M1 Junction 19 Improvement<br />
<strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> Designer’s <strong>Response</strong> /<br />
Exceptions Report<br />
1 INTRODUCTION<br />
1.1.1 This report is the Designer’s <strong>Response</strong> and Exceptions Report resulting from the<br />
<strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> for the M1 Junction 19 Improvement Scheme carried out<br />
by Jacobs on the Preferred Route.<br />
1.1.2 The findings of the <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> are detailed within the report entitled “M1<br />
Junction 19 Improvement <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> <strong>Stage</strong> 1 June 2009, Original”.<br />
1.1.3 The <strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> review was carried out by:<br />
• John Barrell, BSC, CEng, MICE, FIHT, MSoRSA, MIRSO<br />
• Colin Wright, MSc, MEng, AMIHT<br />
• Vincent Holden, BA, MIHT, MILT<br />
• Laura Tweddle, MEng, GMICE, MIHT<br />
1.1.4 For details of the drawings and documents examined as part of the <strong>Audit</strong>, refer to the<br />
<strong>Stage</strong> 1 <strong>Audit</strong> Report - Paragraph 1.8.<br />
1.1.5 The findings and recommendations of the <strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> are summarised<br />
together with the Designer’s responses, which reflect the scheme design at July<br />
2009.<br />
1.1.6 Section 3 of this report concludes the Designer’s findings.<br />
Rev.:1<br />
1 Issued: February 2010