DETAILED PROJECT REPORT (DPR) DWDU – Bhavnagar<br />
Surface water storage structure<br />
Table no.37.1: Activities related to recharging ground water resources in the <strong>project</strong> areas (all financial figures in lakh Rs.)<br />
Proposed target<br />
Augmentation/ repair <strong>of</strong> existing Construction <strong>of</strong> new recharging<br />
S. No. Name <strong>of</strong> Villages Type <strong>of</strong> structures recharging structures<br />
structures<br />
Total target<br />
No.<br />
Area to be Estimated<br />
Area to be Estimated Area to be Estimated<br />
No.<br />
irrigated (ha) cost<br />
irrigated (ha) cost irrigated (ha) cost<br />
1 Limbada<br />
(i)Open wells 20 30 2.00 30 2.00<br />
Total for the village<br />
2 Ranghola<br />
(i)Open wells 10 50 1.00 50 1.00<br />
Total for the village<br />
3 Langala<br />
(i)Open wells 10 100 1.00 50 1.00<br />
Total for the village<br />
4 Devaliya<br />
(i)Open wells 10 40 1.00 40 1.00<br />
Total for the village<br />
5 Dedakadi<br />
(i)Open wells 10 40 0.50 40 1.00<br />
Total for the village<br />
Total for the Project 210.00 6.00