16.05.2014 Views

terms of reference tor # mempcj201006037re - Petroleum ...

terms of reference tor # mempcj201006037re - Petroleum ...

terms of reference tor # mempcj201006037re - Petroleum ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3 SCOPE OF THE CONSULTING ASSIGNMENT<br />

3.1 GENERAL<br />

The <strong>Petroleum</strong> Corporation <strong>of</strong> Jamaica (PCJ) has decided to conduct hydropower feasibility<br />

studies for five (5) additional rivers with a view to mobilizing private sec<strong>tor</strong> investments for<br />

those projects which are deemed cost-effective. Run <strong>of</strong> the river hydropower schemes are<br />

the favoured approach but other designs (including pumped water s<strong>tor</strong>age systems) may also<br />

be considered.<br />

The feasibility studies shall in particular assess the technical, social and environmental,<br />

economic and financial fac<strong>tor</strong>s.<br />

A Consulting Firm shall be selected to carry out studies for the following five sites whose<br />

general locations are shown in Chart 2:<br />

Table 4. Feasibility Study Sites<br />

River<br />

Mahogany Vale<br />

Negro<br />

Rio Cobre<br />

Martha Brae<br />

Morgan’s<br />

Parish<br />

St. Thomas<br />

St. Thomas<br />

St. Catherine<br />

Trelawny<br />

Westmoreland<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!