakes from outside a building.<br />
The City of Melbourne’s Council House 2 (CH2) project is the first purpose —<br />
built office building in Australia to achieve the six Green Star certified rating.<br />
CH2 features sustainable such as a water-mining plant in the basement,<br />
phase-change materials for cooling, automatic night-purge windows, wavy<br />
concrete ceilings, a façade of louvres (powered by photovoltaic cells) that<br />
track the sun. © City of Melbourne.<br />
Table 3: Program B research outputs and/or milestones<br />
Output/milestone<br />
number<br />
Description<br />
Contracted<br />
achievement date<br />
Achieved<br />
(Yes or No)<br />
Reasons why not<br />
achieved<br />
(if applicable)<br />
Strategies to<br />
achieve unmet<br />
milestones<br />
Outcome 1<br />
Informing policy –<br />
sustainability<br />
principles operating<br />
in BCA<br />
December <strong>2006</strong><br />
Yes<br />
Outcome 3<br />
Improved human<br />
and environmental<br />
health – legionella<br />
eliminated as a<br />
public health risk<br />
June 20<strong>07</strong><br />
No<br />
Research<br />
Committee reviewed<br />
the milestone in light<br />
of issues such as<br />
liability and lack of<br />
critical equipment.<br />
Air quality<br />
surveys are being<br />
undertaken as part<br />
of project<br />
2003-028-B and<br />
a prototype indoor<br />
air quality estimator<br />
tool has been<br />
developed.<br />
30