29.03.2014 Views

2006-07 - Construction Innovation

2006-07 - Construction Innovation

2006-07 - Construction Innovation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROGRAM B: SUSTAINABLE BUILT ASSETS<br />

Indoor Air Quality Estimator<br />

Research project 2004-033-B<br />

Project duration: 1 February <strong>2006</strong>–31 May 20<strong>07</strong><br />

Project leader: Selwyn Tucker, CSIRO<br />

Project members: Brisbane City Council: Medha Gokhale,<br />

Dean Morse<br />

CSIRO: Steven Brown, David Johnson, Antony Mikulic, Stephen<br />

Egan, Angela Williams<br />

Queensland Department of Public Works: Dale Gilbert, Alan Sharp<br />

QUT: Lidia Morawska, Hai Guo<br />

Woods Bagot: David Marchant, Trudy-Ann King, John Flynn<br />

This project has developed a prototype<br />

software tool for estimating indoor<br />

air quality in commercial buildings by<br />

combining existing indoor air quality<br />

measurement, product emission and<br />

ventilation/filtration knowledge into a<br />

practical model for estimating the indoor<br />

air quality of indoor spaces over time. The<br />

potential implementations of the model<br />

include both a stand alone tool or as a<br />

commercial extension module attached<br />

Selwyn Tucker<br />

to a 3D CAD evaluation package such as<br />

LCADesign. This approach will integrate three aspects of buildings<br />

affecting indoor quality: emissions from fixed large surface products,<br />

including furniture; operational activities such as equipment including<br />

computers and printers; and air intakes from outside a building.<br />

The City of Melbourne’s Council House 2 (CH2) project is the first purpose —<br />

built office building in Australia to achieve the six Green Star certified rating.<br />

CH2 features sustainable such as a water-mining plant in the basement,<br />

phase-change materials for cooling, automatic night-purge windows, wavy<br />

concrete ceilings, a façade of louvres (powered by photovoltaic cells) that<br />

track the sun. © City of Melbourne.<br />

Table 3: Program B research outputs and/or milestones<br />

Output/milestone<br />

number<br />

Description<br />

Contracted<br />

achievement date<br />

Achieved<br />

(Yes or No)<br />

Reasons why not<br />

achieved<br />

(if applicable)<br />

Strategies to<br />

achieve unmet<br />

milestones<br />

Outcome 1<br />

Informing policy –<br />

sustainability<br />

principles operating<br />

in BCA<br />

December <strong>2006</strong><br />

Yes<br />

Outcome 3<br />

Improved human<br />

and environmental<br />

health – legionella<br />

eliminated as a<br />

public health risk<br />

June 20<strong>07</strong><br />

No<br />

Research<br />

Committee reviewed<br />

the milestone in light<br />

of issues such as<br />

liability and lack of<br />

critical equipment.<br />

Air quality<br />

surveys are being<br />

undertaken as part<br />

of project<br />

2003-028-B and<br />

a prototype indoor<br />

air quality estimator<br />

tool has been<br />

developed.<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!