terms of reference tor # mempcj201006037re - Petroleum ...
terms of reference tor # mempcj201006037re - Petroleum ...
terms of reference tor # mempcj201006037re - Petroleum ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3 SCOPE OF THE CONSULTING ASSIGNMENT<br />
3.1 GENERAL<br />
The <strong>Petroleum</strong> Corporation <strong>of</strong> Jamaica (PCJ) has decided to conduct hydropower feasibility<br />
studies for five (5) additional rivers with a view to mobilizing private sec<strong>tor</strong> investments for<br />
those projects which are deemed cost-effective. Run <strong>of</strong> the river hydropower schemes are<br />
the favoured approach but other designs (including pumped water s<strong>tor</strong>age systems) may also<br />
be considered.<br />
The feasibility studies shall in particular assess the technical, social and environmental,<br />
economic and financial fac<strong>tor</strong>s.<br />
A Consulting Firm shall be selected to carry out studies for the following five sites whose<br />
general locations are shown in Chart 2:<br />
Table 4. Feasibility Study Sites<br />
River<br />
Mahogany Vale<br />
Negro<br />
Rio Cobre<br />
Martha Brae<br />
Morgan’s<br />
Parish<br />
St. Thomas<br />
St. Thomas<br />
St. Catherine<br />
Trelawny<br />
Westmoreland<br />
11