19.05.2014 Views

Sample NMS Reference Report by YONTCHANG G - University of ...

Sample NMS Reference Report by YONTCHANG G - University of ...

Sample NMS Reference Report by YONTCHANG G - University of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Text boxes showing the chance (proportion) <strong>of</strong> experiencing floods and crop failure<br />

during the month <strong>of</strong> August:<br />

Simple Models - Normal Distribution, One <strong>Sample</strong><br />

TINt 'Flooding'<br />

Normal model, one sample<br />

Column Flooding<br />

<strong>Sample</strong> size 57<br />

Minimum 0<br />

Maximum 308<br />

Range 308<br />

Mean 214<br />

Std. deviation 76.272<br />

Standard error <strong>of</strong> mean = 10.103 with 56 d.f.<br />

95% confidence interval for mean 193.76 to 234.24<br />

From our sample <strong>of</strong> 57 years, the true mean date <strong>of</strong> the start <strong>of</strong> threatening flooding ( from<br />

1 st August, 100mm or more <strong>of</strong> rain/ 1day) is estimated to be day 214(1.August) and is highly<br />

likely to be between day 193 (11.July) and day 234 (21.August). I am 95% confident that the<br />

margin error is ± 20 days (about 3 weeks).<br />

WEEK 1 CHANCE OF CROP FAILURE<br />

One proportion - binomial model<br />

BINomial;stats 57 12;SIMple;EXAct<br />

Binomial model, single sample<br />

<strong>Sample</strong> size 57<br />

Successes 12<br />

Proportion 0.211<br />

Approx s.e. <strong>of</strong> proportion = 0.054<br />

Exact results:<br />

95% confidence interval for prop. 0.114 to 0.339<br />

Simple normal approximation:<br />

95% confidence interval for prop. 0.105 to 0.316<br />

The 95% confidence interval for the true risk <strong>of</strong> flooding with crop failure for the first week in<br />

August is from 11.4% to 33.9%.<br />

Estimated value (proportion) = 0.211 (21.1%)<br />

s.e. = 0.054 (5.4%)<br />

The risk <strong>of</strong> crop failure during week 1 <strong>of</strong> August is (12/57): 21.05% or about 21% with a<br />

return period <strong>of</strong> (1/0.2105 = 4.75) about 5 years. I am 95% confident that the estimate <strong>of</strong><br />

21.1% is within ± 11.25% <strong>of</strong> the true risk <strong>of</strong> flooding with crop failure for the first week..<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!