16.04.2014 Views

PDF File

PDF File

PDF File

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Phase 1 – Pumping Station Design<br />

Valve Vault Piping<br />

• Install all piping in<br />

valve vault for future needs<br />

• Installing future piping in<br />

other wet well is optional<br />

• If pump discharge piping<br />

and pump bases are<br />

installed in future wet well,<br />

size for largest future pump<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!