A46 Newark to Widmerpool Improvement -Supplementary Orders<br />
<strong>Statement</strong> <strong>of</strong> <strong>Case</strong> <strong>August</strong> <strong>2011</strong><br />
5 Traffic Forecasting<br />
5.1 The traffic model prepared for the 2007 Public Inquiry was revised to include the<br />
Kinoulton amendments and the extra connection to the A606 Widmerpool junction<br />
that was a part <strong>of</strong> the 2010 Supplementary Orders. All <strong>of</strong> the other components <strong>of</strong><br />
the traffic model have remained the same. The subsequent modifications at the<br />
Farndon roundabout were too small to be represented in the traffic model.<br />
5.2 The Kinoulton amendments changed the journey times for local trips at the southern<br />
end <strong>of</strong> the Scheme. However, these changes were very small in comparison to the<br />
overall travel time benefits delivered by the whole Scheme. The updated travel time<br />
savings for the Scheme were presented at the 2010 Public Inquiry. The travel time<br />
savings will not change substantially as a result <strong>of</strong> the <strong>2011</strong> draft Supplementary<br />
Orders.<br />