M1 Junction 19 Improvement<br />

<strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> Designer’s <strong>Response</strong> /<br />

Exceptions Report<br />

Problem 5 - Capacity reduction of M1 – M6 Northbound Link.<br />

M1 – M6 Northbound Link.<br />

Problem<br />

The proposed modifications to the junction<br />

have reduced the number of lanes on the<br />

M1 – M6 Northbound Link from 3 lanes to<br />

2 lanes. Diverge arrangements remain<br />

similar on the M1 with no lane drop. The<br />

auditor is concerned that a reduction in the<br />

number of lanes on the M1 – M6<br />

Northbound Link could lead to capacity<br />

issues.<br />

Recommendation<br />

Provide an assessment of junction<br />

operation to address link capacity issues.<br />

Designer’s <strong>Response</strong><br />

Traffic surveys and traffic forecasting indicates that the existing, opening year and<br />

design year (15 years after opening) traffic flows do / will not require the provision of 3<br />

lanes on this link.<br />

Exception<br />

No exception required.<br />

Rev.:1<br />

7 Issued: February 2010