Provide the base case estimate <strong>of</strong> the annual project output (firm and average<br />

capacity and energy) over the project life/duration <strong>of</strong> the Power Purchase<br />

Agreement (PPA) , and higher and lower bounds.<br />

Estimate the reduction <strong>of</strong> greenhouse gas reduction estimate throughout the life <strong>of</strong><br />

the project<br />

Carry-out an-environmental and social impact assessment and a mitigation plans in<br />

compliance with the ESEE Project Environmental Management Framework and the<br />

Involuntary Resettlement Policy Framework, survey community interest groups<br />

regarding their use <strong>of</strong> water use practices.<br />

Carry out a project economic analysis (Jamaica’s perspective) and a financial<br />

analysis (project owners’ perspective) including capital, operating and<br />

maintenance costs and revenue streams required for cost recovery and return, and<br />

financing plans. The analysis shall consider private sec<strong>tor</strong> arrangements for the<br />

construction and/or operation <strong>of</strong> the hydropower scheme through concessions under<br />

Design, Build, Operate and Own (DBOO). The Consultant shall recommend a<br />

capital structure required to finance and implement the new hydro facility. Local<br />

and overseas partnerships shall be considered.<br />

Determine the best organizational and institutional arrangements for hydropower<br />

management and ownership over the concession period.<br />

.Provide knowledge transfer to PCJ and MEM Staff and tertiary students from the<br />

University <strong>of</strong> the West Indies and the University <strong>of</strong> Technology as it relates to basic<br />

small hydro power design, environmental considerations and basic financial<br />

analyses.<br />

3.5 PHASE I KEY ACTIVITIES<br />

The following paragraphs highlight key activities and products expected from the<br />

Consultant. It is however the responsibility <strong>of</strong> the consultant to define and carry out all<br />

activities necessary to ensure quality and timely delivery <strong>of</strong> the studies.<br />

<br />

Task 1 - A hydrological report shall be prepared based on previous hydrological<br />

analyses and additional data relevant to the site shall be collected from the<br />

relevant government agencies. His<strong>tor</strong>ical flow data obtained from previous studies<br />