DETAILED PROJECT REPORT (DPR) DWDU – Bhavnagar<br />

Entry Point Activity:<br />

Entry point activity is an important work for <strong>project</strong> implementation Agency (PIA) , which will help them to establish rapport with village people and<br />

get in to the village. So entry point activity should be selected very carefully which will give benefit to all village people. Success <strong>of</strong> any <strong>project</strong> depends on<br />

involvement <strong>of</strong> local community. Villagers are the important stake holders who will be directly benefited from the <strong>project</strong>. Entry point activity is done during<br />

first phase <strong>of</strong> the <strong>project</strong>. It is done solve immediate problem <strong>of</strong> the village and create good impression & feeling so the villager support the watershed<br />

<strong>project</strong> & it can be run successfully.<br />

The village is facing acute shortage <strong>of</strong> water. One check dam constructed by villagers however its apron wall had not been made due to lack <strong>of</strong> sufficient<br />

fund. So their first requirement is to construct apron wall the check dam. Another big problem in the <strong>project</strong> area is <strong>of</strong> crop protection, animals like antelope,<br />

deer, pig spoil atleast 20 percent <strong>of</strong> crop output. If we reduce it then production will automatically raise. So it can be protected by electric shock & sound<br />

system. When animal touch the line it get electric shock & sound come out so it will run away.<br />

S.<br />

No.<br />

Names <strong>of</strong> Villages<br />

Amount<br />

earmarked for<br />

EPA<br />

1 Limbada 8.20<br />

2 Ranghola 5.88<br />

Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.)<br />

Entry Point Activities planned<br />

Estimated<br />

cost<br />

Cause Way cum check dam 4.80<br />

Fund Used<br />

under IWMP<br />

Fund<br />

Available by<br />

Convergence<br />

Convergence<br />

Scheme<br />

Expected<br />

outcome<br />

- - - Surface<br />

Water<br />

storage<br />

Agro Crop Training 0.25<br />

- - Improve<br />

Productivity<br />

Books For Library 0.20 - - -<br />

Travis 0.32 - - -<br />

Repair <strong>of</strong> check dam 2.75<br />

- - - Conserve<br />

Water<br />

- - -<br />

Travis 0.32 - -<br />

Cause way Cum Check Dam 4.73 - - -<br />

Improved Crematoria 0.32 - - - Save tree