20.04.2014 Views

MT-4E Analog and P25 Digital Radio Systems - Daniels Electronics

MT-4E Analog and P25 Digital Radio Systems - Daniels Electronics

MT-4E Analog and P25 Digital Radio Systems - Daniels Electronics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2: Installation 5<br />

CHAPTER 2: INSTALLATION<br />

INSTALLATION OF DANIELS SUBRACK<br />

1. Ensure the 19” rack has enough room for the <strong>Daniels</strong> subrack to be installed. Each <strong>Daniels</strong> subrack<br />

requires 5 1/4” height (3 RU) <strong>and</strong> 13.5” (maximum) depth clearances.<br />

2. Install the subrack unit(s) in the 19” rack using four #10 x 3/4” screws as shown in Figure 2-1. Eight<br />

screw holes are available, only four screws are required to mount the subrack properly. Use stainless<br />

steel screws if the equipment is to be placed in a corrosive environment.<br />

#10 x 3/4”<br />

screws<br />

Figure 2-1: Subrack Installation<br />

MG-001 <strong>Daniels</strong> <strong>MT</strong>-<strong>4E</strong> <strong>Radio</strong> <strong>Systems</strong><br />

www.danelec.com<br />

Maintenance<br />

Guide

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!