SCOTSMAN EUROPE SERVICE DEPARTMENT
SCOTSMAN EUROPE SERVICE DEPARTMENT
SCOTSMAN EUROPE SERVICE DEPARTMENT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SCOTSMAN</strong> <strong>EUROPE</strong> <strong>SERVICE</strong> <strong>DEPARTMENT</strong><br />
SP-09.04 – FEBR. ‘09<br />
NEW CUBER PC BOARD<br />
P/N 620462 06<br />
TEST JUMPER<br />
On the PC Board P/N 620462 06 there are four jumpers to select:<br />
• 6 or 12 months remind time for the water system cleaning<br />
• Operation of the Purge Out Water Pump (Jump IN on EC series)<br />
• 3 or 60 minutes delay time at first start up (3minutes in all new AC Series)<br />
• TEST<br />
In case the TEST contacts are closed with the Jumper, at the Start Up of the machine the<br />
PC Board energizes all the electrical components for maximum 3 minutes time.<br />
At the end of the 3 minutes the PC Board switch OFF the entire machine with the<br />
blinking of all the LED’s as shown on the bottom drawing.<br />
EC SERIES<br />
6-12<br />
MONTHS<br />
03 OR 60 MINUTES<br />
DELAY<br />
TEST<br />
BLINKING<br />
SYEN<br />
ON STEADY