W900KK-09-D-0006 - PEO STRI - U.S. Army
W900KK-09-D-0006 - PEO STRI - U.S. Army
W900KK-09-D-0006 - PEO STRI - U.S. Army
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>W900KK</strong>-<strong>09</strong>-D-<strong>0006</strong><br />
Page 60 of 124<br />
8. QUALITY CONTROL REQUIREMENT.<br />
The contractor shall implement and maintain a quality control program. The program shall include inspection,<br />
validation, evaluation, corrective action and procedures necessary to achieve quality control. The adequacy of<br />
reports and documentation shall be the responsibility of the contractor. All quality control operations performed by<br />
the contractor shall be subject to U.S. Government verification. Verification shall consist of monitoring the<br />
operations to determine that the practices and methods of the contractor’s procedures are properly applied.<br />
Contractor conformance to the requirements of this PWS will be measured in accordance with the Quality<br />
Assurance Surveillance Plan (QASP).<br />
CLAUSES INCORPORATED BY FULL TEXT<br />
5152.211-5007 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (<strong>PEO</strong> <strong>STRI</strong>) (SEP<br />
2006)<br />
The Contractor's Technical Proposal, <strong>W900KK</strong>-08-R-0021 dated 14 October 20<strong>09</strong> and the Contractor’s<br />
Organizational Conflicts of Interest (OCI) Mitigation and Avoidance Plan dated 04 August 20<strong>09</strong>, and any<br />
amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same<br />
force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of<br />
the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause<br />
52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification."