understanding that the compensation is contingent upon a successful acquisition. Staff recommended<br />

approval of CA 8.<br />

CAg Approval of Work Authorization No. PRMG L2-O3 with Public Resources Management Group<br />

for Financial Due Diligence activitíes related to the Acquisition of Several Private Utilities<br />

Located in Marion County<br />

Provided for the Board's review and consideration was Work Authorization No. PRMG 12-03 with Public<br />

Resources Management Group (PRMG) to provide financial due diligence services related to several private<br />

utility systems located in Marion County, <strong>Florida</strong>. On December 20, 2OIt, the Marion County Board of<br />

County Commissioners approved a resolution authorizing the <strong>FGUA</strong> to explore the potential acquisition of the<br />

privately owned utility systems. Compensation will be on a time and materials basis up to the not-to-exceed<br />

amount of $224,OO0. As usual, the due diligence efforts will be on an,r,iiat-risk" basis wíth the understanding<br />

thatthe compensation is contingent upon a successful acquisition,,:H.oÍ,vever, since it is possible thatsome,<br />

but not all of the eight (8) systems will be purchased, the work authoiization contemplates that the minimum<br />

fee due to PRMG if only a portion of the systems are purchased byrthe <strong>FGUA</strong> would be $l-50,000. However,<br />

as a practical matter, ít is highly unlikely that we would pto-ceed to a,oquire only a small number of small<br />

systems given the potential transaction cost. Staff recornr,nended approvã!.,of CA 9.<br />

CA 10 Ratificatíon of Amendment No. 1 to Work Authorization No. GAI :tr2-01, with GAI Consultants,<br />

lnc. for Consulting Engineering Services, Leh¡gh Acres Tank Cleaning & lnspection, <strong>FGUA</strong><br />

Project No. LE 084 in the Lehigh Acres Utility System<br />

On October 20,2}1-tthe <strong>FGUA</strong> Board apþróVeO Work Authorization No. GAI 12-01 with GAI Consultants, lnc.<br />

for the cleaning and inspection of the finishédlWáter Ground Storage Tanks (GSTs) in the Lehigh Acres Utility<br />

System. Prior to the inspection of the GSTêi;,sédiment was removed from the tanks. The cleanings and<br />

inspections went well with the exception oft;t,',lh;.g. Lehti¿hi,,;6gv¿s WTF- Np. 2 - 2.O MGD GST which had a<br />

substantial amount of sedimentaliOn above théi:f,+cubic yàiid,:.,1:ii.tnili!1cludèd:'in Work Authorization No. GAI 12-<br />

01. There was approx¡matèly 3r.,inches (lOoîlöuþic yli,¡Qí)::',t;øf;rsedimént that required removal. This<br />

amendment covers the adàitional coSts"associatëä',,withi.1:.tlte remôvái. Staff recommended approval of CA<br />

10. .,.,..ì ;: ,i ,<br />

cA 11<br />

. .<br />

.,al<br />

'z:"t:":tl:l<br />

Provided tor t'ne:;noard's reviewiân4|'+onsidè,tqiipn was Amendment No. 1to Work Authorization No. USWWT<br />

t2-O1, with U.S."îVli,;áþr/Wade tr¡r i[,,provide operations due diligence services for acquisition of the Mad<br />

Hatter Utility, lnc. äéliéts located in Þaöco Couniy. Amendment No. l adjusts the not-to-exceed fees included<br />

in the work authorizalión1,:,flom $87,j:26t65 to $116,988.75. The adjustment in the compensation is due to<br />

changes in the underlyingi:iwork effort,ässumptions based upon the on-going (extended) negotiations and<br />

discussions regarding fne M,âd:t$9frçj;léystem. Due to the on-going process, USWWT has incurred additional<br />

due diligence responsibilities'''(i#: 9Í;lhours). These expenditures will be funded by bond,/loan proceeds with<br />

the understanding that the fees'ãfe contingent upon a successful acquisition. Staff recommended approval<br />

of CA 11.<br />

CAL2 Approval of Access Easement Agreement between the <strong>FGUA</strong> and Little Richey, LLC related to<br />

<strong>FGUA</strong> Project No. PS - 026, Water lnterconnects and lmprovements, Pasco Utility System<br />

Provided for the Board's review and consideration was an Access Easement Agreement between the <strong>FGUA</strong><br />

and Little Richey, LLC related to <strong>FGUA</strong> Project No. PS - 026, Water lnterconnects and lmprovements, Pasco<br />

Utility System. ln August of 2OtL, the Board approved the conveyance of the five (5) potable water<br />

interconnects constructed under <strong>FGUA</strong> project No. PS - 026 to Pasco County, including easements, where<br />

applicable, granting access rights to Pasco County. One of the five (5) interconnects, however, was located<br />

within an existing easement previously granted to Pasco County by the property owner, Little Richey, LLC.,<br />

February 23,2Ot2 <strong>FGUA</strong> Regular Meeting Minutes<br />

5ofL2