----------------------- . ---~-------------~--'------------------------------------------------------------~,<br />

SECRET<br />

SYSTEM 1Jn~&<br />

1. COMPONENT Llf'E-TESTING PROGRAM<br />

a. Beacons and Destructor Assembly<br />

<strong>The</strong> S-band beacon subsystem, whi,ch includes<br />

the destructor channel, and the L-band beacon have<br />

completed the scheduled IOOO-hour life test at Telerad,<br />

Flemington, Ne,~ Jersey. Table misil summary<br />

of significant test results.<br />

Upon return of the S-bandbeaconto Bt!ll Alrcrait<br />

Corporation, a design analysis will be condl.tcted on the<br />

receiver-transmitter unit to determine the cause of<br />

(lve repetitive failures of a 2021 tube.<br />

b. Servo Amplifie!rs<br />

Reliability life testuJg of the SUt repackaged<br />

servo amplifiers has been completed at Federal<br />

Telecommunlcation81 Laboratory. <strong>The</strong> test Iscycllcal<br />

In nature and Is performed under a combined temperature,<br />

vibration, and a.\Utude environment, Design<br />

evaluation reports on this work are being analyzed at<br />

Bell Aircraft.<br />

c, Servo SubSystelll<br />

A lOOO-hour life test is belng conducted on components<br />

of the following Rascal systems. <strong>The</strong> components<br />

are generally of GAM-63A No, 74 configuration<br />

and are being tested in the airframe of GAM-6M N~.<br />

72.<br />

As of 22 March, 26 cyci.es of composite operation<br />

plus a check cycle conducted at the end of every<br />

10th composite have been completed, A total of 340<br />

operating hours tuu.' resulted In the following rel!­<br />

ablllty-lylle fallures:<br />

<strong>System</strong> or Component<br />

Nonemanating Guidance<br />

<strong>System</strong> (IRCS)<br />

Rellability<br />

EDR's<br />

Parts<br />

Failures<br />

1 1<br />

Fllght Centro! <strong>System</strong> 32 17<br />

Servo Components,<br />

Radar Set<br />

Servo Components,<br />

Radio Set<br />

1 1<br />

GAM-63A Awtlilary <strong>System</strong> 1 1<br />

(Includes hydraulic and finfold<br />

subsystem and most of<br />

electrical subsystem components)<br />

d. Blower Motors<br />

Twenty Western Gear F2-3 blower motors are<br />

being tested to fallure under an ambient temperature<br />

2<br />

TABLE m<br />

TEST RESULTS -<br />

S-BAND AND L-BAND COMPONENTS<br />

S-Band<br />

Components<br />

RellabUtty<br />

Gonis<br />

Observed<br />

RellabiliUes<br />

ReUablllty- Type<br />

Failures<br />

Destructor AsselQbly 99.8% 99.8% 2 parts failures<br />

Rec9iver-Transmitter 99.6% 99.2% 6 parts failures<br />

2 adjustments<br />

Power fQppl." 99.8% 99.9% 1 adjustment<br />

Complete Unit 99.2% 98.9% 8 parts failures<br />

3 adjustments<br />

L-Bar:d<br />

Components<br />

Recelver-Transmitter<br />

ReUabUity<br />

Goals<br />

98.8%<br />

Observed<br />

ReliabUlUes<br />

99. '1%<br />

Power &Upply 99.9% 100 %<br />

Reliability - Type<br />

Failures<br />

4 parts fallures<br />

Complete Unit 98.8% 99. '1% 4 parts failures<br />

Report No. 56-981-021-48<br />

5 ECRET<br />

19<br />

;<br />

,<br />

•,<br />

-J