Residents' Evacuation Capability in Buildings
Residents' Evacuation Capability in Buildings
Residents' Evacuation Capability in Buildings
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11<br />
%<br />
50<br />
40<br />
30<br />
Need<strong>in</strong>g no assistance<br />
Need<strong>in</strong>g a help<strong>in</strong>g hand<br />
Need<strong>in</strong>g assistance from 1 staf<br />
Need<strong>in</strong>g assistance from 2 staf<br />
20<br />
10<br />
Service<br />
flats<br />
Old age<br />
homes<br />
Group<br />
dwell<strong>in</strong>gs<br />
Figure 6. Need for help from members of the staff <strong>in</strong> various types of care hous<strong>in</strong>g.<br />
Percentage distribution.<br />
The average staff need per resident <strong>in</strong> an emergency situation is 1.2 <strong>in</strong> blocks of service<br />
flats, 1.3 <strong>in</strong> old people«s homes and 1.2 <strong>in</strong> group-residential units.<br />
DISCUSSION<br />
Safety design <strong>in</strong> care hous<strong>in</strong>g<br />
Fire protection provisions for care hous<strong>in</strong>g are proposed <strong>in</strong> a manual concern<strong>in</strong>g safety<br />
measures [3]. The recommendations are based on results of analyses of evacuation<br />
capability. The manual is arranged accord<strong>in</strong>g to the purpose of fire protection measures<br />
related to the plann<strong>in</strong>g and build<strong>in</strong>g process. Requirements are expressed at the program<br />
stage and specified at the plann<strong>in</strong>g stage of the build<strong>in</strong>g process. At the design stage<br />
technical preparations are made. They are implemented at the construction stage.<br />
Management and use belong to the operation stage.<br />
Residents <strong>Evacuation</strong> <strong>Capability</strong> <strong>in</strong> Build<strong>in</strong>gs…., Gun Hallberg, Domotic Lab. KTH, Stockholm 1993