30.04.2014 Views

IMO Resolution A.741

IMO Resolution A.741

IMO Resolution A.741

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.15.2 Personnel participating in the verification are responsible for complying with<br />

therequirements governing the verification, ensuring confidentiality of documents pertaining<br />

tothe certification and treating privileged information with discretion.<br />

4.16 Forms of DOC and SMC<br />

The DOC, SMC and Interim DOC and Interim SMC should be drawn up in the form<br />

corresponding to the models given in appendix 2 to these Guidelines. If the language used<br />

is neither English or French, the text should include a translation into one of these<br />

languages.<br />

----------------------------------------------------------------------------<br />

NV Seminar 2001 - ISM - Code -Annex <strong>A.741</strong><br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!