Asset optimisation at Vanderbijlpark<br />
• Closure of electric arc furnace<br />
– Vanderbijlpark has sufficient capacity to meet domestic and<br />
AOL demand<br />
– Allows <strong>the</strong> full utilization of <strong>the</strong> BF route<br />
• Closure of caster 3<br />
– Improve productivity of casters V1 and V2<br />
• Closure of coke oven battery 3<br />
– Reduced blast furnace consumption<br />
– Import coke for Saldanha steel is more cost effective<br />
– poor technical status of battery 3 required stop of production<br />
• Improve productivity in cold rolling mills<br />
– Run pickling line / cold rolling north at full capacity<br />
– Restructure shift pattern in cold rolling south<br />