M1 Junction 19 Improvement<br />
<strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> Designer’s <strong>Response</strong> /<br />
Exceptions Report<br />
2.2 JUNCTIONS<br />
Problem 6 - Forward visibility on Shawell Lane approach<br />
Junction of Shawell Lane and Local Link <strong>Road</strong><br />
Problem<br />
The approach to the junction on Shawell<br />
Lane goes under the mainline M6 and then<br />
turns sharply to the right to provide a T<br />
junction arrangement with the Link <strong>Road</strong>.<br />
Visibility of this bend will be impaired by<br />
the underpass and alignment of the link<br />
road. This could result in vehicles<br />
attempting to go straight on instead of<br />
turning right.<br />
Recommendation<br />
Provide signage before the underpass<br />
giving warning of the approaching right<br />
hand bend and junction. Provide deflection<br />
and landscaping at the bend so that<br />
forward visibility of the link road alignment<br />
is reduced and vehicles naturally turn right.<br />
Designer’s <strong>Response</strong><br />
At the detailed design stage, the traffic signs and road markings design will be<br />
developed to include appropriate signage prior to the underpass to give warning of<br />
approaching right hand bend and junction. Deflection at the bend will also be provided<br />
through either landscape mounding and planting or appropriate traffic signs.<br />
Exception<br />
No exception required.<br />
Rev.:1<br />
8 Issued: February 2010