Chart 2. Location <strong>of</strong> Installed, Proposed and Potential Hydro Power Sites in<br />
Jamaica<br />
The consulting firm shall be selected using quality and cost based selection criteria<br />
following World Bank Procurement Guidelines.<br />
3.2 MAIN OBJECTIVE OF THE STUDIES<br />
The main objective <strong>of</strong> the hydropower feasibility studies is to ensure that technically,<br />
environmentally, socially and financially viable hydropower developments may be<br />
recommended for financing, private sec<strong>tor</strong> involvement and connection to the national grid.<br />
For each site the Consultant will be expected to recommend the appropriate investment<br />
(size, expected output, initial capital cost, interconnection to the grid, etc.), operational rules,<br />
organizational structures, revenue requirements, government incentives as appropriate<br />
,environmental and social management plans, to assess the economic and social benefits for<br />
Jamaica, and to carry out a financial analysis from the opera<strong>tor</strong>’s perspective and to propose<br />
measures to manage the various risks.<br />
The feasibility study for each hydro site shall be carried out in two (2) phases.<br />