<strong>Peel</strong> Environmental Ltd<br />

<strong>Flood</strong> <strong>Risk</strong> <strong>Assessment</strong> – South Clyde Energy Centre, Glasgow<br />

2 SCOTTISH PLANNING POLICY<br />

2.1 SCOTTISH ENVIRONMENT PROTECTION AGENCY FLOOD MAP<br />

According to the latest SEPA flood map for this area (Figure 2), the site is<br />

located outside those areas defined as being at risk of flooding from rivers<br />

and/or the sea.<br />

Figure 2: SEPA <strong>Flood</strong> Map<br />

2.2 DEVELOPMENT AND FLOOD RISK<br />

The <strong>Risk</strong> Framework outlined in Scottish Planning Policy defines flood risk<br />

using the following three categories:<br />

1. Little or no risk – Annual probability of watercourse, tidal or coastal<br />

flooding is less than 0.1% (1:1000)<br />

2. Low to medium risk – Annual probability of watercourse, tidal or coastal<br />

flooding is in the range 0.1% - 0.5% (1:1000 – 1:200)<br />

3. Medium to high risk – Annual probability of watercourse, tidal or coastal<br />

flooding is greater than 0.5% (1:200)<br />

According to the SEPA flood map the site is considered to be at little or no risk<br />

of flooding from rivers and/or sea. This is discussed in more detail in Section<br />

3.<br />

©Weetwood<br />

www.weetwood.net<br />

3 1727 SCEC/FRA_Final v2.1<br />

14 May 2012