<strong>Flood</strong> <strong>Risk</strong> <strong>Assessment</strong> – South Clyde Energy Centre, Glasgow<br />

During the site visit 6 , it was seen that water within the channel was generally<br />

stagnant with little obvious flow. The only outlet from this section of open<br />

channel appeared to be via a 450mm culvert located approximately half way<br />

along the channel length (see Figure 4 and Figure 6). The 450mm culvert<br />

conveys flows north across the site and connects into a 1,200mm public<br />

surface water sewer (manhole number 7701). The 1,200mm sewer then runs<br />

northeast under the site towards the River Clyde.<br />

A 375mm public surface water sewer is shown in <strong>Appendix</strong> E and Figure 4 to<br />

connect with the 450mm culvert near the offtake from the open channel. This<br />

pipe was not seen during the site visit, so it is believed to run under the open<br />

channel into the 450mm culvert, rather than outfalling into the channel itself.<br />

Figure 5: Unnamed Watercourse<br />

Figure 6: Inlet to 450mm Culvert Under Site<br />

6 Undertaken on 14 January 2011<br />

©Weetwood<br />

www.weetwood.net<br />

7 1727 SCEC/FRA_Final v2.1<br />

14 May 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!