Examine existing prefeasibility and feasibility studies and other data when<br />

available (The documentation available at CERE’s Library or data room is<br />

provided in Annex 1). Review the investments as previously proposed and revise<br />

the proposed configuration to reflect one that would be competitive, given the<br />

current electricity market and tariff structures.<br />

Conduct preliminary site investigations including hydrological, topographical,<br />

geological and geotechnical studies.<br />

Develop preliminary layouts <strong>of</strong> hydraulic structures, electro-mechanical and<br />

electrical equipment and do selection <strong>of</strong> the main project characteristics such as<br />

installed capacity, energy production, capacity fac<strong>tor</strong>, etc.<br />

Develop preliminary cost estimates based on major quantities and cost items.<br />

Identify potential socio and environmental impacts, and proposed solutions.<br />

Carry out/update the project economic and financial analysis at pre-feasibility<br />

level.<br />

Highlight the main risks facing the project, and possible mitigation measures.<br />

This information will be included in the Consultant’s pre-feasibility report for each<br />

site to be reviewed by PCJ, MEM and the World Bank.<br />

3.4 PHASE II: SCOPE OF THE CONSULTING ASSIGNMENT<br />

Following PCJ’s instruction to proceed with the feasibility study, the Consultant shall<br />

carry out the following Phase II activities:<br />

Continue site investigation works on the sites including major geotechnical<br />

investigations.<br />

Define all key structures and equipment in sufficient detail to obtain quantities for<br />

all items contributing more than about 10% <strong>of</strong> the cost <strong>of</strong> structures and<br />

equipment.<br />

Provide a detailed initial cost estimate for: (i) the initial capital costs including<br />

access roads, transmission interconnection(s) to the grid; (ii) the implementation<br />

<strong>of</strong> the environmental and social management plans; and for (iii) the operations<br />

and maintenance <strong>of</strong> the proposed facilities.<br />