01.07.2014 Views

System 112A - The Black Vault

System 112A - The Black Vault

System 112A - The Black Vault

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

,------- - -._----------------------,<br />

BEL V~ CauUITIOI<br />

SECRET<br />

,.<br />

--<br />

---------------------------------------------------------------------~ <br />

of 125°C. All bearings have been greased In accordance<br />

with BLC 160-1. In add1t10n, lubricated dust<br />

caps were placed over the rear bearing on four of the<br />

motors. All motors are cycled on-off periodically,<br />

and the test wUl be continued until eacb motor has<br />

falled twice.<br />

Thus far, 510 test hours had been accumUlated.<br />

Four (uncapped) motors failed twice and were removed<br />

[rom test. In each case, the Initial failure was<br />

due to bearing contamination and wear; the second<br />

fallure, after replacing tile bearings, was attributed<br />

to rotor binding In the stator.<br />

A fifth motor, containing a dust cap, faUed<br />

because of open windings at 413 hours and was removed<br />

from test. Two of the remaining 15 motors<br />

still In operation have failed once; neither had dust<br />

covers. <strong>The</strong> fallure In each case was attributed to<br />

contaminated and worn bearings.<br />

e. Completed Life Tests<br />

<strong>The</strong> following life test programs ....ere completed<br />

prior to this quarter. Test reports will be issued<br />

after final evaluation of data.<br />

(.) Radio Set, AN/DSW-l, Relay and Command<br />

Subsystem (less servo components)<br />

(2) Radar Set, AN/DPS-3, Unattended Search<br />

Radar Subsystem (less servo components)<br />

(3) FuzUlg <strong>System</strong> Components<br />

(4) Missile Simulator Group<br />

(5) YLR-67-BA-9 Rocket Engine<br />

(6) ModlCted servo AmpUfl.ers<br />

2. MISSILE LIFE TEST PROGRAM<br />

a. GAM-63A No. 78<br />

In the life test progrlUll, missile No. 78 has<br />

completed 80 tests, Including 75 composite systems<br />

tests. A summary of testing results follows:<br />

20<br />

(1) Laboratory testing, less vibration, less<br />

power plant<br />

Reliability for 1st10 compoeites 68%<br />

RellablIlty for 2nd 10 compo61~~e 77%<br />

Rellablllty for 3rd10 composites 77%<br />

Rellabtllty for 4th 10 composites 87%<br />

Rellabtllty for 5th 10 composites 63%<br />

Cumulative reliab1l1ty for the<br />

50 composites 77%<br />

(2) Vibration testing phase<br />

Rellab1llty for missile, les8 pro­<br />

pulftion system, including vibra­<br />

tional tests <br />

ReJlab1llty for 10 vibrational <br />

tests alone<br />

(3) Propulsion testing phase (15 tests<br />

conducted at _55 0 to _65 0 F)<br />

ReliabUlty for missile, less propulsion<br />

system a..lCl asSOCiated<br />

GAM-63A awdllary equipment<br />

ReUabtHty for propulsion system<br />

70% <br />

Rel1abUlty for miSSile, IncludlrJg<br />

propulsion system 50%<br />

(4) Cumulative rellabll1ty for miSSile,<br />

less propulSion system, for 80<br />

tests 76%*<br />

50 compOSites at ambient temperature<br />

10 composite3 under 'libraUon<br />

10 compoaltea (Propulsion system op­<br />

5 Incomplete (eratlng at cold tempcompol!lltes<br />

(erature<br />

5 reference compos1tes at cold temperature<br />

ljIStatistically, the 73% and 76% reUablUtles are<br />

not considered Significantly different.<br />

GAM-63A No. 78 is now at the Wheatfield plant<br />

being prepared for altitude chamber environmental<br />

tests. <strong>The</strong> tests will consist of 55 composite systems<br />

testa ill 11 groups of five teats each. Teatlng<br />

will be peJ'formed at temperatures ranging from<br />

_100 0 to +2oo°F and at altitudes up to 100,000 feet.<br />

b. GAM-63A No. 86<br />

<strong>The</strong> second life-test miSSile, GAM No. 86, is<br />

awaiting the start of the Initial phase of the life-wst<br />

program which will Include 50 composite syste14S<br />

tests. <strong>The</strong>se testa will provide additlonal data ~rtinent<br />

to determining the rellabiHty of the present<br />

weapon system.<br />

3. ENVIRONMENTAL RE-EVALUATION PROGMM<br />

Testing of the flight control and inertial rangecomputing<br />

systems is contlnulng in the environmental<br />

re-evaluatlon program. Thus far, 1612 environmental<br />

tests had been completed OD electronic and<br />

SECRET<br />

. - - --.­<br />

~<br />

J

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!