M1 Junction 19 Improvement<br />

<strong>Stage</strong> 1 <strong>Road</strong> <strong>Safety</strong> <strong>Audit</strong> Designer’s <strong>Response</strong> /<br />

Exceptions Report<br />

2.2 JUNCTIONS<br />

Problem 6 - Forward visibility on Shawell Lane approach<br />

Junction of Shawell Lane and Local Link <strong>Road</strong><br />

Problem<br />

The approach to the junction on Shawell<br />

Lane goes under the mainline M6 and then<br />

turns sharply to the right to provide a T<br />

junction arrangement with the Link <strong>Road</strong>.<br />

Visibility of this bend will be impaired by<br />

the underpass and alignment of the link<br />

road. This could result in vehicles<br />

attempting to go straight on instead of<br />

turning right.<br />

Recommendation<br />

Provide signage before the underpass<br />

giving warning of the approaching right<br />

hand bend and junction. Provide deflection<br />

and landscaping at the bend so that<br />

forward visibility of the link road alignment<br />

is reduced and vehicles naturally turn right.<br />

Designer’s <strong>Response</strong><br />

At the detailed design stage, the traffic signs and road markings design will be<br />

developed to include appropriate signage prior to the underpass to give warning of<br />

approaching right hand bend and junction. Deflection at the bend will also be provided<br />

through either landscape mounding and planting or appropriate traffic signs.<br />

Exception<br />

No exception required.<br />

Rev.:1<br />