Task 5- An overall implementation plan which identifies the key steps, decisions and<br />
actions needed to implement the various recommendations <strong>of</strong> the study.<br />
Task 6 – The Consultant shall allow for capacity building and transfer <strong>of</strong> knowledge<br />
to PCJ, MEM staff and a group <strong>of</strong> 20 to 25 tertiary students from the University <strong>of</strong><br />
the West Indies (UWI) and the University <strong>of</strong> Technology (UTECH) by allowing<br />
these personnel to shadow all aspects <strong>of</strong> their on-site or <strong>of</strong>f sites activities so as to<br />
build effective hydropower development know how in three areas: hydropower<br />
scheme design, socio-environmental impact analysis and basic economic and<br />
financial analysis. The Consultants is required to answer pertinent questions from<br />
staff <strong>of</strong> the PCJ or MEM or from the tertiary students from UWI and UTECH: on<br />
hydro power feasibility studies; hydropower design; socio-environmental impact<br />
analysis and; hydropower project economic and financial analysis.<br />
4 CONSULTING TEAM<br />
4.1 GENERAL<br />
The successful candidate for this consultancy hereinafter referred to as “the Consultant”,<br />
will be a firm. Bids from individuals will not be considered. The assigned Consultant<br />
project team must possess expertise in mechanical, electrical, civil, structural,<br />
hydropower, topographical and geotechnical engineering, environmental and social<br />
impact assessments and management plans and in project economic and financial<br />
analysis. The team should have a proven track record <strong>of</strong> conducting feasibility studies for<br />
small hydropower projects.<br />
The Consultant may contract local companies to carry out certain components <strong>of</strong> the<br />
works, such as but not limited to geotechnical, and topographical work.<br />
4.2 INDICATIVE LIST OF EXPERTISE REQUIRED<br />
The following indicative list <strong>of</strong> experts is proposed: The consultant is fully responsible<br />
for the selection <strong>of</strong> the expertise required to satisfac<strong>tor</strong>ily carry out the contractual<br />
obligations.<br />
1. Team Leader experienced in small hydros implemented by private sec<strong>tor</strong> sponsors<br />
2. Hydrology Specialist<br />
3. Civil/Structural and Hydraulic Expert<br />
19