Vanderbijlpark reliability initiatives:<br />
Strip processing lines<br />
• Significant improvements made in unplanned stoppage rates<br />
18.9<br />
Galvanizing line<br />
(hours between stoppages)<br />
20.8<br />
17.6<br />
Pickling line<br />
(hours between stoppages)<br />
1.89<br />
2.27<br />
14.6<br />
1.24<br />
1.29<br />
2011<br />
2012<br />
2013 YTD<br />
Target<br />
2011 2012 2013 YTD Target<br />
• Mean time between failure describes <strong>the</strong> time in hours between two unplanned<br />
stops of a processing line<br />