of 125°C. All bearings have been greased In accordance<br />
with BLC 160-1. In add1t10n, lubricated dust<br />
caps were placed over the rear bearing on four of the<br />
motors. All motors are cycled on-off periodically,<br />
and the test wUl be continued until eacb motor has<br />
falled twice.<br />
Thus far, 510 test hours had been accumUlated.<br />
Four (uncapped) motors failed twice and were removed<br />
[rom test. In each case, the Initial failure was<br />
due to bearing contamination and wear; the second<br />
fallure, after replacing tile bearings, was attributed<br />
to rotor binding In the stator.<br />
A fifth motor, containing a dust cap, faUed<br />
because of open windings at 413 hours and was removed<br />
from test. Two of the remaining 15 motors<br />
still In operation have failed once; neither had dust<br />
covers. <strong>The</strong> fallure In each case was attributed to<br />
contaminated and worn bearings.<br />
e. Completed Life Tests<br />
<strong>The</strong> following life test programs ....ere completed<br />
prior to this quarter. Test reports will be issued<br />
after final evaluation of data.<br />
(.) Radio Set, AN/DSW-l, Relay and Command<br />
Subsystem (less servo components)<br />
(2) Radar Set, AN/DPS-3, Unattended Search<br />
Radar Subsystem (less servo components)<br />
(3) FuzUlg <strong>System</strong> Components<br />
(4) Missile Simulator Group<br />
(5) YLR-67-BA-9 Rocket Engine<br />
(6) ModlCted servo AmpUfl.ers<br />
2. MISSILE LIFE TEST PROGRAM<br />
a. GAM-63A No. 78<br />
In the life test progrlUll, missile No. 78 has<br />
completed 80 tests, Including 75 composite systems<br />
tests. A summary of testing results follows:<br />
20<br />
(1) Laboratory testing, less vibration, less<br />
power plant<br />
Reliability for 1st10 compoeites 68%<br />
RellablIlty for 2nd 10 compo61~~e 77%<br />
Rellablllty for 3rd10 composites 77%<br />
Rellabtllty for 4th 10 composites 87%<br />
Rellabtllty for 5th 10 composites 63%<br />
Cumulative reliab1l1ty for the<br />
50 composites 77%<br />
(2) Vibration testing phase<br />
Rellab1llty for missile, les8 pro<br />
pulftion system, including vibra<br />
tional tests <br />
ReJlab1llty for 10 vibrational <br />
tests alone<br />
(3) Propulsion testing phase (15 tests<br />
conducted at _55 0 to _65 0 F)<br />
ReliabUlty for missile, less propulsion<br />
system a..lCl asSOCiated<br />
GAM-63A awdllary equipment<br />
ReUabtHty for propulsion system<br />
70% <br />
Rel1abUlty for miSSile, IncludlrJg<br />
propulsion system 50%<br />
(4) Cumulative rellabll1ty for miSSile,<br />
less propulSion system, for 80<br />
tests 76%*<br />
50 compOSites at ambient temperature<br />
10 composite3 under 'libraUon<br />
10 compoaltea (Propulsion system op<br />
5 Incomplete (eratlng at cold tempcompol!lltes<br />
(erature<br />
5 reference compos1tes at cold temperature<br />
ljIStatistically, the 73% and 76% reUablUtles are<br />
not considered Significantly different.<br />
GAM-63A No. 78 is now at the Wheatfield plant<br />
being prepared for altitude chamber environmental<br />
tests. <strong>The</strong> tests will consist of 55 composite systems<br />
testa ill 11 groups of five teats each. Teatlng<br />
will be peJ'formed at temperatures ranging from<br />
_100 0 to +2oo°F and at altitudes up to 100,000 feet.<br />
b. GAM-63A No. 86<br />
<strong>The</strong> second life-test miSSile, GAM No. 86, is<br />
awaiting the start of the Initial phase of the life-wst<br />
program which will Include 50 composite syste14S<br />
tests. <strong>The</strong>se testa will provide additlonal data ~rtinent<br />
to determining the rellabiHty of the present<br />
weapon system.<br />
3. ENVIRONMENTAL RE-EVALUATION PROGMM<br />
Testing of the flight control and inertial rangecomputing<br />
systems is contlnulng in the environmental<br />
re-evaluatlon program. Thus far, 1612 environmental<br />
tests had been completed OD electronic and<br />