26.08.2014 Views

10.5 PREHEATING

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The inspector should review the material test report to confirm that the<br />

material(s) being used for fabrication of new equipment or repair of existing<br />

equipment meet the requirements specified by the user. The welding<br />

engineer can also use the information from a materials test report to<br />

determine the weldability of the materials to be used, and to recommend<br />

proper welding procedures, pre-heat and/or post-weld heat treatment. The<br />

chemical analysis given in the test report can be used to calculate the carbon<br />

equivalent for that material. It is important to note that materials test reports<br />

are not generally supplied to the purchaser unless requested.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!