18.05.2014 Views

Appendix 8.1 Flood Risk Assessment - Peel

Appendix 8.1 Flood Risk Assessment - Peel

Appendix 8.1 Flood Risk Assessment - Peel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Peel</strong> Environmental Ltd<br />

<strong>Flood</strong> <strong>Risk</strong> <strong>Assessment</strong> – South Clyde Energy Centre, Glasgow<br />

3.5 ACCESS AND EGRESS<br />

Access to the site will be provided via Bogmoor Road to the north. Bogmoor<br />

Road lies outside any areas at risk of flooding from the River Clyde. It is<br />

considered unlikely that the unnamed watercourse to the west of the site<br />

would flood the area of Bogmoor Road to the extent and depths required to<br />

preclude access of egress for the site.<br />

Safe access and egress from the site may therefore be provided via Bogmoor<br />

Road.<br />

©Weetwood<br />

www.weetwood.net<br />

11 1727 SCEC/FRA_Final v2.1<br />

14 May 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!