29.06.2014 Views

SCOTSMAN EUROPE SERVICE DEPARTMENT

SCOTSMAN EUROPE SERVICE DEPARTMENT

SCOTSMAN EUROPE SERVICE DEPARTMENT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SCOTSMAN</strong> <strong>EUROPE</strong> <strong>SERVICE</strong> <strong>DEPARTMENT</strong><br />

SP-09.04 – FEBR. ‘09<br />

NEW CUBER PC BOARD<br />

P/N 620462 06<br />

TEST JUMPER<br />

On the PC Board P/N 620462 06 there are four jumpers to select:<br />

• 6 or 12 months remind time for the water system cleaning<br />

• Operation of the Purge Out Water Pump (Jump IN on EC series)<br />

• 3 or 60 minutes delay time at first start up (3minutes in all new AC Series)<br />

• TEST<br />

In case the TEST contacts are closed with the Jumper, at the Start Up of the machine the<br />

PC Board energizes all the electrical components for maximum 3 minutes time.<br />

At the end of the 3 minutes the PC Board switch OFF the entire machine with the<br />

blinking of all the LED’s as shown on the bottom drawing.<br />

EC SERIES<br />

6-12<br />

MONTHS<br />

03 OR 60 MINUTES<br />

DELAY<br />

TEST<br />

BLINKING<br />

SYEN<br />

ON STEADY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!