Consolidated - Catalog 1700 series
Consolidated - Catalog 1700 series
Consolidated - Catalog 1700 series
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>1700</strong><br />
Dimensions & Weights (metric)<br />
1/2-14 NPT Drain<br />
Drain Location<br />
45°<br />
45°<br />
E<br />
45°<br />
45°<br />
J<br />
Cap and lever may be rotated 45°<br />
horizontally to either side of centerline<br />
Drain location for 4" & 6"<br />
valves is on centerline of outlet<br />
***<br />
F<br />
Anchor discharge<br />
piping solidly to<br />
building structure<br />
Fabricated<br />
steel drip pan<br />
D<br />
DISMANTLING<br />
HEIGHT (MAX.)<br />
G<br />
Vent(NPT)<br />
(see caution)<br />
Drain<br />
H<br />
C<br />
(MAX.)<br />
**<br />
** Max. Dims<br />
3" 150# - 184.2mm<br />
6" 150# - 317.5mm<br />
8" 150# - 406.4mm<br />
See Notes 1 & 2<br />
B<br />
(± 1.6mm)<br />
A<br />
( ± 1.6mm)<br />
! C A U T I O N<br />
Steam flow will occur through the coverplate vent<br />
when the valve is in the open position. Do not plug.<br />
Pipe to safe location. Refer to maintenance manual<br />
for instructions.<br />
Notes:<br />
1. For lever clearance dimensions see page <strong>1700</strong>.31.<br />
2. Appropriate considerations should be made for draining any condensate which may accumulate in<br />
the cover plate vent piping, body bowl drain, and drip pan elbow arrangement. See maintenance manual.<br />
F<br />
K<br />
***The EVT-I and Hydroset require<br />
381mm clearance.<br />
The EVT-II requires 432mm clearance,<br />
and an additional 203mm is required when<br />
the assisted closing device is utilized.<br />
<strong>1700</strong>.29